The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.60
Bid: 3.50
Ask: 3.70
Change: 0.05 (1.41%)
Spread: 0.20 (5.714%)
Open: 3.55
High: 3.60
Low: 3.55
Prev. Close: 3.55
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Macarthur Lake Giles Project Feasibility Update

16 Apr 2021 09:51

RNS Number : 7271V
Cadence Minerals PLC
16 April 2021
 

Cadence Minerals Plc

("Cadence Minerals", "Cadence")

 

Feasibility Study Update: Macarthur Minerals (TSX-V: MMS) (ASX: MIO) moves ahead with mine design for Lake Giles Iron Project.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the "Company" or "Macarthur") has updated on the progress made on the mining and haulage components of the Feasibility Study for the Lake Giles Iron Project. Macarthur has been working with Orelogy Mining Consultants ("Orelogy") and Pells Sullivan Meynink ("PSM") on the mine design and road haulage aspects of the Project.

 

Highlights:

· Macarthur engagement of Orelogy and PSM on mine design, geotechnical design and road haulage pricing.

· Request for Budget Pricing ("RFBP") submitted to contract mining and road haulage operators to establish contractor pricing for operations.

· Geotechnical drilling program defined for the Moonshine and Moonshine North pits to establish geotechnical parameters for final pit designs.

 

Macarthur has been working with mining consultants Orelogy and geotechnical engineers from PSM on the mine design for the Lake Giles Iron Project. Orelogy has completed preliminary pit optimisations, designs, scheduling and project layouts to support an operation targeting production of 3 Mtpa (dry) magnetite concentrate. Additionally, PSM has been supporting the mine design through a geotechnical review of drill core and project geology.

 

A request for budget pricing (RFBP) has been submitted to several local mining contractors for contract mining and road haulage services including:

· Site establishment

· Site preparation

· Drill and Blast

· Excavate, load and haul

· Road haulage to the railhead

· Road maintenance

· Loading of rail wagons

 

PSM has designed a diamond drill program to obtain detailed geotechnical parameters for final pit designs. Macarthur is currently engaging with drilling contractors to undertake this drill program as soon as possible.

 

The full announcement can be viewed here: https://macarthurminerals.com/wp-content/uploads/2021/04/MMS-NR-FS-update-Mine-Design_15-April-2021.pdf

 

Macarthur Minerals CEO Andrew Bruton commented: "Macarthur is pleased to be working with Orelogy and PSM on this important component of the Feasibility Study for the magnetite mining operations at Lake Giles. An extensive body of work is being undertaken on the mine design and geotechnical design and securing contractor pricing for mining and road haulage costs is important to ensure that mining operations can be optimised. This budget pricing information will help inform the next phase of work that Orelogy and PSM will be undertaking.

 

The Macarthur feasibility study team continues to make significant progress and is critically examining options for mine design that will maximise the value of the project for the benefit of shareholders. You can see from the preliminary design diagram that the mine pits and scale of the operation is huge. The area of the pits stretch over 6 kilometres and we are only currently focused on the first 20 plus years of mine and plant life. The scale of a billion-tonne magnetite resource in such close proximity to existing rail and port infrastructure is very unique globally. I am ensuring that the project steps are incremental so that Macarthur has the capacity and internal resources to bring the first stage into production.

 

We look forward to updating the market as the Feasibility Study continues to progress."

 

Cadence Minerals Holding in Macarthur

 

Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.

 

This news release is not for distribution to United States Services or for Dissemination in the United States. 

