The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.035
Bid: 0.03
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.01 (33.333%)
Open: 0.035
High: 0.035
Low: 0.035
Prev. Close: 0.035
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Benga Power Plant Project Update

22 Dec 2020 08:00

RNS Number : 4931J
Kibo Energy PLC
22 December 2020
 

Kibo Energy PLC (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN: IE00B97C0C31

("Kibo" or "the Company")

 

Dated: 22 December 2020

 

Kibo Energy PLC ('Kibo' or the 'Company')

 Benga Power Plant Project Update

 

Kibo Energy PLC ("Kibo" or the "Company"), the multi-asset, Africa focused, energy company, is delighted to provide a progress update on the Benga Power Plant Project in Mozambique ("BPPP").

 

Highlights

· Current Non- Binding Term Sheet for Coal Supply from Vale converted into a mutually binding Term Sheet to secure coal supply for BPPP; (See RNS of 5 September 2019);

· Lesedi Nuclear Services (Pty) Ltd ("LNS") completed optimized Definitive Feasibility Study ("DFS") based on current Base Case DFS successfully, enhancing project economic viability and bankability; and

· Findings of the final draft optimized DFS presented to the technical and commercial team of EDM on 17 December 2020.

 

CSTS with Vale

 

The Company has entered into a mutually binding Coal Supply Term Sheet ('CSTS') with Vale Mozambique, S.A. ('Vale') to supply coal to the Benga Power Plant Project in Mozambique ('BPPP'). The CSTS commits the parties to a supply agreement that will meet the full operational coal requirement of a 150 MW (gross generation capacity) coal fired power plant. The CSTS will be converted into a definitive Coal Supply Agreement ("CSA") as part of the process during which a final Power Purchase Agreement ("PPA") is finalized with EDM

 

Vale is a local coal miner, and subsidiary of Vale SA, one of the world's largest diversified miners, situated in very close proximity to the BPPP site. The CSTS with Vale was based on the findings of the optimized DFS which indicated that a blend of varying quality bituminous coal can be fed to the Power Plant CFB boiler. Vale has the capacity and capability to supply the different coal qualities for an optimal blend and the CSTS provides for a supply of c. 650 000 tonnes of coal per annum, structured to supply the various coal qualities required for the optimal blend.

 

Optimized DFS

 

LNS have completed and delivered a final draft of the BPPP optimized DFS study to Kibo. This optimization study focused on conducting various trade-off studies most notably:

 

· Investigating the coal characteristics in more specific detail as well as the tolerance of the coal blending ratio variances in the CFB boilers

· Consideration of various clean coal technologies - (E.g., the power plant has been designed to be 'carbon capture ready')

· Site location study with trade-off work conducted on various other possible sites

· Optimal boiler sizing

· Geotechnical considerations that may impact on building and operating the Benga power plant on the designated site

· Updating of the Financial Model

· Coal haulage road selection

 

The Company is currently reviewing the findings from the optimized DFS and a final version of the optimized DFS will be delivered to the Company in early January 2021. These findings were also presented to EDM during a preliminary DFS-briefing on 17 December 2020. The preliminary briefing concluded with several next steps agreed between the parties. These next steps are in preparation for further technical and commercial discussions that relates to the development and agreement of a PPA, following the agreed process and procedure set out in the existing MOU with EDM. Said discussions have been set for January 2021.

 

Louis Coetzee, CEO of Kibo Energy, commented: 

"We are extremely pleased with the progress on the Benga project, as the technical work is now nearing completion and seamlessly integrates with the commercial and statutory developments. The optimised DFS and binding term sheet for a Coal Sale Agreement are key cornerstones / prerequisites to take the EDM PPA negotiations progressively forward towards agreeing a final PPA."

 

"The ongoing and increasingly negative impact of COVID-19 has caused numerous delays during the past year, most notably regarding the inability to travel freely and conduct on-site work in an unfettered manner. Despite these constraints the BPPP made significant strides forward during 2020 and we have been able to sustain forward momentum and in fact gain significant new momentum towards the end of 2020. It is with this momentum that we will be entering 2021 and with firm confidence that the BPPP can still be delivered within the broad timelines discussed in previous announcements."

 

**ENDS**

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014.

 

For further information please visit www.kibo.energy or contact:

 

Louis Coetzee

info@kibo.energy

Kibo Energy PLC

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

JSE Corporate and Designated Adviser

Thomas Smith

+44 (0) 20 7392 1494

ETX Capital Limited

Joint Broker

Bhavesh Patel / Stephen Allen

+44 20 3440 6800

RFC Ambrian Limited

NOMAD on AIM

Charlotte Page / Beth Melluish

+44 (0) 20 7236 1177

St Brides Partners Ltd

Investor and Media Relations Adviser

 

Notes

Kibo Energy PLC is a multi-asset, Africa focused, energy company positioned to address the acute power deficit, which is one of the primary impediments to economic development in Sub-Saharan Africa. To this end, it is the Company's objective to become a leading independent power producer in the region.

