The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.70
Bid: 3.50
Ask: 3.90
Change: 0.10 (2.78%)
Spread: 0.40 (11.429%)
Open: 3.60
High: 3.75
Low: 3.60
Prev. Close: 3.60
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Interim Results

26 Aug 2021 12:00

RNS Number : 9027J
Cadence Minerals PLC
26 August 2021
 

26 August 2021

Cadence Minerals plc

('Cadence Minerals', 'Cadence' or 'the Company')

Interim Results for the six months ended 30 June 2021

 

Cadence Minerals plc (AIM/NEX: KDNC) is pleased to announce its interim results for the six months ended 30 June 2021.

 

Highlights

 

The focus of the Company since the beginning of the year has been its investment into the Amapa Iron Ore Project ('Amapa Project'). This investment continues to be our top priority which has involved finalising the settlement agreement with the secured bank creditors and the advancement of the pre-feasibility study on the asset. The delays in crystallising our investment are a result of the secured bank creditors' internal bureaucratic process, which is required when settling a loan of this value and under the terms agreed. Nonetheless we have continued to move the Amapa Project forward which has included, amongst other things, the iron ore stockpile shipments commencing in March and the pre-feasibility studies starting soon after that.

 

We are also in the process of reviewing our privately held assets, in particular, our early-stage lithium prospects in north Australia. We believe that these could be of some strategic importance given their proximity to the Finniss Project, owned by ASX listed Core Lithium.

 

During the period our equity investments have performed very well, primarily driven by the performance of European Metals Holdings. Our equity investments generated a total income of £3.54 million resulting in profit before taxation of £2.84 million for the six months ended June 2021.

 

At a macro-economic level, the first half of 2021 saw the continued global recovery from the physical demand shock from COVID-19 experienced in 2020. According to the World Bank Group, the global economy is set to expand some 5.6% in 2021, its most robust post-recession pace in 80 years. However, this recovery is expected to be uneven and primarily reflects sharp rebounds in some major economies - most notably the United States - driven by substantial fiscal support. These ongoing monetary easing programmes have continued to support commodity prices and, in particular iron ore in the first half of this year. In addition, the accelerated transition and electrification of vehicles has increased lithium compound pricing, with the Benchmark Lithium Price Index up 85.3% on a year-to-date basis.

 

After the period end, we saw a softening of iron ore and other commodities (although lithium compound pricing remains strong). We believe this is primarily driven by China's protectionist policies, including the possible imposition of steel quotas, crackdowns on speculative trading and the potential spread of the COVID-19 Delta variant. We expect the demand-supply balance to remain relatively tight for iron ore and lithium compounds in the medium term although there is still some residual uncertainty about how vaccine deployment and the policy and behavioural response to the newer, more infectious strains of COVID-19 will interact over the coming quarters.

 

As outlined in our annual report and accounts, Cadence operates an investment strategy that includes both investments in private projects via a private equity model and investments in public equity. In both investment classes, we take either an active or passive role. We have reported on each class below.

 

 

 

Private Investments (Active)

 

The Amapa Iron Ore Project, Brazil

The Amapa Project is a large-scale open-pit iron ore mine with associated rail, port and beneficiation facilities that commenced operations in December 2007. In 2019, Cadence entered into a binding investment agreement to invest in and acquire up to 27% of the Amapa iron ore mine, beneficiation plant, railway and private port owned by DEV Mineração S.A ('DEV') ('The Agreement'). The Agreement also gave Cadence a first right of refusal to increase its stake to 49%.

 

To acquire its 27% interest, Cadence will invest US$6 million over two stages in a joint venture ('JV') company. The first stage is for 20% of the JV, the consideration for which is US$2.5 million. The second stage of investment is for a further 7% of the JV for a consideration of US$3.5 million. The investments are wholly contingent on DEV delivering several key preconditions. The funds for the first stage of investment are currently held in a judicial trust account of the commercial court of Sao Paulo.

