We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.55
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.30 (8.824%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 3.55
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Macarthur Lake Giles Project Feasibility Update

16 Apr 2021 09:51

RNS Number : 7271V
Cadence Minerals PLC
16 April 2021
 

Cadence Minerals Plc

("Cadence Minerals", "Cadence")

 

Feasibility Study Update: Macarthur Minerals (TSX-V: MMS) (ASX: MIO) moves ahead with mine design for Lake Giles Iron Project.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the "Company" or "Macarthur") has updated on the progress made on the mining and haulage components of the Feasibility Study for the Lake Giles Iron Project. Macarthur has been working with Orelogy Mining Consultants ("Orelogy") and Pells Sullivan Meynink ("PSM") on the mine design and road haulage aspects of the Project.

 

Highlights:

· Macarthur engagement of Orelogy and PSM on mine design, geotechnical design and road haulage pricing.

· Request for Budget Pricing ("RFBP") submitted to contract mining and road haulage operators to establish contractor pricing for operations.

· Geotechnical drilling program defined for the Moonshine and Moonshine North pits to establish geotechnical parameters for final pit designs.

 

Macarthur has been working with mining consultants Orelogy and geotechnical engineers from PSM on the mine design for the Lake Giles Iron Project. Orelogy has completed preliminary pit optimisations, designs, scheduling and project layouts to support an operation targeting production of 3 Mtpa (dry) magnetite concentrate. Additionally, PSM has been supporting the mine design through a geotechnical review of drill core and project geology.

 

A request for budget pricing (RFBP) has been submitted to several local mining contractors for contract mining and road haulage services including:

· Site establishment

· Site preparation

· Drill and Blast

· Excavate, load and haul

· Road haulage to the railhead

· Road maintenance

· Loading of rail wagons

 

PSM has designed a diamond drill program to obtain detailed geotechnical parameters for final pit designs. Macarthur is currently engaging with drilling contractors to undertake this drill program as soon as possible.

 

The full announcement can be viewed here: https://macarthurminerals.com/wp-content/uploads/2021/04/MMS-NR-FS-update-Mine-Design_15-April-2021.pdf

 

Macarthur Minerals CEO Andrew Bruton commented: "Macarthur is pleased to be working with Orelogy and PSM on this important component of the Feasibility Study for the magnetite mining operations at Lake Giles. An extensive body of work is being undertaken on the mine design and geotechnical design and securing contractor pricing for mining and road haulage costs is important to ensure that mining operations can be optimised. This budget pricing information will help inform the next phase of work that Orelogy and PSM will be undertaking.

 

The Macarthur feasibility study team continues to make significant progress and is critically examining options for mine design that will maximise the value of the project for the benefit of shareholders. You can see from the preliminary design diagram that the mine pits and scale of the operation is huge. The area of the pits stretch over 6 kilometres and we are only currently focused on the first 20 plus years of mine and plant life. The scale of a billion-tonne magnetite resource in such close proximity to existing rail and port infrastructure is very unique globally. I am ensuring that the project steps are incremental so that Macarthur has the capacity and internal resources to bring the first stage into production.

 

We look forward to updating the market as the Feasibility Study continues to progress."

 

Cadence Minerals Holding in Macarthur

 

Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.

 

This news release is not for distribution to United States Services or for Dissemination in the United States. 

- Ends -

 

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

 

Kiran Morzaria

 

 

 

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

 

James Sinclair-Ford

 

 

 

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

  

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding Cadence Minerals Plc's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKZGMDRVGGMZG
Date   Source Headline
18th Apr 20247:00 amRNSFurther Progress at the Amapa Iron Ore Project
11th Apr 202410:01 amRNSEuropean Metals Holdings - Cinovec Lithium Project
9th Apr 20248:59 amRNSCorporate Update - Evergreen Lithium
5th Apr 20241:23 pmRNSPlacing to raise £500,000 & Issue of Warrants
28th Mar 20249:59 amRNSUpdate on Amapá Project investment & Equity Stake
27th Mar 202410:25 amRNSEuropean Metals Holdings - Cinovec Project Update
22nd Mar 20247:00 amRNSOptimisation Study Delivers Savings at Amapá
14th Mar 20249:18 amRNSCorporate Update - Evergreen Lithium
7th Mar 20247:00 amRNSProgress at the Amapá Project & Corporate Update
29th Jan 202410:05 amRNSCorporate Update
29th Jan 20249:53 amRNSEMH - Cinovec Exploration Licenses
22nd Jan 20248:56 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
22nd Dec 20238:15 amRNSCorporate Update – European Metals Holdings
30th Nov 20239:06 amRNSCorporate Update - Evergreen Lithium
22nd Nov 202311:39 amRNSCorporate Update - Hastings Technology Metals
16th Nov 20237:00 amRNSSonora Lithium Investment Update
9th Nov 20239:12 amRNSCorporate Update - European Metals Holdings
31st Oct 20237:00 amRNSDirector Share Purchases
30th Oct 20237:00 amRNSStrategic Development and Financing
29th Sep 20239:53 amRNSInterim Results
18th Sep 20238:43 amRNSCorporate Update - Evergreen Lithium
12th Sep 20239:10 amRNSCorporate Update - Hastings Technology Metals
11th Sep 20239:44 amRNSAmapá Iron Ore Project Update
31st Aug 20237:52 amRNSSonora Lithium Investment Update
16th Aug 202311:52 amRNSResult of AGM
4th Aug 20238:55 amRNSCorporate Update - Hastings Technology Metals
25th Jul 202312:25 pmRNSNotice of AGM
21st Jul 202310:12 amRNSCorporate Update – European Metals Holdings
28th Jun 20239:11 amRNSCorporate Update - Evergreen Lithium ANT Analysis
27th Jun 20237:00 amRNSAnnual Results for the year ended 31 December 2022
13th Jun 20239:49 amRNSCorporate Update - Hastings Technology Metals
9th Jun 202311:46 amRNSUpdate EMH Land secured for Cinovec lithium plant
1st Jun 20239:01 amRNSCorporate Update - Evergreen Lithium
31st May 202312:52 pmRNSCorporate Update - Hastings Technology Metals
26th May 20232:48 pmRNSAmapa Project Update & Loan Financing
25th May 20231:43 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
25th May 20238:42 amRNSEMH Announcement: Outstanding Lithium Recoveries
10th May 202312:12 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
3rd May 20235:17 pmRNSCorporate Update - Hastings Technology Metals
13th Apr 20238:56 amRNSNotice of Substantial Shareholder in Evergreen
1st Mar 20237:00 amRNSCorporate Update
30th Jan 202311:47 amRNSEuropean Metals Announcement: Just Transition Fund
26th Jan 20238:26 amRNSListing of Evergreen Lithium on the ASX
25th Jan 20238:35 amRNSCompletion of Sale of Yangibana JV Interest
10th Jan 20232:05 pmRNSSecond Price Monitoring Extn
10th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSDirector Share Purchases
3rd Jan 20237:00 amRNSCompletion of PFS on Amapá Iron Ore Project
30th Dec 20227:00 amRNSCorporate Update
31st Oct 20229:00 amRNSInvestment Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.