The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.60
Bid: 3.50
Ask: 3.70
Change: 0.05 (1.41%)
Spread: 0.20 (5.714%)
Open: 3.55
High: 3.60
Low: 3.55
Prev. Close: 3.55
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Macarthur Lake Giles Project Feasibility Update

16 Apr 2021 09:51

RNS Number : 7271V
Cadence Minerals PLC
16 April 2021
 

Cadence Minerals Plc

("Cadence Minerals", "Cadence")

 

Feasibility Study Update: Macarthur Minerals (TSX-V: MMS) (ASX: MIO) moves ahead with mine design for Lake Giles Iron Project.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the "Company" or "Macarthur") has updated on the progress made on the mining and haulage components of the Feasibility Study for the Lake Giles Iron Project. Macarthur has been working with Orelogy Mining Consultants ("Orelogy") and Pells Sullivan Meynink ("PSM") on the mine design and road haulage aspects of the Project.

 

Highlights:

· Macarthur engagement of Orelogy and PSM on mine design, geotechnical design and road haulage pricing.

· Request for Budget Pricing ("RFBP") submitted to contract mining and road haulage operators to establish contractor pricing for operations.

· Geotechnical drilling program defined for the Moonshine and Moonshine North pits to establish geotechnical parameters for final pit designs.

 

Macarthur has been working with mining consultants Orelogy and geotechnical engineers from PSM on the mine design for the Lake Giles Iron Project. Orelogy has completed preliminary pit optimisations, designs, scheduling and project layouts to support an operation targeting production of 3 Mtpa (dry) magnetite concentrate. Additionally, PSM has been supporting the mine design through a geotechnical review of drill core and project geology.

 

A request for budget pricing (RFBP) has been submitted to several local mining contractors for contract mining and road haulage services including:

· Site establishment

· Site preparation

· Drill and Blast

· Excavate, load and haul

· Road haulage to the railhead

· Road maintenance

· Loading of rail wagons

 

PSM has designed a diamond drill program to obtain detailed geotechnical parameters for final pit designs. Macarthur is currently engaging with drilling contractors to undertake this drill program as soon as possible.

 

The full announcement can be viewed here: https://macarthurminerals.com/wp-content/uploads/2021/04/MMS-NR-FS-update-Mine-Design_15-April-2021.pdf

 

Macarthur Minerals CEO Andrew Bruton commented: "Macarthur is pleased to be working with Orelogy and PSM on this important component of the Feasibility Study for the magnetite mining operations at Lake Giles. An extensive body of work is being undertaken on the mine design and geotechnical design and securing contractor pricing for mining and road haulage costs is important to ensure that mining operations can be optimised. This budget pricing information will help inform the next phase of work that Orelogy and PSM will be undertaking.

 

The Macarthur feasibility study team continues to make significant progress and is critically examining options for mine design that will maximise the value of the project for the benefit of shareholders. You can see from the preliminary design diagram that the mine pits and scale of the operation is huge. The area of the pits stretch over 6 kilometres and we are only currently focused on the first 20 plus years of mine and plant life. The scale of a billion-tonne magnetite resource in such close proximity to existing rail and port infrastructure is very unique globally. I am ensuring that the project steps are incremental so that Macarthur has the capacity and internal resources to bring the first stage into production.

 

We look forward to updating the market as the Feasibility Study continues to progress."

 

Cadence Minerals Holding in Macarthur

 

Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.

 

This news release is not for distribution to United States Services or for Dissemination in the United States. 

- Ends -

 

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

 

Kiran Morzaria

 

 

 

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

 

James Sinclair-Ford

 

 

 

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

  

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding Cadence Minerals Plc's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKZGMDRVGGMZG
Date   Source Headline
14th Dec 20207:00 amRNSNotice of Annual General Meeting
4th Dec 202010:49 amRNSDirector Share Purchases
20th Nov 202012:43 pmRNSDirector Share Purchases
16th Nov 20203:58 pmRNSYangibana Drilling Extends Simons Find
13th Nov 20202:10 pmRNSExercise of Warrants and Conversion of Loan Note
12th Nov 20209:53 amRNSDirector Share Purchases
10th Nov 20206:21 pmRNSAdmission of Shares
10th Nov 20209:31 amRNSDirector Share Purchases
9th Nov 202010:54 amRNSDirector Share Purchases
4th Nov 202010:18 amRNSDirector Share Purchases and Exercise of Options
2nd Nov 20207:06 amRNSEmployee Benefit Trust and Share Incentive Plan
2nd Nov 20207:04 amRNSUpdated Mineral Resource Estimate - Amapa Iron Ore
2nd Nov 20207:00 amRNSAmapa Iron Ore Project - Update
13th Oct 202011:18 amRNSOutstanding Yangibana Drill Results
2nd Oct 20203:48 pmRNSMacarthur Lake Giles Magnetite Mineral Resource
23rd Sep 202010:02 amRNSEuropean Metals Appoints Lead Engineer at Cinovec
21st Sep 20204:41 pmRNSSecond Price Monitoring Extn
21st Sep 20204:36 pmRNSPrice Monitoring Extension
17th Sep 202010:22 amRNSExcellent Drill Results at Yangibana
10th Sep 20209:04 amRNSBacanora Sonora and Lithium Market Update
2nd Sep 20202:42 pmRNSMacarthur Minerals Develops Port Rail Solution
2nd Sep 202012:09 pmRNSAgreement in Principle to Bank Creditor Settlement
28th Aug 20209:38 amRNSInterim Results
26th Aug 202010:34 amRNSHastings Technology Metals Placement Raises $14.6m
26th Aug 20207:00 amRNSUpdate on Investment in the Amapa Iron Ore Project
21st Aug 20201:40 pmRNSMacarthur JV Partner Acquires Iron Ore Project
21st Aug 20207:00 amRNSPlacing to Raise £1.25 million
17th Aug 20204:41 pmRNSSecond Price Monitoring Extn
17th Aug 20204:35 pmRNSPrice Monitoring Extension
14th Aug 20201:04 pmRNSExercise of Warrants
12th Aug 20208:34 amRNSMacarthur Moonshine Magnetite Resource Upgrade
11th Aug 20207:00 amRNSAmapa Update
10th Aug 20209:49 amRNSEMH Commences Cinovec Drilling Programme
29th Jul 20209:40 amRNSYangibana Project Costs Reduced By A$68m Or 13%
29th Jul 20209:35 amRNSA$68m Capex Reduction at Yangibana Project
29th Jul 20207:00 amRNSMacarthur Minerals engages RCR Rail Technology
28th Jul 20202:05 pmRNSSecond Price Monitoring Extn
28th Jul 20202:00 pmRNSPrice Monitoring Extension
28th Jul 20201:55 pmRNSChange of Registered Address
28th Jul 20208:54 amRNSEMH - European Body Partnership Agreement
15th Jul 20203:22 pmRNSMacarthur Minerals - Arc Track Access Agreement
14th Jul 20209:42 amRNSEMH DGWA Appointment & Proposed Czech Listing
7th Jul 20201:33 pmRNSAmapá Project Update
1st Jul 20209:25 amRNSYangibana Finnvera Project Financing
26th Jun 20203:23 pmRNSMacarthur Minerals - Lake Giles Developments
26th Jun 20207:00 amRNSResults for the Year Ended 31 December 2019
18th Jun 20209:32 amRNSMajor Drilling Programme Commences at Yangibana
17th Jun 202010:58 amRNSYangibana Works Construction Permit Granted
16th Jun 20207:00 amRNSAmapá Operational Update
8th Jun 20207:00 amRNSAmapá Operational Update,Placing to Raise £650,000

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.