Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    0.00 (0.00%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Update on ConRoast

21 Jul 2010 07:00

RNS Number : 6151P
Jubilee Platinum PLC
21 July 2010
 



AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

 

21 July 2010

 

JUBILEE PLATINUM PLC

("Jubilee" or "the company")

 

Update on ConRoast

 

Jubilee is pleased to provide an update regarding progress of the planned development of its first fully commercial ConRoast DC arc furnace. The Company is also pleased to provide interim results of pilot scale refining trials using the Chemical Vapour Metal Refining Inc. ("CVMR®") (carbonylation) process for the recovery of platinum group metals ("PGM") and base metals (nickel, iron and cobalt) from ConRoast iron-rich alloy.

 

Highlights

 

 

§ Engineering and design study fast-tracked for the installation of the Company's first commercial ConRoast DC arc furnace utilising existing infrastructure and equipment at the newly acquired Middleburg processing facility;

 

§ Four-phase feasibility study ("FS") commissioned for the refining of metals in ConRoast PGM alloy using the CVMR® process;

 

§ Phase 1 - pilot scale CVMR® process trials achieved exceptional results in the extraction of base metals: 99.5% of nickel and 95.6% of iron from ConRoast alloy as separate potentially premium grade nickel and iron products and a high grade PGM residue; and

 

§ Phase 2 commenced comprising additional refining testwork and preparation of feasibility study documents.

 

 

 

Colin Bird CEO of Jubilee Platinum commented, "We are pleased to report positive progress with the ConRoast furnace installation programme and the exceptional interim pilot refining results from testwork on ConRoast alloy. The interim results have demonstrated the applicability of a relatively simple but proven and potentially low energy route for refining of ConRoast alloy to produce separate high value PGM and potentially premium priced nickel and iron products. We look forward to increasing the momentum for the development of ConRoast and Jubilee's total capability."

 

Conversion AC to First DC Arc Furnace

The company has commissioned Environmental & Process Solutions (Pty) Ltd, to undertake an engineering and design study ("EDS"), in order to fast track the commissioning of the new 5MVA ConRoast DC ARC furnace. The EDS will maximise the use of existing infrastructure at the newly acquired Middleburg site.

 

The EDS will require 4 weeks to complete. A further estimated 6 weeks is planned for concluding a procurement and management contract to install the furnace and associated equipment, the completion and commissioning of which is expected in early 2011.

 

The company has secured all required funding for this first fully commercial ConRoast DC arc furnace.

 

Refining Testwork

 

The company commissioned CVMR® of Toronto, Canada earlier this year to undertake a four-phase FS for the extraction and refining of metals in ConRoast alloy utilising the CVMR® process, which in essence extracts nickel, iron, and cobalt as gaseous metal carbonyls (carbonylation) using carbon monoxide gas (see below for description of process).

 

Phase 1, comprising 3 pilot-scale campaigns has been completed on samples of ConRoast alloy, which was produced during ConRoast R&D trials at Mintek in 2007.

 

Excellent results have been obtained with extraction yields (carbonylation) of 99.5% for nickel and 95.6% for iron. After extraction, followed by condensation and fractional distillation, at low pressure, of the nickel-iron carbonyls, the separate distillates were decomposed to produce high purity nickel and iron powders. A PGM-rich copper residue, unaffected by carbonlylation, remained after the extraction stage of the base metals. Preliminary calculations indicate that nickel powder with levels of iron below 50ppm and iron powders with nickel levels below 100ppm are achievable and could command potentially premium metal prices. The interim report noted that the low-pressure distillation system should have positive implications for both capital and operating costs of the process.

 

These results warranted progress to phase 2, which has now commenced. This comprises additional testwork to address cobalt recovery and residual iron sulphide contamination in the PGM residue product, and the preparation of feasibility study documentation.

 

 

CVMR® Process

 

The CVMR® process, based on the Mond (carbonyl) process, makes use of the fact that carbon monoxide gas reacts readily (carbonylation) with nickel, iron and cobalt under mild conditions to give gaseous metal carbonyls. The carbonyl gases are then condensed, the condensates separated by fractional distillation and the distillates decomposed to produce separate high purity metals and carbon monoxide gas for reuse. PGMs and copper are unaffected by the carbonylation. Thus this process is eminently applicable to the refining of the ConRoast iron-rich nickel-copper-PGM-bearing alloy.

