Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Drilling Update

1 Mar 2013 07:00

RNS Number : 9863Y
Exillon Energy Plc
01 March 2013
 



Exillon Energy plc

Drilling Update

1 March 2013

1 March 2013 - Exillon Energy plc, a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

 

ETP V - 5001

Well ETP V - 5001 was spudded on 1st October 2012 and drilled and cemented in 126 days on the northern tip of the ETP V licence area. The well encountered Lower Silurian reservoir at 3,223 metres, confirming 22.8 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,204 metres, confirming 3.8 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 29.2 metres of effective net oil pay for production.

 

The well is structurally elevated by 26 - 46 metres above known oil in the ETP V field, which supports the Group's assertion that this well may have discovered a new oil field that extends into the North ETP VII licence, also owned by the Group.

 

Upon perforation, the well flowed water-free oil to the surface with a flow rate of 729 bbl/day from the Silurian reservoir. Core results illustrate that the reservoir is represented by fractured vugous porosity dolomites.

 

The well was drilled 1.1 km to the north-east of Pad 5, and is now connected to existing production facilities. The drilling rig has now spudded Well ETP IV - 5002 targeting the northern part of the ETP IV field.

 

ETP IV - 3000

Well ETP IV - 3000 was spudded on 1st September 2012 and drilled and cemented in 105 days on the southern part of the ETP IV field. The well encountered the Lower Silurian reservoir at 3,262 metres, confirming 12.5 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,237 metres, confirming 1.6 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 15.8 metres of effective net oil pay for production.

 

The well is currently flowing 567 bbl/day of fluid, of which 439 bbl/day is oil. The well is gradually increasing the oil flow rate as it cleans up the well bore from drilling mud and water used during completion.

 

The well was drilled 0.86 km south of Pad 1, and is now connected to our existing production facilities. Well logging and testing results support our geological understanding of the ETP IV field. This is the last well on the southern margin of the ETP IV field, and the drilling rig has now been demobilized.

 

Media contact:

Tom Blackwell

 

Email: Blackwell@mcomgroup.com  

Tel: +44 207 920 2330begin_of_the_skype_highlighting

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSISMFFDSEFD
Date   Source Headline
18th Jul 20184:35 pmRNSPrice Monitoring Extension
27th Jun 20183:15 pmRNS2018 AGM Results
26th Jun 20187:00 amRNSMay Production Report
26th Jun 20187:00 amRNSReport on Payments to Governments for 2017
29th May 20184:04 pmRNS2018 Annual General Meeting
24th May 20187:00 amRNSApril Production Report
23rd May 20181:43 pmRNSAppointment of new CEO
26th Apr 20183:20 pmRNS2017 Annual Report and Accounts
24th Apr 20187:00 amRNSMarch Production Report
3rd Apr 20187:00 amRNSFebruary Production Report
27th Feb 20187:00 amRNSJanuary Production Report
24th Jan 20185:03 pmRNSResolution of Management Board of WSE
16th Jan 20187:00 amRNSDecember Production Report
10th Jan 20187:00 amRNSApproval for delisting of Exillon shares from WSE
28th Dec 20177:01 amRNSNovember Production Report
15th Nov 20177:00 amRNSOctober Production Report
10th Oct 20177:00 amRNSSeptember Production Report
11th Sep 201711:48 amRNSTender Offer Results
11th Sep 20177:00 amRNSAugust Production Report
8th Sep 201712:07 pmRNSSecond Price Monitoring Extn
8th Sep 201712:02 pmRNSPrice Monitoring Extension
1st Sep 20172:32 pmRNSInterim results for the first six months of 2017
30th Aug 201712:46 pmRNS2017 EGM Results
15th Aug 20177:00 amRNSJuly Production Report
14th Aug 20173:02 pmRNS2017 Extraordinary General Meeting
9th Aug 20173:44 pmRNSRe. BoD resolution on delisting from WSE
19th Jul 20177:00 amRNSStatement on Bank Ugra
14th Jul 20176:19 pmRNSRe. Tender Offer for Exillon shares listed on WSE
11th Jul 20174:40 pmRNSSecond Price Monitoring Extn
11th Jul 20174:35 pmRNSPrice Monitoring Extension
7th Jul 20177:00 amRNSJune Production Report
26th Jun 20171:05 pmRNS2017 AGM Results
20th Jun 20177:00 amRNSMay Production Report
25th May 20171:05 pmRNSReport on Payments to Governments for 2016
24th May 20175:46 pmRNS2017 Annual General Meeting
12th May 20177:00 amRNSApril Production Report
26th Apr 20174:03 pmRNS2016 Annual Report and Accounts
11th Apr 20173:15 pmRNSLoan Facilities
11th Apr 20177:00 amRNSMarch Production Report
14th Mar 20177:00 amRNSFebruary Production Report
9th Feb 20177:00 amRNSJanuary Production Report
24th Jan 20177:00 amRNSDecember Production Report
6th Dec 20167:00 amRNSNovember Production Report
25th Nov 20167:00 amRNSOctober Production Report
14th Oct 20167:00 amRNSSeptember Production Report
9th Sep 20167:00 amRNSAugust Production Report
25th Aug 20163:12 pmRNSInterim results for the first six months of 2016
24th Aug 20167:00 amRNSJuly Production Report
6th Jul 20167:00 amRNSJune Production Report
30th Jun 20167:00 amRNSConsolidated report on payments to governments

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.