8 Oct 2008 07:00
ο»Ώ
Petro Matad Limited
Interpretation of the 2008 2D Seismic Survey and Reprocessing Programme
Petro Matad Limited ("PML") appointed Isis Petroleum Consultants Pty Ltd ("ISIS")Β toΒ undertake detailed interpretationΒ and mappingΒ of the 2008 2D seismic dataΒ that wasΒ recently acquiredΒ in Block XX, together withΒ reprocessing ofΒ part ofΒ theΒ pre-existing 2D seismicΒ data setΒ in Block XX. Block XX is located in theΒ TamsagΒ BasinΒ in easternΒ Mongolia,Β over whichΒ PML holds aΒ Production Sharing Contract with the Government of Mongolia.
Consequently,Β ISISΒ prepared the "2008 2D Seismic Survey and ReprocessingΒ Report", which amalgamatesΒ the interpretation and mappingΒ ofΒ the 2008 data to allΒ of the 2DΒ seismic dataΒ previouslyΒ heldΒ and reported uponΒ by PML. TheΒ newΒ database nowΒ consists of theΒ 155 km of new 2D seismic data acquired in 2008Β andΒ 686 km of reprocessed existing pre-2000 2D seismic data, together withΒ the existing high quality 2D seismic data set.Β Β The detailed, semi detailed and regional 2D seismic database now consists of 3,189 km of good to very good quality seismic data.
The new 2008Β fieldΒ data was acquired by Mongolian geophysical consultancy company,Β Khet XXKΒ in April, 2008.
ISIS noted thatΒ Block XX lies immediately adjacentΒ toΒ and updip from theΒ producingΒ Tolson Uul Oil Field, the North West Tolson Uul Oil FieldΒ and theΒ Tolson Uul North Oil Field. A series of horsts and grabens extend to the southwest from the area of the Tolson Uul Oil fields. It is the southwest extension into Block XX of the proven hydrocarbon system in Block XIX that increases the prospectivity of Block XX. The grabens contain a proven and active oil generative source interval while the horsts and rotated faulted blocks areΒ theΒ proven play type in the area.
ISISΒ has reported that the interpretation and mapping matured three prospects,Β confirmed twoΒ strong leads and identifiedΒ nineΒ leads. Prospect 6Ts, Prospect 2TsΒ and Prospect 8TsΒ are all mature prospectsΒ whileΒ strong leads 7Ts and 15Ts and the nine leadsΒ all require additional seismic dataΒ and interpretationΒ to mature them to prospect status.
Following the completion of the interpretation and mapping of the entire PML 2D seismic data set the Mean Unrisked Prospective Resource of the leads and prospects inventory isΒ 726Β MMbbl and the Mean Risked Prospective ResourceΒ of the leads and prospects inventory is 83 MMbbl.
PML's CEO Douglas McGay commented:Β "We are encouraged that the 2008 2D study has re-confirmed the aggregate of our Company's leads and prospects inventory. This fill-in and additional data has added weight to conclusions drawn from previousΒ explorationΒ and further justified the company's faith in the future of Block XX. Importantly, Prospect 8Ts, that is now awaiting the processing and results of the 2008 3D seismic survey, has remained robustΒ following this 2D study. An announcement regarding the results of the 3D seismic will be made after the data has been processed and the report received and reviewed."
|
Further information: |
|
|
Petro Matad Limited |
|
|
Douglas McGayΒ - CEO |
+976 11 331099 |
|
Hanson Westhouse Limited |
|
|
Richard BatyΒ /Β Harry Barraclough |
+44 (0) 20 7601 6100 |
|
Bankside Consultants |
|
|
Simon RothschildΒ /Β Oliver WintersΒ /Β Louise Mason |
+44 (0) 20 7367 8888 |
Technical information in this news release has been reviewed by Mr. Eric Tucker, the Chief Operating Officer and Principal Explorationist withΒ ISIS. Mr. Tucker is a member of the American Association of Petroleum Geologists and the Petroleum Exploration Society of Australia. He holds a Fellowship Diploma in Geology from the Royal Melbourne Institute of Technology and has over 30 years of oilΒ and gas exploration, appraisal and development experience.
Follow the stocks