focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNAUT.L Regulatory News (NAUT)

  • There is currently no data for NAUT

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Well Test Result

27 Aug 2008 07:00

RNS Number : 0570C
Global Energy Development PLC
27 August 2008
 



Immediate Release 27 August 2008

GLOBAL ENERGY DEVELOPMENT PLC

TWO FURTHER SUCCESSFUL TEST RESULTS FOR TILODIRAN 3 WELL

FOUR PRODUCTIVE FORMATIONS TESTED IN TOTAL

Global Energy Development PLC (the "Company"), the Latin America focused petroleum exploration and production company (LSE-AIM: "GED"), which operates in Colombia through its wholly-owned subsidiary Harken de Colombia Limited, is pleased to announce two further successful test results for the Tilodiran 3 well within the Colombian Rio Verde contract. These results confirm four productive formations in the Tilodiran 3 well and the overall Tilodiran field.

The Tilodiran 3 well was drilled directionally to a total depth of 13,200 feet and a conventional drill stem test ("DST") was performed in the Mirador formation. The interval was perforated from 11,652 to 11,662 feet resulting in a stabilized natural flow rate of 105 barrels of oil per day ("bopd") of 21 degrees API gravity, with a water cut of 0.5% on a choke of 18/64" and a flowing wellhead pressure of 21 psi. The results of the test conclusively demonstrate the existence of a previously unrecognized oil bearing reservoir in the Mirador formation in the Tilodiran fieldThe observed flow rate is less than has been observed in Mirador reservoirs with similar log-derived petrophysical properties in the Llanos basin. Therefore, management anticipates that allowing the formation to produce at higher pressure differentials on pump for an extended time period may result in more typical production rates for this reservoir.

The Company next performed a combined test of the Middle/Upper Gacheta formation, from perforations at 12,672 to 12,680 feet and 12,690 to 12,694 feet, and the Lower Gacheta formation, from perforations at 12,744 to 12,748 feet and 12,806 to 12,814 feet. This resulted in a stabilized natural flow rate of 480 bopd of 16.9 degrees API gravity on a choke of 28/64", a gas/oil ratio ("GOR") of 280 scf per barrel and a water cut of 2%, which analyses as completion fluid and is expected to further reduce as the well continues to clean up. A surfactant stimulation had been performed on both the intervals. However, the improvement in rate indicates the treatment was not effective in stimulating the Middle/Upper Gacheta interval, which is currently producing 518 bopd on pump in the Tilodiran 2 well. Consequently, this interval has been isolated and a stimulation treatment will be performed over the next few days.  The Middle/Upper Gacheta tested at a natural flow rate of 120 bopd in the Tilodiran 2 well, comparable to the Tilodiran 3 test, and when this well was completed with an electric submersible pump the rate increased to 814 bopd.

The previously tested Ubaque and Lower Gacheta formationin the Tilodiran 3 well produced at stabilized natural flow rates of 322 bopd and 400 bopd respectively. 

At the conclusion of the testing of the Tilodiran 3 well, the Company will analyse all the available flow and pressure data to determine the optimum completion to maximize production rates and reserve recovery.  An electric submersible pump will be installed in the well to enhance the production. 

Information available so far from the drilling of the Tilodiran 3 well and drainage area estimates from the Tilodiran 2 well indicates, in the management's opinion, that the Tilodiran field is larger than previously mapped and that further development wells could be drilled. A 3D seismic program is currently being designed to better image the extended flanks of the field and pick drilling locations.

For further information:

Global Energy Development PLC

Catherine Miles, Company Secretary +44 (0) 20 7763 7177

www.globalenergyplc.com +44 (0) 7909918034

Landsbanki Securities (UK) Limited  +44 (0) 20 7426 9000

Fred Walsh / Sebastian Jones

Notes to Editors:

The Company's shares have been traded on AIM, a market operated by the London Stock Exchange, since March 2002 (LSE-AIM: "GED"). The Company's balanced portfolio covers the countries of ColombiaPeru and Panama and comprises a base of production, developmental drilling and workover opportunities and several high-potential exploration projects.

The information contained within this announcement has been reviewed by Mr. Stephen Voss and Mr. Stephen Newton, both Directors of the Company. Mr. Voss is a Registered Professional Engineer in Texas and has been a Member of SPE for 25 years. Mr. Newton holds a Mining/Petroleum Engineering degree from the University of QueenslandBrisbane and a Master of Science Petroleum Engineering degree from Imperial College London. He has been a Member of SPE for 35 years.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLILFVETTIRFIT
Date   Source Headline
1st Jul 200811:59 amRNSNotifiable Interest
10th Jun 20088:00 amRNSDrilling Update
5th Jun 20083:25 pmRNSPosting of Annual Report and
4th Jun 20083:00 pmRNSNotifiable Interest
2nd Jun 20087:00 amRNSWell Test Results
8th May 20087:01 amRNSFinal Results
14th Apr 20087:01 amRNSDrilling Update
9th Apr 20087:00 amRNSReserve Report
18th Mar 20082:30 pmRNSNotifiable Interest
12th Mar 20087:01 amRNSRig Mobilisation
7th Mar 200811:54 amRNSDirector Shareholding
7th Mar 20087:00 amRNSBoard Appointment
5th Mar 20087:01 amRNSUpdate
3rd Mar 200812:37 pmRNSDirector Shareholding
26th Feb 20082:21 pmRNSDirector Shareholding
21st Feb 20089:41 amRNSShare Options
12th Feb 20087:00 amRNSAppointment
6th Feb 20087:01 amRNSRig Contract
3rd Jan 20088:31 amRNSDirector Shareholding
17th Dec 20078:48 amRNSEPT Disclosure
17th Dec 20077:01 amRNSOffer Talks Terminated
11th Dec 20079:33 amRNSEPT Disclosure
11th Dec 20077:01 amRNSOperations Update
6th Dec 20078:41 amRNSEPT Disclosure
4th Dec 20079:04 amRNSEPT Disclosure
3rd Dec 20079:36 amRNSEPT Disclosure
30th Nov 20078:46 amRNSEPT Disclosure
29th Nov 20078:30 amRNSEPT Disclosure
28th Nov 200711:04 amRNSEPT Disclosure
26th Nov 200710:40 amRNSEPT Disclosure
21st Nov 20079:52 amRNSEPT Disclosure
19th Nov 20079:03 amRNSEPT Disclosure
14th Nov 20078:54 amRNSEPT Disclosure
31st Oct 200710:26 amRNSEPT Disclosure
30th Oct 20078:31 amRNSEPT Disclosure
15th Oct 20079:10 amRNSEPT Disclosure
8th Oct 20078:49 amRNSEPT Disclosure
5th Oct 20078:45 amRNSEPT Disclosure
4th Oct 20072:57 pmRNSRule 8.3- Global Energy Dev
4th Oct 20078:47 amRNSEPT Disclosure
2nd Oct 20071:39 pmRNSRule 8.3- Global Energy Dev
2nd Oct 20079:59 amRNSEPT Disclosure
1st Oct 20073:02 pmRNSRule 8.3- Global Energy Dev
1st Oct 20078:59 amRNSEPT Disclosure
28th Sep 20072:29 pmRNSRule 8.3- Global Energy Dev
28th Sep 20078:42 amRNSEPT Disclosure
27th Sep 20074:18 pmRNSNotifiable Interest
27th Sep 20078:24 amRNSEPT Disclosure
25th Sep 20071:02 pmRNSRule 8.3- Global Energy Dev
25th Sep 20078:57 amRNSEPT Disclosure

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.