Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Update on ConRoast

21 Jul 2010 07:00

RNS Number : 6151P
Jubilee Platinum PLC
21 July 2010
 



AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

 

21 July 2010

 

JUBILEE PLATINUM PLC

("Jubilee" or "the company")

 

Update on ConRoast

 

Jubilee is pleased to provide an update regarding progress of the planned development of its first fully commercial ConRoast DC arc furnace. The Company is also pleased to provide interim results of pilot scale refining trials using the Chemical Vapour Metal Refining Inc. ("CVMR®") (carbonylation) process for the recovery of platinum group metals ("PGM") and base metals (nickel, iron and cobalt) from ConRoast iron-rich alloy.

 

Highlights

 

 

§ Engineering and design study fast-tracked for the installation of the Company's first commercial ConRoast DC arc furnace utilising existing infrastructure and equipment at the newly acquired Middleburg processing facility;

 

§ Four-phase feasibility study ("FS") commissioned for the refining of metals in ConRoast PGM alloy using the CVMR® process;

 

§ Phase 1 - pilot scale CVMR® process trials achieved exceptional results in the extraction of base metals: 99.5% of nickel and 95.6% of iron from ConRoast alloy as separate potentially premium grade nickel and iron products and a high grade PGM residue; and

 

§ Phase 2 commenced comprising additional refining testwork and preparation of feasibility study documents.

 

 

 

Colin Bird CEO of Jubilee Platinum commented, "We are pleased to report positive progress with the ConRoast furnace installation programme and the exceptional interim pilot refining results from testwork on ConRoast alloy. The interim results have demonstrated the applicability of a relatively simple but proven and potentially low energy route for refining of ConRoast alloy to produce separate high value PGM and potentially premium priced nickel and iron products. We look forward to increasing the momentum for the development of ConRoast and Jubilee's total capability."

 

Conversion AC to First DC Arc Furnace

The company has commissioned Environmental & Process Solutions (Pty) Ltd, to undertake an engineering and design study ("EDS"), in order to fast track the commissioning of the new 5MVA ConRoast DC ARC furnace. The EDS will maximise the use of existing infrastructure at the newly acquired Middleburg site.

 

The EDS will require 4 weeks to complete. A further estimated 6 weeks is planned for concluding a procurement and management contract to install the furnace and associated equipment, the completion and commissioning of which is expected in early 2011.

 

The company has secured all required funding for this first fully commercial ConRoast DC arc furnace.

 

Refining Testwork

 

The company commissioned CVMR® of Toronto, Canada earlier this year to undertake a four-phase FS for the extraction and refining of metals in ConRoast alloy utilising the CVMR® process, which in essence extracts nickel, iron, and cobalt as gaseous metal carbonyls (carbonylation) using carbon monoxide gas (see below for description of process).

 

Phase 1, comprising 3 pilot-scale campaigns has been completed on samples of ConRoast alloy, which was produced during ConRoast R&D trials at Mintek in 2007.

 

Excellent results have been obtained with extraction yields (carbonylation) of 99.5% for nickel and 95.6% for iron. After extraction, followed by condensation and fractional distillation, at low pressure, of the nickel-iron carbonyls, the separate distillates were decomposed to produce high purity nickel and iron powders. A PGM-rich copper residue, unaffected by carbonlylation, remained after the extraction stage of the base metals. Preliminary calculations indicate that nickel powder with levels of iron below 50ppm and iron powders with nickel levels below 100ppm are achievable and could command potentially premium metal prices. The interim report noted that the low-pressure distillation system should have positive implications for both capital and operating costs of the process.

 

These results warranted progress to phase 2, which has now commenced. This comprises additional testwork to address cobalt recovery and residual iron sulphide contamination in the PGM residue product, and the preparation of feasibility study documentation.

 

 

CVMR® Process

 

The CVMR® process, based on the Mond (carbonyl) process, makes use of the fact that carbon monoxide gas reacts readily (carbonylation) with nickel, iron and cobalt under mild conditions to give gaseous metal carbonyls. The carbonyl gases are then condensed, the condensates separated by fractional distillation and the distillates decomposed to produce separate high purity metals and carbon monoxide gas for reuse. PGMs and copper are unaffected by the carbonylation. Thus this process is eminently applicable to the refining of the ConRoast iron-rich nickel-copper-PGM-bearing alloy.

