The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.90
Bid: 2.80
Ask: 3.00
Change: -0.10 (-3.33%)
Spread: 0.20 (7.143%)
Open: 3.00
High: 3.00
Low: 2.80
Prev. Close: 3.00
MATD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Rig Contract Awards

16 Apr 2019 07:00

RNS Number : 2541W
Petro Matad Limited
16 April 2019
 

THE INFORMATION CONTAINED WITHIN THIS ANNOUNCEMENT IS DEEMED BY PETRO MATAD LIMITED TO CONSTITUTE INSIDE INFORMATION AS STIPULATED UNDER THE MARKET ABUSE REGULATION (EU) NO. 596/2014 ("MAR"). ON THE PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE ("RIS"), THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

 

16 April 2019

 

Petro Matad Limited

("Petro Matad" or the "Company")

Rig Contract Awards

Petro Matad Limited (AIM: MATD), the AIM-quoted Mongolian oil explorer, is pleased to announce that it has signed contracts for two rigs for its upcoming 2019 four well drilling programme.

Highlights:

· Four well fully-funded programme remains on track for completion in 2019

· Two rig contracts signed and both rigs in close proximity to Block XX

· Heron 1 and Red Deer 1 wells expected to spud in July

· Spudding of Gazelle 1 will follow completion of drilling at Heron 1

· Rig contracts allow for possibility of immediate appraisal of any discovery

Rig contracts signed

The Company has contracted DQE International, Mongolia's most experienced and active drilling operator, for its Rig 40105, to drill the Heron 1 and Gazelle 1 wells in the north of Block XX. The contract gives the Company the option to drill an additional well to allow for immediate appraisal of any discovery made during the 2019 drilling programme. Any discovery will be tested using a separate workover rig. The rig was drilling in neighbouring Block XIX up until the end of the last drilling season, so mobilisation will be short and logistically straightforward.

The second contract is with Daton Petroleum Engineering and Oilfield Service LLC, for their Rig DXZ1, to drill the Red Deer 1 well in the south of Block XX. The contract gives Petro Matad the option to drill a second well, to either appraise any discovery made in Red Deer 1 or for drilling in Block V in western Mongolia. Any testing operations will be performed by a separate workover rig. Daton's rig was working until the end of 2018 and is currently located approximately 125km east of the Red Deer location, so mobilisation to Block XX will be relatively short.

Updated drilling schedule

The Company expects to spud Heron 1 in early July. The spud date has been moved back to allow for certain electrical and safety modifications to the rig ahead of drilling.

Heron 1 will be drilled to a planned total depth (TD) of 3,050m and will take approximately 40 days to drill and log. On completion of operations at Heron, the rig will immediately move to the Gazelle 1 location. Gazelle 1 will take approximately 35 days to drill and log. The planned TD is 2,500m.

Red Deer 1 is expected to spud in July and is forecast to take 35 days to drill and log. The planned TD of the well is 2,100m. On completion of drilling and depending on the success of the well, the Company will then take the decision to either drill a further well at Red Deer; move the rig to drill a well in Block V; or focus on activities in the north of Block XX.

Running two rigs, with a separate workover rig for any testing operations, gives the Company sufficient time to complete its 2019 four well drilling campaign before the winter operational shutdown late in Q4.

Block XX drilling targets

Heron Prospect

The Company has recently secured access to a high-quality 3D seismic data set which covers the northern part of Block XX. This data, along with recently reprocessed 2D seismic data, clearly shows the Heron Prospect to be a southerly extension of the proven oil-bearing structure drilled by the T19-46-3 discovery well in Block XIX. The latest mapping shows the majority of the structure, including the crest of the trap, lying in Block XX. The Heron Prospect is estimated to have mean recoverable prospective resource potential of 25 MMbo. Heron 1 will be located 1.1km south of the T19-46-3 oil well and is prognosed to encounter the top of the primary reservoir targets at approximately 2800m.

 

Gazelle Prospect

The Gazelle Prospect is located on the south-western flank of the Tamsag Basin, which is the primary source kitchen charging the Block XIX discoveries. The Gazelle 1 well will be drilled 5km west of Heron 1 and 4.5km southwest of the T19-46-1 oil well. The mean prospective recoverable resource assessment for the Gazelle Prospect is 13 MMbo.

