Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Update on ConRoast

21 Jul 2010 07:00

RNS Number : 6151P
Jubilee Platinum PLC
21 July 2010
 



AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

 

21 July 2010

 

JUBILEE PLATINUM PLC

("Jubilee" or "the company")

 

Update on ConRoast

 

Jubilee is pleased to provide an update regarding progress of the planned development of its first fully commercial ConRoast DC arc furnace. The Company is also pleased to provide interim results of pilot scale refining trials using the Chemical Vapour Metal Refining Inc. ("CVMR®") (carbonylation) process for the recovery of platinum group metals ("PGM") and base metals (nickel, iron and cobalt) from ConRoast iron-rich alloy.

 

Highlights

 

 

§ Engineering and design study fast-tracked for the installation of the Company's first commercial ConRoast DC arc furnace utilising existing infrastructure and equipment at the newly acquired Middleburg processing facility;

 

§ Four-phase feasibility study ("FS") commissioned for the refining of metals in ConRoast PGM alloy using the CVMR® process;

 

§ Phase 1 - pilot scale CVMR® process trials achieved exceptional results in the extraction of base metals: 99.5% of nickel and 95.6% of iron from ConRoast alloy as separate potentially premium grade nickel and iron products and a high grade PGM residue; and

 

§ Phase 2 commenced comprising additional refining testwork and preparation of feasibility study documents.

 

 

 

Colin Bird CEO of Jubilee Platinum commented, "We are pleased to report positive progress with the ConRoast furnace installation programme and the exceptional interim pilot refining results from testwork on ConRoast alloy. The interim results have demonstrated the applicability of a relatively simple but proven and potentially low energy route for refining of ConRoast alloy to produce separate high value PGM and potentially premium priced nickel and iron products. We look forward to increasing the momentum for the development of ConRoast and Jubilee's total capability."

 

Conversion AC to First DC Arc Furnace

The company has commissioned Environmental & Process Solutions (Pty) Ltd, to undertake an engineering and design study ("EDS"), in order to fast track the commissioning of the new 5MVA ConRoast DC ARC furnace. The EDS will maximise the use of existing infrastructure at the newly acquired Middleburg site.

 

The EDS will require 4 weeks to complete. A further estimated 6 weeks is planned for concluding a procurement and management contract to install the furnace and associated equipment, the completion and commissioning of which is expected in early 2011.

 

The company has secured all required funding for this first fully commercial ConRoast DC arc furnace.

 

Refining Testwork

 

The company commissioned CVMR® of Toronto, Canada earlier this year to undertake a four-phase FS for the extraction and refining of metals in ConRoast alloy utilising the CVMR® process, which in essence extracts nickel, iron, and cobalt as gaseous metal carbonyls (carbonylation) using carbon monoxide gas (see below for description of process).

 

Phase 1, comprising 3 pilot-scale campaigns has been completed on samples of ConRoast alloy, which was produced during ConRoast R&D trials at Mintek in 2007.

 

Excellent results have been obtained with extraction yields (carbonylation) of 99.5% for nickel and 95.6% for iron. After extraction, followed by condensation and fractional distillation, at low pressure, of the nickel-iron carbonyls, the separate distillates were decomposed to produce high purity nickel and iron powders. A PGM-rich copper residue, unaffected by carbonlylation, remained after the extraction stage of the base metals. Preliminary calculations indicate that nickel powder with levels of iron below 50ppm and iron powders with nickel levels below 100ppm are achievable and could command potentially premium metal prices. The interim report noted that the low-pressure distillation system should have positive implications for both capital and operating costs of the process.

 

These results warranted progress to phase 2, which has now commenced. This comprises additional testwork to address cobalt recovery and residual iron sulphide contamination in the PGM residue product, and the preparation of feasibility study documentation.

 

 

CVMR® Process

 

The CVMR® process, based on the Mond (carbonyl) process, makes use of the fact that carbon monoxide gas reacts readily (carbonylation) with nickel, iron and cobalt under mild conditions to give gaseous metal carbonyls. The carbonyl gases are then condensed, the condensates separated by fractional distillation and the distillates decomposed to produce separate high purity metals and carbon monoxide gas for reuse. PGMs and copper are unaffected by the carbonylation. Thus this process is eminently applicable to the refining of the ConRoast iron-rich nickel-copper-PGM-bearing alloy.

