Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.60
Bid: 3.50
Ask: 3.70
Change: 0.05 (1.41%)
Spread: 0.20 (5.714%)
Open: 3.55
High: 3.60
Low: 3.55
Prev. Close: 3.55
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Macarthur Lake Giles Project Feasibility Update

16 Apr 2021 09:51

RNS Number : 7271V
Cadence Minerals PLC
16 April 2021
 

Cadence Minerals Plc

("Cadence Minerals", "Cadence")

 

Feasibility Study Update: Macarthur Minerals (TSX-V: MMS) (ASX: MIO) moves ahead with mine design for Lake Giles Iron Project.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the "Company" or "Macarthur") has updated on the progress made on the mining and haulage components of the Feasibility Study for the Lake Giles Iron Project. Macarthur has been working with Orelogy Mining Consultants ("Orelogy") and Pells Sullivan Meynink ("PSM") on the mine design and road haulage aspects of the Project.

 

Highlights:

· Macarthur engagement of Orelogy and PSM on mine design, geotechnical design and road haulage pricing.

· Request for Budget Pricing ("RFBP") submitted to contract mining and road haulage operators to establish contractor pricing for operations.

· Geotechnical drilling program defined for the Moonshine and Moonshine North pits to establish geotechnical parameters for final pit designs.

 

Macarthur has been working with mining consultants Orelogy and geotechnical engineers from PSM on the mine design for the Lake Giles Iron Project. Orelogy has completed preliminary pit optimisations, designs, scheduling and project layouts to support an operation targeting production of 3 Mtpa (dry) magnetite concentrate. Additionally, PSM has been supporting the mine design through a geotechnical review of drill core and project geology.

 

A request for budget pricing (RFBP) has been submitted to several local mining contractors for contract mining and road haulage services including:

· Site establishment

· Site preparation

· Drill and Blast

· Excavate, load and haul

· Road haulage to the railhead

· Road maintenance

· Loading of rail wagons

 

PSM has designed a diamond drill program to obtain detailed geotechnical parameters for final pit designs. Macarthur is currently engaging with drilling contractors to undertake this drill program as soon as possible.

 

The full announcement can be viewed here: https://macarthurminerals.com/wp-content/uploads/2021/04/MMS-NR-FS-update-Mine-Design_15-April-2021.pdf

 

Macarthur Minerals CEO Andrew Bruton commented: "Macarthur is pleased to be working with Orelogy and PSM on this important component of the Feasibility Study for the magnetite mining operations at Lake Giles. An extensive body of work is being undertaken on the mine design and geotechnical design and securing contractor pricing for mining and road haulage costs is important to ensure that mining operations can be optimised. This budget pricing information will help inform the next phase of work that Orelogy and PSM will be undertaking.

 

The Macarthur feasibility study team continues to make significant progress and is critically examining options for mine design that will maximise the value of the project for the benefit of shareholders. You can see from the preliminary design diagram that the mine pits and scale of the operation is huge. The area of the pits stretch over 6 kilometres and we are only currently focused on the first 20 plus years of mine and plant life. The scale of a billion-tonne magnetite resource in such close proximity to existing rail and port infrastructure is very unique globally. I am ensuring that the project steps are incremental so that Macarthur has the capacity and internal resources to bring the first stage into production.

 

We look forward to updating the market as the Feasibility Study continues to progress."

 

Cadence Minerals Holding in Macarthur

 

Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.

 

This news release is not for distribution to United States Services or for Dissemination in the United States. 

- Ends -

 

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

 

Kiran Morzaria

 

 

 

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

 

James Sinclair-Ford

 

 

 

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

  

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding Cadence Minerals Plc's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKZGMDRVGGMZG
Date   Source Headline
4th Apr 201810:57 amRNSUpdate - Macarthur Minerals
28th Mar 201812:04 pmRNSUpdate - European Metals Holdings
22nd Mar 20187:00 amRNSExploration of Argentinan Lithium Assets Commences
21st Mar 20188:59 amRNSUpdate - Leogang Cobalt-Nickel Sulphide Project
8th Mar 20189:16 amRNSUpdate - Macarthur Minerals
6th Mar 20184:58 pmRNSDirector Share Purchases
6th Mar 201811:28 amRNSUpdate - Auroch Minerals
5th Mar 20182:25 pmRNSUpdate - Macarthur Minerals
5th Mar 201810:13 amRNSDirector Share Purchases
2nd Mar 201812:54 pmRNSEMH Update & Change of Broker
20th Feb 20182:00 pmRNSUpdate - Macarthur Minerals
19th Feb 201812:39 pmRNSUpdate - Bacanora Minerals
9th Feb 201811:22 amRNSUpdate - Bacanora Minerals
5th Feb 201810:09 amRNSAppointment of Joint Broker & PDMR Dealings
31st Jan 20183:00 pmRNSUpdate - Macarthur Minerals
25th Jan 20189:45 amRNSUpdate - Bacanora Minerals
19th Dec 20178:47 amRNSUpdate - European Metals Holdings
15th Dec 201711:23 amRNSUpdate - Bacanora Minerals
13th Dec 201711:17 amRNSDirector Share Purchase
13th Dec 201710:29 amRNSUpdate - Bacanora Minerals Ltd
12th Dec 20177:19 amRNSDirector Share Purchase and Purchase Programme
11th Dec 20177:00 amRNSArgentine Hard Rock Acquisition
8th Dec 20171:46 pmRNSUpdate - Macarthur Minerals
6th Dec 20174:17 pmRNSUpdate - Macarthur Minerals
4th Dec 201710:17 amRNSUpdate - Auroch Minerals
30th Nov 20177:00 amRNSCorporate & Investment Update
28th Nov 20179:08 amRNSUpdate - European Metals Holdings
23rd Nov 20171:48 pmRNSUpdate - Macarthur Minerals
22nd Nov 20172:09 pmRNSUpdate - Macarthur Minerals
22nd Nov 20171:37 pmRNSYangibana Rare Earth Project - Resource Update
17th Nov 20174:23 pmRNSUpdate - Macarthur Minerals
8th Nov 201710:26 amRNSBacanora Minerals Update
8th Nov 20179:26 amRNSAuroch Minerals - Update
6th Nov 20171:27 pmRNSUpdate - Macarthur Minerals
2nd Nov 201710:00 amRNSUpdate - Bacanora Minerals
2nd Nov 20178:54 amRNSUpdate - European Metals Holdings
1st Nov 20177:00 amRNSStrategic Development and Update re Loan Notes
26th Oct 20179:30 amRNSAuroch Minerals Update
20th Oct 20171:32 pmRNSMacarthur Minerals Update
19th Oct 20171:10 pmRNSMacarthur Minerals Update
13th Oct 20172:27 pmRNSUpdate - Macarthur Minerals
12th Oct 20171:59 pmRNSUpdate - Macarthur Minerals
4th Oct 20173:57 pmRNSUpdate - Macarthur Minerals
4th Oct 20171:19 pmRNSUpdate - Auroch Minerals
3rd Oct 201711:33 amRNSUpdate - European Metals Holdings
29th Sep 20177:00 amRNSInterim Results
28th Sep 20172:18 pmRNSUpdate - Macarthur Minerals
18th Sep 201712:35 pmRNSUpdate - Auroch Minerals
13th Sep 20179:27 amRNSYangibana - Update
12th Sep 20172:59 pmRNSMacarthur Minerals - Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.