 

Red Deer Prospect

The Red Deer 1 well will target a basin centre, fault bounded, structural closure in the southern part of Block XX. The mean prospective recoverable resource assessment for the Red Deer Prospect is 48 MMbo.

 

Mike Buck, the CEO of Petro Matad said:

 

"We are pleased to announce the signing of the two rig contracts which marks a major milestone for the four well drilling programme scheduled for 2019. The contracts secured allow for simultaneous drilling of prospects and immediate appraisal in the event of a discovery which could be transformational for the company. It is an exciting year ahead for Petro Matad and we look forward to working with our contractors to deliver value for our shareholders."

 

 

For further information please contact:

 

Petro Matad Limited

 

Mike Buck, CEO

+976 7014 1099 / +976 7575 1099

 

 

Stockdale (Nominated Adviser and Broker)

Richard Johnson

Andy Crossley

David Coaten

+44 (0) 20 7601 6100

 

Stifel Nicolaus Europe Limited (Broker)

 

Callum Stewart

Nicholas Rhodes

Ashton Clanfield

+44 (0) 20 7710 7600

 

FTI Consulting (Communications Advisory Firm)

Sara Powell

Ben Brewerton

+44 (0) 20 3727 1000

 

 All Reserves and Resources definitions and estimates shown in this report are based on the SPE/AAPG/WPC/SPEE Petroleum Resource Management System ("PRMS").

Technical information in this news release has been reviewed by the Company's Exploration Manager, Mr. Jerry Smart. He has 36 years of industry experience in oil and gas exploration and production with LASMO, Eni, Salamander Energy and Ophir Energy. He holds a B.Sc. in Geology from King's College, London.

Glossary

 

 

MMbo Million barrels of oil

Mean The arithmetic average of the low, mid and high case estimates of recoverable prospective resources

Prospective Resources Estimated volumes associated with undiscovered accumulations. These represent quantities of petroleum which are estimated, as of a given date, to be potentially recoverable from oil and gas deposits identified on the basis of indirect evidence but which have not yet been drilled

 

About Petro Matad

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. At the current time, Petro Matad holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. Block XX has an area of 10,340 square kilometres in the far eastern part of the country, and Blocks IV and V have an area of 28,900 square kilometres and 21,100 square kilometres, respectively, in the southwest part of the country.

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

For further information on Petro Matad Limited, see the website at: www.petromatadgroup.com

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
CNTEELFFKZFZBBE
Date   Source Headline
5th Nov 20093:30 pmRNSHolding(s) in Company
5th Nov 20098:43 amRNSHolding(s) in Company
2nd Nov 200910:12 amRNSWinter Shutdown
22nd Oct 20099:20 amRNSDrilling Contract
1st Oct 20098:03 amRNSTotal Voting Rights
17th Sep 200911:32 amRNSCompletion of share issue
28th Aug 20092:36 pmRNSIssue of Equity
24th Jul 20098:30 amRNSHalf Yearly Report
14th Jul 200911:39 amRNSResult of AGM
8th Jul 20091:54 pmRNSNew Production Sharing Contracts
1st Jul 200912:49 pmRNSHolding(s) in Company
30th Jun 20091:15 pmRNSHolding(s) in Company
30th Jun 20091:15 pmRNSTotal Voting Rights
24th Jun 200910:30 amRNSIssue of Equity
10th Jun 20098:30 amRNSPreliminary Results
9th Apr 20092:45 pmRNSAward of Options
20th Mar 20098:42 amRNSDirector/PDMR Shareholding
2nd Mar 20097:00 amRNSTotal Voting Rights
20th Feb 20097:00 amRNSIssue of Equity
17th Dec 20087:00 amRNSResults of Davsan Tolgoi 2008 3D Seismic Survey
27th Nov 20089:41 amRNSWarrant Extension
8th Oct 20087:00 amRNSInterpretation of 2D Seismic Survey
30th Sep 20087:06 amRNSInterim Results
18th Jul 200810:00 amRNSResults of Seismic Interpreta
27th Jun 200810:04 amRNSAnnual Report and Accounts
26th Jun 20085:06 pmRNSDirectorate Change
25th Jun 20087:00 amRNSFinal Results
9th Jun 20087:00 amRNSSeismic Exploration Contract
1st May 20087:01 amRNSFirst Day of Dealings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.