 

All of our shareholders are aware that the remaining major precondition for Cadence to make its first stage investment in the Amapa Project requires DEV and the investors (Cadence and Indo Sino via our JV company) to reach a settlement agreement with the secured bank creditors. As of the date of the publication of these interims, the investors, DEV, and the secured bank creditors have agreed on the principal terms of the settlement agreement, which include the quantum, timing and all other material terms. The final settlement agreement is in near-final form, and the secured bank creditors have either had credit committee approval or are awaiting it.

 

We understand that this process has been frustrating, given that we agreed on the principal terms of the settlement in September 2020, but this matter has been outside of our control. The alternative to the current agreed (in principle) settlement would be hugely detrimental to the secured bank creditors, nonetheless. We have a high degree of confidence that we will execute a settlement agreement and will be announced as soon as it is completed.

 

As of the end of August 2021, DEV had shipped three cargoes totalling approximately 143,000 wet tonnes of 58% iron ore. DEV is also contracted to carry out logistical and shipping activities for third parties who have stockpiles held at DEV's port, which it has been doing since it completed its third shipment in May of this year. These third-party stockpiles are separate from the 1.25 million tonnes of 58% iron ore (+/- 10%) owned by DEV. At this point, DEV intends to continue to carry out these shipping activities for these third parties. This is because current shipping rates have increased dramatically (US$80-90 per tonne), which is reducing the profitability of shipping DEV's material. We believe that these rates should normalise over the medium term; therefore, the shipping of DEV's material will recommence at a later stage.

 

The first portion of the net revenues has been used to pay historic small and employee creditors. Approximately US$6 million of the net revenues will be used to begin recommissioning studies on the Amapa Project and to start maintenance and monitoring of the current tailing dam facilities. The remaining net revenues will provide working capital for the operations and will be used as payment against the outstanding amount due to the secured bank creditors.

 

After the period end, DEV was permitted to export a further US$10 million (after the deductions of all logistical, regulatory, shipping and sales costs) of iron ore from its stockpiles situated at its port in Santana, Amapa, Brazil. This authority is in addition to the first permission granted to DEV on 10 February 2021, in which it was permitted to ship an initial US$10 million (net of costs) of iron ore.

 

Work on the started earlier in the year on the Pre-feasibility Study ('PFS'). DEV has appointed internationally accredited engineering and consulting firms to carry out the engineering and conditioning study on the beneficiation and processing plant. These firms will also review the power supply options for the mine and plant, particularly the possibility of connecting to the grid network, enabling the mine and the plant to be predominantly powered by low-cost renewable energy. In addition, PFS work has started on the railway with the inspection of some 193km of rail and associated infrastructure. Both of these studies, once complete, will form part of the PFS. In the coming months, we expect DEV to appoint a consulting and engineering firm to start work on the port studies and conduct a geotechnical investigation of the mine.

 

As previously announced in May of this year, DEV began tailing dam maintenance. DEV has now employed a civil engineer and two geotechnical consulting firms to advance the work programme, including monitoring, geotechnical stability testing and statutory reporting. The end goal is to ensure that the current dams will be suitable for future operations amid Brazil's more stringent regulatory environment.

 

In addition to the PFS work, DEV has worked with Companhia Docas de Santana ('CDSA') to increase loading capacity at the public port. Together with CDSA, DEV has established and tested a process at CDSA's port in Santana for loading a 45,000-tonne vessel with iron ore at Pier Two from the berth side. This operation was the first of its kind and will allow shipment of the DEV stockpile at a faster rate if required.

 

Lithium Technologies Pty Ltd and Lithium Suppliers Pty Ltd ('LT' and 'LS')

Cadence owns 25.85% of LT and LS, which owns or has applied for three prospective hard rock lithium assets in Australia and six exploration applications in Argentina.

