Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.85    0.05 (1.79%)
Bid:
2.70
Ask:
3.00
Spread: 0.30 (11.111%)
Market Cap: £91.86m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Operations Update

16 Feb 2012 11:00

RNS Number : 5473X
Jubilee Platinum PLC
16 February 2012
 



AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN GB0031852162 16 February 2012

Jubilee Platinum PLC

("Jubilee" or the "Company")

Update

Jubilee, the AIM and JSE quoted mine to metal specialist is pleased to report an update on its Middelburg ferroalloy smelting operation (70% owned by Jubilee Smelting and Refining (Pty) Ltd.) and development on its Leinster nickel tailings project (the "Nickel Tailings Project" or "Project") in Western Australia.

HIGHLIGHTS

·; Middelburg smelter achieved record 774 tonnes ferroalloy production in January 2012, with continued ramp up of its new furnace;

 

·; Jubilee Smelting and Refining (Pty) Ltd ("JSR") received its environmental permitting to implement both the ConRoast smelting process as well as the refining of the produced PGM (platinum group metal) alloy at its Middelburg Smelting facility; and

 

·; Jubilee's Australian subsidiary, Braemore Nickel (Pty) Ltd ("Braemore") concluded a drilling program on the Leinster nickel sulphide tailings to obtain fresh samples for testwork at Mintek South Africa, in order to refine the scoping flowsheet on the Nickel Tailings Project.

Leon Coetzer, CEO of Jubilee Platinum commented: "We are pleased with the continued improved performance at our Middelburg smelting operation. We have met our set throughput targets for January and will continue to ramp up production through this quarter as we target full production. We have continued acquiring PGM containing feed material as we migrate our smelter capacity from ferroalloy smelting to PGM smelting. 

"With regard to our Australian nickel tailings project, we are pleased to have reached this stage on the project and look forward to the outcome of the confirmation testwork at Mintek with a view towards the potential development of the tailings".

Middelburg Smelter

JSR ramped up production from its new 5MW AC furnace with a record total 774 tonnes of ferroalloy output for January for the smelter operation.

 JSR remains focussed, in the short term, on ramping up the new furnace to its planned combined ferroalloy production of 1,100 tonnes per month in order to maximise cash flow. The extended ramp-up of the furnace was due mainly to initial refractory lining concerns and the nature of the stainless steel material, which prevented running the furnace at full capacity. This has now been resolved.

The Department of Economic Development, Environment and Tourism issued JSR with an Atmospheric Emission Licence in respect of its current and submitted new planned operations. JSR's smelter operation is now fully permitted for the implementation of the ConRoast process and associated refining of the PGM containing alloy. This, together with maximising cash flow from the ferroalloy smelting process, significantly advances JSR's medium term mission for the implementation of the complete ConRoast platinum smelting process and further strengthens its position in negotiations in sourcing PGM-rich chromite tailings.

Nickel Tailings Project

Braemore drilled and obtained fresh samples in January this year from the tailings in Western Australia ("Tailings") for further testwork. The samples have been despatched to Mintek, South Africa's national mineral research organisation, which has been contracted to carry out the testwork. This testwork is towards completion of an Engineering Study and Economic Evaluation (ESEE) of the Project, currently being carried out by Bateman Engineering Projects of South Africa ("Bateman").

Bateman's technical-economic review of the Project recommended testwork comprising pre concentration of the Tailings using a combination of classification and flotation methods in order to refine the Project scoping flowsheet and demonstrate from the ESEE the potential of the Project to meet the criteria stipulated in the Tailings Supply Agreement ("TSA Criteria"). Should the testwork and the ESEE demonstrate the potential to meet the TSA Criteria, the Company would anticipate progressing to a Definitive Feasibility Study on the Project thereafter.

Contacts

Jubilee Platinum plc

Colin Bird/Leon Coetzer

Tel +44 (0) 20 7584 2155 / Tel +27 (0)11 465 1913

Andrew Sarosi

Tel +44 (0) 1752 221937

finnCap Ltd

Matthew Robinson/Rose Herbert - corporate finance

Joanna Weaving - corporate broking

Tel +44 (0) 20 7600 1658 

Shore Capital Stockbrokers Limited (Joint Broker)

Jerry Keen/ Edward Mansfield

Tel: +44 (0) 20 7 408 4090

Sasfin Capital

Leonard Eiser /Sharon Owens

Tel +27 (0) 11 809 7500

Bishopsgate Communications Ltd

Nick Rome/Shabnam Bashir

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMGMZGVDGZZM
Date   Source Headline
1st Mar 20067:01 amRNSExercise of Options
24th Feb 20067:01 amRNSInterim Results
21st Feb 200612:28 pmRNSProspective New Project
13th Feb 20061:08 pmRNSHolding(s) in Company
7th Feb 20065:20 pmRNSHolding(s) in Company
3rd Feb 200611:31 amRNSHolding(s) in Company
2nd Feb 20067:00 amRNSUpdate from Tjate
31st Jan 200611:48 amRNSHolding(s) in Company
27th Jan 20064:06 pmRNSIssue of Loan Note - Replace
27th Jan 20063:22 pmRNSIssue of Loan Note
10th Jan 20067:00 amRNSDirectorate Change
4th Jan 20067:00 amRNSDrill Update from Madagascar
19th Dec 20057:00 amRNSHolding(s) in Company
15th Dec 200512:36 pmRNSUpdate on Tjate - Replacement
15th Dec 20057:01 amRNSUpdate on Tjate
8th Dec 20057:01 amRNSMadagascar Update
5th Dec 20052:58 pmRNSNAMF - Conversion of Holding
25th Nov 200512:34 pmRNSAGM Statement
1st Nov 200510:17 amRNSAgreement with BHP Billiton
28th Oct 20057:00 amRNSFinal Results
6th Oct 20057:00 amRNSUpdate from Madagascar
29th Sep 200510:06 amRNSTjate Update - Replacement
29th Sep 20059:05 amRNSTjate Update
5th Sep 20057:01 amRNSMajor Discovery in Madagascar
19th Jul 200510:40 amRNSDrilling update from Tjate
28th Jun 200512:12 pmRNSHolding(s) in Company
21st Jun 200510:23 amRNSUpdate on Madagascar
19th May 20057:00 amRNSUpdate on drilling at Tjate
27th Apr 20057:00 amRNSDrill Results from Tjate
12th Apr 20052:48 pmRNSHolding(s) in Company
5th Apr 20057:00 amRNSPlacing Announcement
21st Mar 20057:01 amRNSInterim Results
10th Mar 20052:04 pmRNSDrilling Report
25th Feb 20057:00 amRNSExercise of Options
28th Jan 20057:00 amRNSMadagascar Update
6th Jan 20059:37 amRNSExploration Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.