The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.035
Bid: 0.03
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.01 (33.333%)
Open: 0.035
High: 0.035
Low: 0.035
Prev. Close: 0.035
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Benga Power Plant Project Update

22 Dec 2020 08:00

RNS Number : 4931J
Kibo Energy PLC
22 December 2020
 

Kibo Energy PLC (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN: IE00B97C0C31

("Kibo" or "the Company")

 

Dated: 22 December 2020

 

Kibo Energy PLC ('Kibo' or the 'Company')

 Benga Power Plant Project Update

 

Kibo Energy PLC ("Kibo" or the "Company"), the multi-asset, Africa focused, energy company, is delighted to provide a progress update on the Benga Power Plant Project in Mozambique ("BPPP").

 

Highlights

· Current Non- Binding Term Sheet for Coal Supply from Vale converted into a mutually binding Term Sheet to secure coal supply for BPPP; (See RNS of 5 September 2019);

· Lesedi Nuclear Services (Pty) Ltd ("LNS") completed optimized Definitive Feasibility Study ("DFS") based on current Base Case DFS successfully, enhancing project economic viability and bankability; and

· Findings of the final draft optimized DFS presented to the technical and commercial team of EDM on 17 December 2020.

 

CSTS with Vale

 

The Company has entered into a mutually binding Coal Supply Term Sheet ('CSTS') with Vale Mozambique, S.A. ('Vale') to supply coal to the Benga Power Plant Project in Mozambique ('BPPP'). The CSTS commits the parties to a supply agreement that will meet the full operational coal requirement of a 150 MW (gross generation capacity) coal fired power plant. The CSTS will be converted into a definitive Coal Supply Agreement ("CSA") as part of the process during which a final Power Purchase Agreement ("PPA") is finalized with EDM

 

Vale is a local coal miner, and subsidiary of Vale SA, one of the world's largest diversified miners, situated in very close proximity to the BPPP site. The CSTS with Vale was based on the findings of the optimized DFS which indicated that a blend of varying quality bituminous coal can be fed to the Power Plant CFB boiler. Vale has the capacity and capability to supply the different coal qualities for an optimal blend and the CSTS provides for a supply of c. 650 000 tonnes of coal per annum, structured to supply the various coal qualities required for the optimal blend.

 

Optimized DFS

 

LNS have completed and delivered a final draft of the BPPP optimized DFS study to Kibo. This optimization study focused on conducting various trade-off studies most notably:

 

· Investigating the coal characteristics in more specific detail as well as the tolerance of the coal blending ratio variances in the CFB boilers

· Consideration of various clean coal technologies - (E.g., the power plant has been designed to be 'carbon capture ready')

· Site location study with trade-off work conducted on various other possible sites

· Optimal boiler sizing

· Geotechnical considerations that may impact on building and operating the Benga power plant on the designated site

· Updating of the Financial Model

· Coal haulage road selection

 

The Company is currently reviewing the findings from the optimized DFS and a final version of the optimized DFS will be delivered to the Company in early January 2021. These findings were also presented to EDM during a preliminary DFS-briefing on 17 December 2020. The preliminary briefing concluded with several next steps agreed between the parties. These next steps are in preparation for further technical and commercial discussions that relates to the development and agreement of a PPA, following the agreed process and procedure set out in the existing MOU with EDM. Said discussions have been set for January 2021.

 

Louis Coetzee, CEO of Kibo Energy, commented: 

"We are extremely pleased with the progress on the Benga project, as the technical work is now nearing completion and seamlessly integrates with the commercial and statutory developments. The optimised DFS and binding term sheet for a Coal Sale Agreement are key cornerstones / prerequisites to take the EDM PPA negotiations progressively forward towards agreeing a final PPA."

 

"The ongoing and increasingly negative impact of COVID-19 has caused numerous delays during the past year, most notably regarding the inability to travel freely and conduct on-site work in an unfettered manner. Despite these constraints the BPPP made significant strides forward during 2020 and we have been able to sustain forward momentum and in fact gain significant new momentum towards the end of 2020. It is with this momentum that we will be entering 2021 and with firm confidence that the BPPP can still be delivered within the broad timelines discussed in previous announcements."

 

**ENDS**

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014.

 

For further information please visit www.kibo.energy or contact:

 

Louis Coetzee

info@kibo.energy

Kibo Energy PLC

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

JSE Corporate and Designated Adviser

Thomas Smith

+44 (0) 20 7392 1494

ETX Capital Limited

Joint Broker

Bhavesh Patel / Stephen Allen

+44 20 3440 6800

RFC Ambrian Limited

NOMAD on AIM

Charlotte Page / Beth Melluish

+44 (0) 20 7236 1177

St Brides Partners Ltd

Investor and Media Relations Adviser

 

Notes

Kibo Energy PLC is a multi-asset, Africa focused, energy company positioned to address the acute power deficit, which is one of the primary impediments to economic development in Sub-Saharan Africa. To this end, it is the Company's objective to become a leading independent power producer in the region.