 

With the increase in lithium compound pricing, we have seen renewed interest in hard rock lithium projects in Australia. Our assets are prospective for pegmatites and especially our Litchfield exploration licence, which is adjacent to Core Lithium's Finniss Project. A feasibility study was completed on the Finniss Project, which shows a pre-tax net present value of AU$384 million.

 

Given the progress being made at the Finniss Project, we will be reviewing the targeting and fieldwork studies carried out in 2019 to determine if it is worth pursuing further exploration in our joint venture areas.

 

Private Investments (Passive)

Our two passive private investments consist of our 30% equity stake in five lithium concessions that form part of the Sonora Lithium Project and our 30% interest in three mining leases, six exploration licences and two general-purpose licences that form part of the Yangibana Rare Earth Project. Our joint venture partners for these assets are Bacanora Lithium and Hastings Technology Metals, respectively. Further details on the Sonora Lithium and Yangibana Rare Earth Projects can be found here and here, respectively.

 

Although Hastings Technology Minerals has progressed the development of the Yangibana Rare Earth project, most of this has been in relation to its wholly owned assets, with the only a change being reassessment of our joint venture mineral resources and reserves occurring in July 2021. There was no material difference in the recalculation of our portion of the resource and reserves; an updated summary can be found on our website here.

 

In May 2021, Bacanora Lithium and Ganfeng International Trading (Shanghai) Limited ('Ganfeng') entered into an agreement regarding the terms of a possible cash offer by Ganfeng for the entire issued share capital of Bacanora Lithium, other than that which it already owns, for 67.5 pence per Bacanora Lithium share (the 'Possible Offer'). The preconditions to the Possible Offer are progressing, with the latest update provided here on 29 July 2021. The Possible Offer remains subject to certain other preconditions, including the Due Diligence Precondition. The satisfaction or waiver of the Due Diligence Precondition is at the sole discretion of Ganfeng' s board.

 

As far as the Company is aware, the Possible Offer has no direct effect on our joint ventures. Should the cash offer be successful, it will be highly encouraging for the development of the project, given Ganfeng's involvement in the development of the asset to date, their extensive experience in the lithium market and the fact that their holding company is the world's third-largest (and China's largest) lithium compounds producer.

 

Public Equity

The public equity investment segment includes both active and passive investments as part of our trading portfolio. The trading portfolio consists of investments in listed mining entities that the board believes possess attractive underlying assets. The focus is to invest in mining companies that are significantly undervalued by the market and where there is substantial upside potential through exploration success and/or the development of mining projects for commercial production. Ultimately, the aim is to make capital gains in the short to medium term. Investments are considered individually based on various criteria and are typically traded on the TSX, ASX, AIM or LSE.

 

During the period, our public equity investments generated an unrealised gain of £3.12 million and a realised gain of £0.42 million. The majority of these profits were derived from the sale of European Metals Holdings shares.

 

As of 30 June 2021, our public equity stakes consisted of the following:

 

Company

Listing

Value £'000

Type of Investment

European Metals Holdings Limited

(ASX & AIM: EMH) (NASDAQ: EMHXY)

14,180

Active

MacArthur Minerals Limited

(ASX: MIO) (TSX-V: MMS)

327

Passive

Celsius Resources

(ASX: CLA)

103

Passive

Eagle Mountain Mining Limited

(ASX: EM2)

153

Passive

Charger Metals NL

(ASX: CHR)

109

Passive

Miscellaneous

Various

6

Passive

Total

14,878

 

European Metals Holdings Limited ('European Metals')

Cadence has held an investment in European Metals since June 2015. As of the period end, Cadence held approximately 9.7% of the Cinovec deposit in the Czech Republic through a direct holding in the share capital of European Metals that owns 100% of the exploration rights to the Cinovec lithium/tin deposit.

