Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.65    0.40 (5.52%)
Bid:
7.30
Ask:
8.00
Spread: 0.70 (9.589%)
Market Cap: £31.31m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Update - Yangibana - First Ore Reserves

30 Jan 2019 07:00

RNS Number : 4672O
Cadence Minerals PLC
30 January 2019
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence" or "the Company")

 

First Ore Reserves Declared on Rare Earth Joint Venture Ground, Yangibana, Australia

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to announce that a maiden Ore Reserves has been declared on Cadence's 30% joint venture ground at the Yangibana Rare Earth Project in the Gascoyne region of Western Australia ("Yangibana Project"). The total Probable Ore Reserves on our joint venture are 2.07 million tonnes ("Mt") at 1.66% Total Rare Earths ("TREO") including 0.43% neodymium oxide ("Nd2O3") and praseodymium oxide ("Pr6O11.")

Highlights from Hastings News Release

· Probable Ore Reserves on entire Yangibana Project increase 34% to 10.35 million tonnes at 1.22%TREO including 0.43%Nd2O3+Pr6O11

· Updated Ore Reserve extends mine life by 3 years, supporting a +10-year operational life for the Project

· Updated Ore Reserve increases Yangibana Project NPV to AUD516M confirming outstanding project economics

· Includes the first Ore Reserves from joint venture ground

The Yangibana Project hosts rare earths deposits rich in neodymium and praseodymium, elements vital to permanent magnets that provide many critical components of wide ranging high-tech products, including electric vehicles, renewable energy wind turbines, robotics, medical applications and others. The Yangibana Project aims to be the next significant producer of neodymium and praseodymium outside of China.

Probable Ore Reserves

These joint venture Ore Reserves are contained within the Yangibana (M09/163) and Yangibana North (M09/159) tenemants and and form part of the larger Yangibana Project which contains Ore Reserves of 10.35 Mt at 1.22%TREO including 0.43 %Nd2O3+Pr6O11.

The Probable Ore Reserves were based on the Pre-Feasibility level study ("PFS") information and recent geological, geotechnical, metallurgical and environmental work. Independent consultants Snowden Mining Industry Consultants (Snowden) has completed an updated mining reserve estimate based on Measured and Indicated Mineral Resources at each of Bald Hill, Fraser's, Auer, Auer North, Yangibana, Yangibana West and Yangibana North deposits. This mining reserve estimate used Whittle pit optimisation software to maximise ore recovery using conventional drill and blast, load and haul mining methods.

The Probable Ore Reserves quoted in this document are derived from Measured and Indicated Resources as reported in our joint venture partners ("Hastings") ASX announcement titled "Increase in Measured and Indicated Resources at Yangibana Project" dated 22nd November 2018.

The Probable Ore Reserves contained within 30% owned joint venture tenements are as shown in Table 1.

Table 1 - Yangibana Project - Probable Ore Reserves Within Tenements Held 30% by Cadence, December 2018

Deposit

Tonnes

%TREO

%Nd2O3+Pr6O11

Nd2O3+Pr6O11 as a percent of TREO

Yangibana

110,000

0.60

0.28

47

Yangibana North

1,964,000

1.72

0.44

26

TOTAL

2,074,000

1.66

0.43

Full details of the derivation of these Ore Reserves, inclusive of Mineral Resources, Cut-Off Parameters, mining factor, metallurgical factors and assumptions, environmental and social factors can be found in the full ASX release by Hastings here:

https://hastingstechmetals.com/download/68/2019/4414/reserves-increase-by-34-to-10-35mt-covering-10-years-operation-at-yangibana-project.pdf

Production Targets

The current Ore Reserve Statement has ore reserve estimates resulting from the design of several open pits that will produce mixed rare earth carbonates ("MREC") over the current life of the project.

Capital and Operating costs are derived by independent third-party industry recognised specialists. The current Capex of $335M remains unchanged from the previous 2017 DFS. Operating costs reflect the mining and infrastructure setup costs of all pits within the mining schedule. Processing operating costs remain unchanged from the previous 2017 DFS study.

 

Additionally, over the life of the project a $17M allowance has been made in the operating cost for miscellaneous mining items for all the open pits within the mining schedule.

Current production targets on an annualised basis are to produce up to 15,000 tpa of MREC. The MREC will contain up to 8,850 tpa Total Rare Earths Oxides, of which up to 3,400 tpa will be neodymium oxide and praseodymium oxide. The mining schedule indicates the commencement of mining from the joint venture areas beginning in year 6 (2026) of with the large majority of the mined ore being derived from Yangibana North (M09/159) from year 8 onwards.

Revenue Factors

The PFS financial model assumes an average long-term US$/A$ exchange rate of 0.71 and uses Adamas Intelligence price forecasts for rare earths prices in 2021. Financial evaluation of the Probable Ore Reserves in the PFS results in the economic outcome shown in Table 2.

 

Table 2 - Yangibana Project - PFS Financial Evaluation Results

Operating Life

12 years

Net Present Value (NPV)

A$516 M

Internal Rate of Return (IRR)

32.0%

Payback Period

2.7 years

 

The economic model assumes that Cadence's wholly owned subsidiary Mojito Resources will participate in the development of the deposits held by Hastings (70%) in joint venture with Mojito Resources (30%) under the 'Yangibana Joint Venture Agreement'. The specific deposits to which the joint venture applies are Yangibana and Yangibana North.

If there is a mine development by the joint venture, not only will there need to be a Mining Joint Venture Agreement agreed and put in place to replace the existing joint venture documentation and regulate the arrangements between the participants for the mine development, but arrangements will also need to be established to determine how the Yangibana production and tenements the subject of the joint venture fit with the broader 100% Hastings group owned production and tenements.

No costs or revenue ascribed to the 30% interest in the deposits held by Mojito Resources are reported in the financial modelling. If Mojito Resources did not participate in any development of the joint venture deposits and the development of those deposits was to proceed on a 100% basis by Hastings, then the economic model would need to be updated to allocate those costs and revenues to Hastings.

The estimates in this study relating to mining, processing and cost performance are underpinned by an updated PFS which has a confidence range of ±25%.

Details of Ownership

On 1 December 2011, Cadence announced that it had acquired a 30% free carried interest to Bankable Feasibility Study of the Yangibana North Rare Earth Deposit. The exploration costs until the commencement of the BFS are therefore borne solely by Hastings (70% owners and operator). The same terms agreed and announced on 1 December 2012 also apply to Gossan, Hook, Kanes Gossan, Lions Ear and Bald Hill North.

Cadence Minerals CEO Kiran Morzaria commented: 

"It is great to see the inclusion of Cadence's joint venture ground within the mine plan of the Yangibana Project, and we look forward to working with Hastings minerals to progress the Mining Joint Venture and crystalise value to Cadence's shareholders."

"The Yangibana Project has high grades in neodymium and praseodymium, which are critical in the manufacture of permanent magnets used in the motors of electric vehicles. In 2017, 75% of the rare earth market by value was represented by neodymium and praseodymium, and we see Yangibana as an important part of that supply chain.

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Hannam & Partners LLP (Joint Broker)

+44 (0) 207 907 8500

Neil Passmore

Giles Fitzpatrick

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCBLMMTMBMTTBL
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.