 

Kibo is simultaneously developing three similar coal-fuelled power projects: the Mbeya Coal to Power Project ('MCPP') in Tanzania; the Mabesekwa Coal Independent Power Project ('MCIPP') in Botswana; and the Benga Independent Power Project ('BIPP') in Mozambique. By developing these projects in parallel, the Company intends to leverage considerable economies of scale and timing in respect of strategic partnerships, procurement, equipment, human capital, execution capability / capacity and project finance.

 

Additionally, the Company has a 60% interest in MAST Energy Developments Limited ('MED'), a private UK registered company targeting the development and operation of flexible power plants to service the UK Reserve Power generation market.

 

Johannesburg

22 December 2020

Corporate and Designated Adviser

River Group

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGZMZZNZRGGZG
Date   Source Headline
16th Jun 20233:51 pmRNSHolding(s) in Company
2nd Jun 20232:30 pmRNSResults of EGM
26th May 202312:15 pmRNSWarrant Exercise
23rd May 20232:30 pmRNSKibo Subsidiary MED Issue of Shares
22nd May 20233:00 pmRNSKibo Subsidiary Issue of Shares
18th May 20237:00 amRNSMED Update, JV and Reprofiling of Loan Facilities
18th May 20237:00 amRNSMbeya Power Update
12th May 202311:45 amRNSTR-1
11th May 20237:00 amRNSNotice of Extraordinary General Meeting
4th May 20238:00 amRNSUpdate regarding Kibo Warrant Exercise and TVR
4th May 20237:00 amRNSMED Q1 Corporate Presentation and Website Update
2nd May 20237:00 amRNSBio-fuel Projects Test Work & Director Retirement
28th Apr 20237:02 amRNSMast Energy Developments PLC Annual Report
26th Apr 202312:20 pmRNSTR-1: Standard form for notification
26th Apr 20237:00 amRNSWarrant Exercise and Loan Note Conversion
12th Apr 20233:48 pmRNSTR-1: Standard notification of major holdings
11th Apr 20237:00 amRNSWarrant Repricing CLN Conversion & Bridge Loan
6th Apr 20234:45 pmRNSKibo Project Update
16th Mar 20231:35 pmRNSAdjournment of EGM
10th Mar 20237:00 amRNSGroup Business Development Executive Appointment
1st Mar 20237:00 amRNSConvertible Instrument - Redemption Date Extension
27th Feb 20239:20 amRNSMED Pyebridge Update
22nd Feb 20238:00 amRNSNotice of Extraordinary General Meeting (“EGM”)
13th Feb 20239:05 amRNSSecond Price Monitoring Extn
13th Feb 20239:00 amRNSPrice Monitoring Extension
1st Feb 20237:00 amRNSOperational Update: 2023
25th Jan 202311:07 amRNSIssue of Shares in lieu of Payment
17th Jan 20239:15 amRNSOptimization Improvement to 1st SA WTE Project
11th Jan 20237:30 amRNSRestoration - Kibo Energy plc
11th Jan 20237:00 amRNSAppointment of NOMAD & Director and General Update
15th Dec 20222:10 pmRNSSettlement Shares Sale
12th Dec 20227:30 amRNSSuspension – Kibo Energy plc
9th Dec 20221:50 pmRNSNomad Update and Suspension
5th Dec 20229:20 amRNSConvertible Instrument Redemption Date Extension
23rd Nov 20227:00 amRNSKibo Renews MOU with Tanzanian Utility, TANESCO
15th Nov 202210:00 amRNSRetirement of Director
10th Nov 20221:45 pmRNSTR1 Standard form for notification major holdings
28th Oct 20221:00 pmRNSResults of Reconvened AGM
7th Oct 20227:00 amRNSNotice of Reconvened Annual General Meeting
29th Sep 20227:00 amRNSKibo Strategic IPO Spinout
23rd Sep 20229:30 amRNSInterim results for the 6 months ended 30/06/22
21st Sep 20227:45 amRNSAcquisition of Advanced UK Waste to Energy Project
16th Sep 20221:00 pmRNSAdjournment of AGM
8th Sep 20223:20 pmRNSConvertible Instrument Update
25th Aug 20227:00 amRNSUpdate on Sustainable Energy Solutions Strategy
24th Aug 20227:41 amRNSNotice of AGM
18th Aug 20222:10 pmRNSTR-1: notification of major holdings
12th Aug 20221:45 pmRNSTR-1: Notification of major holdings
29th Jul 20222:15 pmRNSPartial Settlement of Outstanding MED Loan
14th Jul 202211:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.