 

 

Colin Bird/Leon Coetzer

Jubilee Platinum plc

Tel + 27 (0) 11 235 3280 +44 (0) 20 7584 2155

 

Andrew Sarosi

Jubilee Platinum plc

Tel +44 (0) 1752 221937

 

Matthew Robinson/Edward Frisby

finnCap Ltd

Tel +44 (0) 20 7600 1658

 

Sharon Owens/Leonard Eiser

Sasfin Capital 

Tel +27 (0) 11 809 7500

 

Michael Kinirons/Nick Rome

Bishopsgate Communications Ltd

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUUAMUPUGUU
Date   Source Headline
20th Nov 20243:15 pmRNSExercise of Warrants
12th Nov 20242:20 pmRNSResult of AGM
7th Nov 20247:00 amRNSOperational Update Q1 FY2025
6th Nov 20242:30 pmRNSTR-1: Notification of major holdings
5th Nov 20247:00 amRNSAppointment of Remuneration Committee Chairperson
31st Oct 20247:00 amRNSBoard changes
16th Oct 20247:00 amRNSIntegrated Annual Report FY2024 & Notice of AGM
7th Oct 20247:00 amRNSNotice of Full Year Results Investor Presentation
7th Oct 20247:00 amRNSProject G Acquisition and Power Update
3rd Oct 20247:00 amRNSAudited Results for the year ended 30 June 2024
23rd Sep 20247:00 amRNSCopper Projects Update
19th Sep 20247:00 amRNSManagement changes
27th Aug 20247:00 amRNSPrivate Power Purchase Agreement in Zambia
21st Aug 20247:00 amRNSOperational Update Q4 FY2024
13th Aug 20247:00 amRNSRoan Front-End Module’s First Copper Concentrate
8th Aug 20247:30 amRNSRoan Upgrade Project Commences Operations
24th Jul 20241:00 pmRNSDirector/PDMR Shareholding
23rd Jul 20247:00 amRNSDirector/PDMR Shareholding
15th Jul 20247:00 amRNSChange of Broker
24th Jun 20247:00 amRNSRoll-out of Integrated Copper Strategy in Zambia
10th Jun 20242:10 pmRNSTR-1: Notification of major holdings
3rd Jun 20248:00 amRNSExercise of Warrants and Options
23rd Apr 20247:00 amRNSAppointment of Joint Corporate Broker
18th Apr 20247:00 amRNSOperational Update Q3 FY2024
28th Mar 20247:00 amRNSProjects Update
6th Mar 20243:00 pmRNSExercise of Options
6th Mar 20247:00 amRNSChanges to the Board & New Dedicated Exec Boards
29th Feb 20247:00 amRNSInterim Results 2023 Presentation
28th Feb 20249:31 amRNSInterim Results 2023 Presentation Re-scheduled
26th Feb 20247:00 amRNSInterim Financial Report 6 months to December 2023
8th Feb 20247:00 amRNSZambia Copper Expansion Update
23rd Jan 20247:00 amRNSOperational and Projects Update Q2 FY2024
4th Jan 20243:00 pmRNSTR-1: Notification of major holdings
3rd Jan 202412:00 pmRNSResults of General Meeting
15th Dec 20231:53 pmRNSResults of Placing and Notice of General Meeting
15th Dec 20237:00 amRNSProposed Placing
13th Dec 20232:30 pmRNSReply to Shareholder Correspondence Regarding a GM
12th Dec 20237:00 amRNSInvestment in Historical Waste Rock Dump in Zambia
21st Nov 20233:30 pmRNSInvestor Webcast
17th Nov 20237:00 amRNSNew Corporate Presentation
3rd Nov 20231:30 pmRNSResult of AGM
1st Nov 20237:05 amRNSQ1 Operational Report to 30 September 2023
17th Oct 20237:00 amRNSAward of New Slag Project with Mopani Copper Mines
11th Oct 20237:00 amRNSFinal Results and Notice of AGM
5th Oct 20237:00 amRNSNotice of Results
21st Aug 20237:00 amRNSSouth Africa and Zambia Project Expansion Update
14th Aug 20237:00 amRNSAppointment of CFO and Head of Energy Metals
20th Jul 20237:00 amRNSOperational Update for full year to 30 June 2023
6th Jun 20237:00 amRNSEXPANSION OF CHROME AND PGM FOOTPRINT
4th May 20233:29 pmRNSExercise of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.