- Ends -

 

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

 

Kiran Morzaria

 

 

 

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

 

James Sinclair-Ford

 

 

 

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

  

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding Cadence Minerals Plc's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKZGMDRVGGMZG
Date   Source Headline
7th Oct 20227:00 amRNSMineral Resource Increase & Upgrade Amapá Project
28th Sep 20227:00 amRNSInterim Results for six months ended 30 June 2022
10th Aug 20223:50 pmRNSResult of AGM
12th Jul 20227:00 amRNSDirector Share Purchases
7th Jul 20222:58 pmRNSNotice of AGM
27th Jun 20227:00 amRNSCompletion of LT & LS sale & Amapa Project Update
23rd Jun 20227:00 amRNSSale of Yangibana JV Interest to Hastings
21st Jun 20227:00 amRNSAnnual Results for the year ended 31 December 2021
25th Apr 20228:53 amRNS4th Amapa Iron Ore Shipment Completed & En Route
19th Apr 20227:00 amRNSExercise of Warrants
11th Apr 202211:14 amRNSDirector Share Purchases
7th Apr 20229:50 amRNSCommencement of Shipment of Iron Ore from Amapa
30th Mar 20227:00 amRNSConditional Sale Agreement of its Stake in LT & LS
21st Mar 20227:00 amRNSPFS Update for the Amapa Project
15th Mar 20229:28 amRNSCadence completes to vest its 27% in Amapa Project
21st Feb 20223:42 pmRNSResult of Open Offer
21st Feb 20227:00 amRNSYangibana Project NPV Increases 84% to A$1bn
7th Feb 20227:00 amRNSAmapa - Formal Completion & Vesting of 20%
4th Feb 20221:45 pmRNSOpen Offer and Posting of Circular
3rd Feb 20229:05 amRNSSecond Price Monitoring Extn
3rd Feb 20229:00 amRNSPrice Monitoring Extension
3rd Feb 20227:00 amRNSResult of Placing & Subscription and TVR
2nd Feb 20224:40 pmRNSProposed Placing
2nd Feb 20221:54 pmRNSNAIF A$140m Loan - Yangibana Rare Earths Project
19th Jan 20222:05 pmRNSEMH Cinovec PFS Update - Outstanding Results
14th Jan 20227:00 amRNSProject & Corporate Updates. Presentation Q&A
5th Jan 20227:00 amRNSQuestions for Investor Q&A Session
29th Dec 202111:06 amRNSSecond Price Monitoring Extn
29th Dec 202111:00 amRNSPrice Monitoring Extension
29th Dec 20219:06 amRNSSecond Price Monitoring Extn
29th Dec 20219:00 amRNSPrice Monitoring Extension
29th Dec 20217:00 amRNSAmapa Iron Ore Project Update
25th Nov 202111:45 amRNSCastillo Extends Option Over Lithium Projects
22nd Nov 20218:57 amRNSCastillo Copper Picasso Lithium Project Update
1st Nov 20219:01 amRNSPort Concession Update, Amapa Project
27th Oct 20219:50 amRNSCastillo - Picasso Lithium Project Site Visit
20th Oct 202111:43 amRNSLitchfield Lithium surface sampling by Castillo
13th Oct 202110:27 amRNSEuropean Metals Cinovec Resource Upgrade
11th Oct 202111:05 amRNSSecond Price Monitoring Extn
11th Oct 202111:00 amRNSPrice Monitoring Extension
11th Oct 20219:05 amRNSSecond Price Monitoring Extn
11th Oct 20219:00 amRNSPrice Monitoring Extension
11th Oct 20217:00 amRNSBank Credit Committee Approval for Amapa Project
7th Oct 202112:19 pmRNSCastillo Litchfield Lithium Due Diligence Update
29th Sep 20217:01 amRNSOption Granted to Castillo to Acquire Projects
26th Aug 202112:00 pmRNSInterim Results
25th Aug 20213:58 pmRNSMacarthur Lake Giles Feasibility Study Progress
23rd Aug 20217:00 amRNSMacarthur Lakes Giles Feasibility Study Progress
18th Aug 20213:06 pmRNSYangibana Rare Earth Joint Venture Update
12th Aug 20212:39 pmRNSMacarthur Lake Giles Geotech Drill Programme

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.