 

Cinovec hosts a globally significant hard rock lithium deposit with a total Indicated Mineral Resource of 372.4Mt at 0.45% Li2O and 0.04% Sn, and an Inferred Mineral Resource of 323.5Mt at 0.39% Li2O and 0.04% Sn, containing a combined 7.18 million tonnes of lithium carbonate equivalent and 263kt of tin (as reported on 28 November 2017). An initial Probable Ore Reserve of 34.5Mt at 0.65% Li2O and 0.09% Sn (as reported on 4 July 2017) had been declared to cover the first 20 years of mining. A projected output of 22,500tpa of lithium carbonate was reported on 11 July 2018.

 

The project has been significantly de-risked and is moving towards a final investment decision. European Metals has continued to progress the development of the assets across all the critical areas of the project. This includes further resource drilling to upgrade areas into measured resources and the completion of the locked cycle testing, which further supports the project's credentials to produce battery-grade lithium carbonate and convert it to lithium hydroxide.

 

Trading Portfolio Public Equity (Passive)

Cadence's passive investments are typically direct purchases of listed mining equities but may include other investment structures. The aim is to make capital gains in the short to medium term. Investments are considered individually based on a variety of criteria. Investments are typically traded on the TSX, ASX, AIM or LSE. During the period, we invested in a broader range of publicly listed investments and retained our stake in MacArthur Minerals Limited. Our trading portfolio generated a realised gain of £0.02 million over the period. A summary of our holdings is detailed in the table above.

 

Given that none of our trading portfolio investments represent more than 10% of our net assets and are below the relevant reporting thresholds in the applicable jurisdiction, we have determined that going forward, we will not republish regulatory announcements associated with these investments unless, of course, they become material. We will report on the performance of the trading portfolio investments via our annual and interim financial statements.

 

Financial Results

 

During the period, the Company made a profit before taxation of £2.84 million (six months ended 30 June 2020: loss of £1.40 million, the year ended 31 December 2020: profit of £7.82 million). There was a weighted basic profit per share of 1.914p (six months ended 30 June 2020: loss of 1.521p, the year ended 31 December 2020: profit of 6.705p).

 

The total assets of the Company increased from £22.61 million as of 31 December 2020 to £25.37 million. Borrowings were reduced from £0.22 million at 31 December 2020 to zero at 30 June 2021.

 

During the period, our net cash outflow from operating activities was £1.15 million, and our net cash position increased by £0.78 million to £1.39 million.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Joint Broker)

+44 (0) 207 220 1666

James Joyce

Darshan Patel

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

CADENCE MINERALS PLC

STATEMENT OF COMPREHENSIVE INCOME

FOR THE PERIOD ENDED 30 JUNE 2021

 

Notes

Unaudited Period ended 30 June 2021

Unaudited Period ended 30 June 2020 (restated)

Audited Year ended 31 December 2020

£'000

£'000

£'000

Income

-

Unrealised profit/(loss) on financial investments

3,116

(383)

10,252

Realised profit/(loss) on financial investments

423

(34)

65

Other income

-

-

54

3,539

(417)

10,371

Share based payments

(197)

-

(57)

Other administrative expenses

(505)

(599)

(1,379)

Total administrative expenses

(702)

(599)

(1,436)

Operating profit/(loss)

2,837

(1,016)

8,935

Foreign exchange gains/(losses)

(21)

(181)

(820)

Finance income

29

6

Finance cost

(4)

(199)

(298)

Profit/(loss) before taxation

2,841

(1,396)

7,823

Taxation

-

-

-

Profit/(loss) attributable to the equity holders of the Company

2,841

(1,396)

7,823

Total comprehensive profit/(loss) for the Period, attributable to the equity holders of the Company

2,841

(1,396)

7,823

Loss per share

Basic (pence per share)

3

1.914

(1.521)

6.705

Diluted (pence per share)

3

1.814

n/a

6.609

CADENCE MINERALS PLC

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

FOR THE PERIOD ENDED 30 JUNE 2021

 