 

 

Colin Bird/Leon Coetzer

Jubilee Platinum plc

Tel + 27 (0) 11 235 3280 +44 (0) 20 7584 2155

 

Andrew Sarosi

Jubilee Platinum plc

Tel +44 (0) 1752 221937

 

Matthew Robinson/Edward Frisby

finnCap Ltd

Tel +44 (0) 20 7600 1658

 

Sharon Owens/Leonard Eiser

Sasfin Capital 

Tel +27 (0) 11 809 7500

 

Michael Kinirons/Nick Rome

Bishopsgate Communications Ltd

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUUAMUPUGUU
Date   Source Headline
5th Sep 201712:30 pmRNSNew Partnership Agreement, 3rd Party Ore Agreement
31st Jul 201711:52 amRNSPlatinum Projects Quarterly Update - Q2 2017
22nd Jun 20173:00 pmRNSDirector Dealing
15th Jun 20171:30 pmRNSHernic Project Reaches Full Production
19th May 201710:30 amRNSHernic Project Ramping-Up and Live Webcast
9th May 20179:00 amRNSMarket Update
30th Mar 20173:18 pmRNSInterim Results - replacement
30th Mar 201712:15 pmRNSInterim Results
29th Mar 20172:15 pmRNSJubilee commences platinum production
17th Mar 20177:00 amRNSExecution of Platinum Tailings Agreement
14th Mar 20171:15 pmRNSFinal proceeds from Middelburg and DCM update
9th Mar 20177:00 amRNSJubilee Executes Surface Tailings Transaction
6th Mar 20179:45 amRNSDCM Operations update and Exercise of warrants
2nd Mar 20178:30 amRNSTjate Executes Mining Right
21st Feb 20173:15 pmRNSExercise of last warrants at specific issue price
15th Feb 20173:31 pmRNSExercise of Last Warrants at Specific Issue Price
13th Feb 201711:45 amRNSExercise of Warrants
8th Feb 20178:45 amRNSExercise of Warrants
6th Feb 20172:45 pmRNSHernic Project in Production
3rd Feb 20179:30 amRNSExercise of Warrants
30th Jan 20179:00 amRNSHernic Tailings Project update
25th Jan 20172:00 pmRNSExercise of Warrants
17th Jan 20171:00 pmRNSUpdate notification and Exercise of Warrants
6th Dec 20161:31 pmRNSResults of AGM and Change of Registered Office
28th Nov 20161:15 pmRNSJubilee Live Interactive Webcast
14th Nov 20168:00 amRNSAudited results for the year ended 30 June 2016
11th Nov 20161:15 pmRNSExercise of Warrants & Dealing in Securities
9th Nov 201612:30 pmRNSBraemore Tailings Project
21st Oct 20168:45 amRNSPlatinum Projects quarterly update
15th Sep 20167:00 amRNSPlatinum Projects update
19th Aug 201612:00 pmRNSJubilee Live Interactive Webcast
18th Aug 20167:00 amRNSPlatinum Projects update
11th Jul 20168:00 amRNSPlatinum Projects Quarterly Update
7th Jun 201611:30 amRNSJubilee Processing Operational Update
27th May 201612:00 pmRNSExercise of Warrants
20th May 201612:30 pmRNSDealing in securities
12th May 20161:30 pmRNSJubilee Processing Operational Update
29th Apr 201612:30 pmRNSResults of General Meeting
28th Apr 201612:30 pmRNSTailings Projects Further Update
19th Apr 201611:00 amRNSTailings Projects Update
8th Apr 20167:00 amRNSNotice of General Meeting
31st Mar 20167:00 amRNSInterim Results
22nd Mar 20167:00 amRNSProject Funding for Surface Platinum Processing
14th Mar 201611:15 amRNSUpdate on Platinum Surface Processing Operations
1st Mar 20162:30 pmRNSExercise of Warrants
22nd Feb 20167:00 amRNSShareholder update
12th Jan 20167:00 amRNSJubilee Live Interactive Webcast
15th Dec 201510:30 amRNSFinal Agreement for Surface platinum project
8th Dec 20151:30 pmRNSCompletion of acquisition in DCM Platinum Project
2nd Dec 20153:30 pmRNSResults of Annual General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.