 

 

Colin Bird/Leon Coetzer

Jubilee Platinum plc

Tel + 27 (0) 11 235 3280 +44 (0) 20 7584 2155

 

Andrew Sarosi

Jubilee Platinum plc

Tel +44 (0) 1752 221937

 

Matthew Robinson/Edward Frisby

finnCap Ltd

Tel +44 (0) 20 7600 1658

 

Sharon Owens/Leonard Eiser

Sasfin Capital 

Tel +27 (0) 11 809 7500

 

Michael Kinirons/Nick Rome

Bishopsgate Communications Ltd

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUUAMUPUGUU
Date   Source Headline
29th May 20267:00 amRNSNotice of General Meeting
28th May 20262:10 pmRNSStrategic Investment to Support Copper Growth
6th May 20267:00 amRNSOperational and Production Update 9m FY2026
29th Apr 20267:00 amRNSCapital Reduction Court Approval
20th Apr 20264:05 pmRNSHolding(s) in Company
8th Apr 20262:57 pmRNSResults of GM & Proposed Capital Reduction
31st Mar 20267:01 amRNSImplementation of Mine Plan at Molefe
31st Mar 20267:00 amRNSFinancial report for 6 months to end-December 2025
25th Mar 20267:05 amRNSMolefe Mine Phase 1 Drilling Results
24th Mar 20267:00 amRNSMolefe Mine Phase 1 Drilling Results delayed
23rd Mar 202610:05 amRNSReduction of Share Premium Account & Notice of GM
23rd Mar 20267:00 amRNSReduction of Share Premium Account & Notice of GM
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
12th Mar 20267:00 amRNSHigh-Grade Feed Secured & Large Waste Rock Update
27th Feb 20267:00 amRNSShareholder update and Dealing in securities
19th Feb 20267:00 amRNSOperational and Projects update H1 FY2026
23rd Jan 20267:00 amRNSChanges to the Board
14th Jan 20262:19 pmRNSResults of Annual General Meeting
6th Jan 20267:00 amRNSReceipt of US$10 million in funds from SA sale
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
2nd Jan 20267:00 amRNSClosing of Sale of South African Operations
17th Dec 20257:00 amRNSAudited Results for FY2025 & Notice of AGM
28th Nov 20257:00 amRNSMolefe Mine Co-Operation and Development Agreement
21st Nov 20257:00 amRNSOperational Update Zambia Q1 FY2026
17th Nov 20257:00 amRNSCompetition Tribunal Approval
17th Oct 20257:00 amRNSOperational Update South Africa Q1 FY2026
6th Oct 20256:06 pmRNSTR-1: notification of major holdings
6th Oct 20257:00 amRNSZambia Copper Strategy and SA Disposal Update
8th Sep 20257:00 amRNSDealing in securities
28th Aug 20252:05 pmRNSResults of General Meeting
12th Aug 20257:00 amRNSPosting of Circular & Notice of General Meeting
6th Aug 20257:00 amRNSZambia Copper and SA Business Proposed Sale Update
21st Jul 20257:00 amRNSQ4 Operational Update - South Africa
10th Jul 20257:00 amRNSChange of Broker and Proposed Disposal Update
19th Jun 20257:00 amRNSDirectorate Change
5th Jun 20257:00 amRNSProposed Disposal of Chrome and PGM Operations
28th May 20257:02 amRNSZambia Projects Update & Issue of equity
30th Apr 20257:40 amRNSZambia Progress Update
16th Apr 20257:00 amRNSOperational Update Q3 FY2025
14th Apr 20257:00 amRNSDirectorate Change
9th Apr 20257:00 amRNSTransaction on Surplus PGM Feed Material
3rd Apr 20257:00 amRNSJubilee Transaction on Large Waste Project
31st Mar 20257:00 amRNSInterim Financial Report 6 Months to December 2024
14th Feb 20257:00 amRNSRoan Commences High Grade Copper Production
6th Feb 20257:00 amRNSZambia Projects Update
21st Jan 20257:00 amRNSAdditional power supply secured for Roan re-start
13th Jan 20257:00 amRNSOperational Update H1 FY2025
24th Dec 20247:00 amRNSHolding(s) in Company
16th Dec 20247:00 amRNSZambia Operations Update and Exercise of Options
21st Nov 20247:00 amRNSTR-1: notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.