Share capital

Share premium account

Share-based payment reserve

Retained earnings

Total equity

£'000

£'000

£'000

£'000

£'000

Balance at 1 January 2020 (restated)

1,471

30,357

1,383

(22,225)

10,986

Transfer on lapse of warrants

-

-

(203)

203

-

Issue of share capital

238

1,471

-

-

1,709

Costs of share issue

-

(81)

-

-

(81)

Transactions with owners

238

1,390

(203)

203

1,628

Loss for the Period

-

-

-

(1,396)

(1,396)

Total comprehensive loss for the Period

-

-

-

(1,396)

(1,396)

Balance at 30 June 2020 (unaudited and restated)

1,709

31,747

1,180

(23,418)

11,218

Share based payments

-

-

57

-

57

Transfer on lapse of warrants

-

-

(1,166)

1,166

-

Transfer on exercise of warrants

-

-

(32)

32

-

Issue of share capital

187

1,522

-

-

1,709

Costs of share issue

-

(110)

-

-

(110)

Transactions with owners

187

1,412

(1,141)

1,198

1,656

Profit for the Period

-

-

-

9,219

9,219

Total comprehensive loss for the Period

-

-

-

9,219

9,219

Balance at 31 December 2020

1,896

33,159

39

(13,001)

22,093

Share based payments

-

-

197

-

197

Transfer on exercise of warrants

-

-

(9)

9

-

Issue of share capital

7

50

-

-

57

Costs of share issue

-

(1)

-

-

(1)

Transactions with owners

7

49

188

9

253

Profit for the Period

-

-

-

2,841

2,841

Total comprehensive loss for the Period

-

-

-

2,841

2,841

Balance at 30 June 2020 (unaudited)

1,903

33,208

227

(10,151)

25,187

 

 

 

 

 

 

 

 

 

 

CADENCE MINERALS PLC

STATEMENT OF FINANCIAL POSITION

AS AT 30 JUNE 2021

 

Unaudited

Unaudited

Audited

 30 June 2021

 30 June 2020 (restated)

 31 December 2020

Assets

Notes

£'000

£'000

£'000

Non-current

Financial Assets

3,203

2,837

2,885

3,203

2,837

2,885

Current assets

Trade and other receivables

5,901

6,033

5,365

Financial Assets

14,878

4,222

13,761

Cash and cash equivalents

1,387

362

596

Total current assets

22,166

10,617

19,722

Total assets

25,369

13,454

22,607

EQUITY AND LIABILITIES

Current liabilities

Trade and other payables

182

158

295

Borrowings

-

2,078

219

Total current liabilities and total liabilities

182

2,236

514

Equity

Share capital

4

1,903

1,709

1,896

Share premium

33,208

31,747

33,159

Share based payment reserve

227

1,180

39

Retained earnings

(10,151)

(23,418)

(13,001)

Total equity and liabilities

to owners of the Company

25,187

11,218

22,093

Total equity and liabilities

25,369

13,454

22,607

CADENCE MINERALS PLC

CONSOLIDATED CASH FLOW STATEMENT

FOR THE PERIOD 30 JUNE 2021

 

Unaudited Period ended

Unaudited Period ended

Audited Year ended

30 June 2021

30 June 2020 (restated)

 31 December 2020

£'000

£'000

£'000

Cash flows from operating activities

Operating profit/(loss)

2,837

(1,016)

8,935

Net realised/unrealised (profit)/loss on financial investments

(3,539)

417

(10,317)

Equity settled share-based payments

197

-

57

(Increase)/decrease in trade and other receivables

(536)

111

32

(Decrease) in trade and other payables

(113)

(185)

(68)

Net cash outflow from operating activities

(1,154)

(673)

(1,361)

Taxation

-

-

-

Cash flows from investing activities

Payments for current financial investments

(473)

-

(50)

Receipts on sale of current investments

2,895

806

2,052

Payments for non-current financial investments

(318)

(624)

(645)