 

Kibo is simultaneously developing three similar coal-fuelled power projects: the Mbeya Coal to Power Project ('MCPP') in Tanzania; the Mabesekwa Coal Independent Power Project ('MCIPP') in Botswana; and the Benga Independent Power Project ('BIPP') in Mozambique. By developing these projects in parallel, the Company intends to leverage considerable economies of scale and timing in respect of strategic partnerships, procurement, equipment, human capital, execution capability / capacity and project finance.

 

Additionally, the Company has a 60% interest in MAST Energy Developments Limited ('MED'), a private UK registered company targeting the development and operation of flexible power plants to service the UK Reserve Power generation market.

 

Johannesburg

22 December 2020

Corporate and Designated Adviser

River Group

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGZMZZNZRGGZG
Date   Source Headline
25th Jan 202112:05 pmRNSTR-1: Standard form notification of major holdings
25th Jan 20217:45 amRNSSloane: Second Site Operational Status Update
25th Jan 20217:00 amRNSAppointment of Broker
15th Jan 20212:06 pmRNSSecond Price Monitoring Extn
15th Jan 20212:00 pmRNSPrice Monitoring Extension
14th Jan 20217:55 amRNSTR-1: Notification of major holdings
12th Jan 20212:06 pmRNSSecond Price Monitoring Extn
12th Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Dec 20208:00 amRNSBenga Power Plant Project Update
21st Dec 20207:00 amRNSSloan (MED) to Trigger 2nd Production-Ready Site
17th Dec 20208:00 amRNSUpdate on PPA with Baobab Resources Ltd
14th Dec 202012:40 pmRNSResults of AGM
11th Dec 20202:05 pmRNSSecond Price Monitoring Extn
11th Dec 20202:00 pmRNSPrice Monitoring Extension
20th Nov 202010:00 amRNSNotice of AGM
20th Nov 20208:00 amRNSTR-1: Notification of major holdings
19th Nov 20204:41 pmRNSSecond Price Monitoring Extn
19th Nov 20204:36 pmRNSPrice Monitoring Extension
12th Nov 202011:06 amRNSSecond Price Monitoring Extn
12th Nov 202011:00 amRNSPrice Monitoring Extension
10th Nov 202011:06 amRNSSecond Price Monitoring Extn
10th Nov 202011:00 amRNSPrice Monitoring Extension
6th Nov 20203:45 pmRNSIssue of Shares in lieu of payment to Contractors
3rd Nov 20204:41 pmRNSSecond Price Monitoring Extn
3rd Nov 20204:35 pmRNSPrice Monitoring Extension
3rd Nov 20202:06 pmRNSSecond Price Monitoring Extn
3rd Nov 20202:00 pmRNSPrice Monitoring Extension
28th Oct 20208:00 amRNSUK Subsidiary Secures Third Reserve Power Site
23rd Oct 20204:41 pmRNSSecond Price Monitoring Extn
23rd Oct 20204:35 pmRNSPrice Monitoring Extension
22nd Oct 20208:00 amRNSUnaudited Interim results 30 June 2020
22nd Oct 20207:55 amRNSTR-1: Notification of major holdings
15th Oct 202011:05 amRNSSecond Price Monitoring Extn
15th Oct 202011:00 amRNSPrice Monitoring Extension
14th Oct 20207:00 amRNSAppointment of Executive Director
13th Oct 202011:00 amRNSNew Corporate Presentation
13th Oct 20207:00 amRNSTR-1: notification of major holdings
9th Oct 20209:20 amRNSTR-1: Standard notification of major holdings
6th Oct 20204:40 pmRNSSecond Price Monitoring Extn
6th Oct 20204:35 pmRNSPrice Monitoring Extension
6th Oct 20209:40 amRNSInvestor Webinar
1st Oct 20209:55 amRNSUpdate on PPA with Baobab Resources Ltd
30th Sep 20207:00 amRNSTR-1: Standard form notification of major holdings
23rd Sep 20208:00 amRNSResults for the Year Ended 31 December 2019
18th Sep 20208:00 amRNSClarification to Company RNS of 17 September 2020
17th Sep 20207:00 amRNSSettlement and Termination of CLN's and Placing
7th Sep 20208:25 amRNSSloane Acquires 9 MW flexible power project
4th Sep 20209:35 amRNSTR-1: Notification of major holdings
2nd Sep 20201:35 pmRNSIssue of Conversion Shares
26th Aug 202010:10 amRNSUpdate on the Mozambique Power Project Portfolio

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.