Net cash inflow from investing activities

2,104

182

1,357

Cash flows from financing activities

Proceeds from issue of share capital

57

1,295

2,723

Share issue costs

(1)

(81)

(191)

Net loan repayments

(219)

(643)

(2,120)

Finance cost

(3)

(199)

(292)

Net cash (outflow)/inflow from financing activities

(166)

372

120

Net increase/(decrease) in cash and cash equivalents

784

(119)

116

Foreign exchange movements on cash and cash equivalents

7

-

(1)

Cash and cash equivalents at beginning of Period

596

481

481

Cash and cash equivalents at end of Period

1,387

362

596

NOTES TO THE INTERIM REPORT

FOR THE PERIOD ENDED 30 JUNE 2021

 

1 BASIS OF PREPARATION

 

The interim financial statements have been prepared in accordance with applicable accounting standards and under the historical cost convention. The financial information set out in this interim report does not constitute statutory accounts as defined in section 434 of the Companies Act 2006. The Group's statutory financial statements for the year ended 31 December 2020 have been delivered to the Registrar of Companies. The auditor's report on those financial statements was unqualified.

 

The principal accounting policies of the Group are consistent with those detailed in the 31 December 2020 financial statements, which are prepared in accordance with International Financial Reporting Standards as adopted by the European Union (adopted IFRSs).

 

PRIOR PERIOD RESTATEMENT

 

Cadence Minerals plc is an investment entity and its interests are held exclusively with a view to subsequent resale. Historically the Company adopted a consolidation policy which didn't reflect the nature, purpose and cashflows of the entity. This policy has been amended and the periods prior to 31 December 2020 have been restated in recognition of the change in accounting policy in line with IAS 8.

 

All investments preciously wrongly classified have been reclassified as Financial Assets held at Fair Value through Profit and Loss ("FVPTL"). The prior year accounts have been restated as a result. Additionally, deposits have been reclassified from cash and cash equivalent to other debtors as it is not considered to be readily available. Full details of the restatement are included in the financial statements for the year ended 31 December 2020.

 

GOING CONCERN

 

The Directors have prepared cash flow forecasts for the Period ending 30 September 2022. The forecasts demonstrate that the Group has sufficient funds to allow it to continue in business for a period of at least twelve months from the date of approval of these financial statements. Accordingly, the accounts have been prepared on a going concern basis.

 

CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS

 

Estimates and judgements are continually evaluated and are based on historical experience and other factors, including expectations of future events that are believed to be reasonable under the circumstances.

 

The Group makes estimates and assumptions concerning the future. The resulting accounting estimates will, by definition, seldom equal the related actual results

 

2 SEGMENTAL REPORTING

 

The Company operates a single primary activity to invest in businesses so as to generate a return for the shareholders.

 

 

3 PROFIT PER SHARE

 

The calculation of the loss per share is based on the loss attributable to ordinary shareholders divided by the weighted average number of shares in issue during the Period.

 

Unaudited

Unaudited

Audited

six months ended

six months ended

year ended

30 June 2021

30 June 2020 (restated)

31 December 2020

£'000

£'000

£'000

Profit/(loss) on ordinary activities after tax (£'000)

2,841

(1,396)

7,823

Weighted average number of shares for calculating basic profit/loss per share

148,420,359

91,777,913

116,675,272

Share options and warrants exercisable

8,198,405

n/a

1,698,405

Weighted average number of shares for calculating diluted profit per share

156,618,764

n/a

118,373,677

Basic profit/(loss) per share (pence)

1.914

(1.521)

6.705

Diluted profit per share (pence)

1.814

n/a

6.609

 

4 SHARE CAPITAL

 

Unaudited

Unaudited

Audited

30 June 2021

30 June 2020

31 December 2020

£'000

£'000

£'000

Allotted, issued and fully paid

173,619,050 deferred shares of 0.24p (30 June and 31 December 2020: 173,619,050)

417

417

417

148,649,098 ordinary shares of 1p (30 June 2020 129,264,891, 31 December 2020: 147,949,098)

1,486

1,292

1,479

1,903

1,709

1,896

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
IR BGGDISDDDGBL
Date   Source Headline
7th May 20248:24 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
18th Apr 20247:00 amRNSFurther Progress at the Amapa Iron Ore Project
11th Apr 202410:01 amRNSEuropean Metals Holdings - Cinovec Lithium Project
9th Apr 20248:59 amRNSCorporate Update - Evergreen Lithium
5th Apr 20241:23 pmRNSPlacing to raise £500,000 & Issue of Warrants
28th Mar 20249:59 amRNSUpdate on Amapá Project investment & Equity Stake
27th Mar 202410:25 amRNSEuropean Metals Holdings - Cinovec Project Update
22nd Mar 20247:00 amRNSOptimisation Study Delivers Savings at Amapá
14th Mar 20249:18 amRNSCorporate Update - Evergreen Lithium
7th Mar 20247:00 amRNSProgress at the Amapá Project & Corporate Update
29th Jan 202410:05 amRNSCorporate Update
29th Jan 20249:53 amRNSEMH - Cinovec Exploration Licenses
22nd Jan 20248:56 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
22nd Dec 20238:15 amRNSCorporate Update – European Metals Holdings
30th Nov 20239:06 amRNSCorporate Update - Evergreen Lithium
22nd Nov 202311:39 amRNSCorporate Update - Hastings Technology Metals
16th Nov 20237:00 amRNSSonora Lithium Investment Update
9th Nov 20239:12 amRNSCorporate Update - European Metals Holdings
31st Oct 20237:00 amRNSDirector Share Purchases
30th Oct 20237:00 amRNSStrategic Development and Financing
29th Sep 20239:53 amRNSInterim Results
18th Sep 20238:43 amRNSCorporate Update - Evergreen Lithium
12th Sep 20239:10 amRNSCorporate Update - Hastings Technology Metals
11th Sep 20239:44 amRNSAmapá Iron Ore Project Update
31st Aug 20237:52 amRNSSonora Lithium Investment Update
16th Aug 202311:52 amRNSResult of AGM
4th Aug 20238:55 amRNSCorporate Update - Hastings Technology Metals
25th Jul 202312:25 pmRNSNotice of AGM
21st Jul 202310:12 amRNSCorporate Update – European Metals Holdings
28th Jun 20239:11 amRNSCorporate Update - Evergreen Lithium ANT Analysis
27th Jun 20237:00 amRNSAnnual Results for the year ended 31 December 2022
13th Jun 20239:49 amRNSCorporate Update - Hastings Technology Metals
9th Jun 202311:46 amRNSUpdate EMH Land secured for Cinovec lithium plant
1st Jun 20239:01 amRNSCorporate Update - Evergreen Lithium
31st May 202312:52 pmRNSCorporate Update - Hastings Technology Metals
26th May 20232:48 pmRNSAmapa Project Update & Loan Financing
25th May 20231:43 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
25th May 20238:42 amRNSEMH Announcement: Outstanding Lithium Recoveries
10th May 202312:12 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
3rd May 20235:17 pmRNSCorporate Update - Hastings Technology Metals
13th Apr 20238:56 amRNSNotice of Substantial Shareholder in Evergreen
1st Mar 20237:00 amRNSCorporate Update
30th Jan 202311:47 amRNSEuropean Metals Announcement: Just Transition Fund
26th Jan 20238:26 amRNSListing of Evergreen Lithium on the ASX
25th Jan 20238:35 amRNSCompletion of Sale of Yangibana JV Interest
10th Jan 20232:05 pmRNSSecond Price Monitoring Extn
10th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSDirector Share Purchases
3rd Jan 20237:00 amRNSCompletion of PFS on Amapá Iron Ore Project
30th Dec 20227:00 amRNSCorporate Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.