Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Drilling Update

1 Mar 2013 07:00

RNS Number : 9863Y
Exillon Energy Plc
01 March 2013
 



Exillon Energy plc

Drilling Update

1 March 2013

1 March 2013 - Exillon Energy plc, a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

 

ETP V - 5001

Well ETP V - 5001 was spudded on 1st October 2012 and drilled and cemented in 126 days on the northern tip of the ETP V licence area. The well encountered Lower Silurian reservoir at 3,223 metres, confirming 22.8 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,204 metres, confirming 3.8 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 29.2 metres of effective net oil pay for production.

 

The well is structurally elevated by 26 - 46 metres above known oil in the ETP V field, which supports the Group's assertion that this well may have discovered a new oil field that extends into the North ETP VII licence, also owned by the Group.

 

Upon perforation, the well flowed water-free oil to the surface with a flow rate of 729 bbl/day from the Silurian reservoir. Core results illustrate that the reservoir is represented by fractured vugous porosity dolomites.

 

The well was drilled 1.1 km to the north-east of Pad 5, and is now connected to existing production facilities. The drilling rig has now spudded Well ETP IV - 5002 targeting the northern part of the ETP IV field.

 

ETP IV - 3000

Well ETP IV - 3000 was spudded on 1st September 2012 and drilled and cemented in 105 days on the southern part of the ETP IV field. The well encountered the Lower Silurian reservoir at 3,262 metres, confirming 12.5 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,237 metres, confirming 1.6 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 15.8 metres of effective net oil pay for production.

 

The well is currently flowing 567 bbl/day of fluid, of which 439 bbl/day is oil. The well is gradually increasing the oil flow rate as it cleans up the well bore from drilling mud and water used during completion.

 

The well was drilled 0.86 km south of Pad 1, and is now connected to our existing production facilities. Well logging and testing results support our geological understanding of the ETP IV field. This is the last well on the southern margin of the ETP IV field, and the drilling rig has now been demobilized.

 

Media contact:

Tom Blackwell

 

Email: Blackwell@mcomgroup.com  

Tel: +44 207 920 2330begin_of_the_skype_highlighting

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSISMFFDSEFD
Date   Source Headline
10th Oct 201311:28 amRNSForm 8.5 (EPT/RI)
9th Oct 20131:39 pmRNSForm 8.3 - Exillon Energy PLC
9th Oct 201311:27 amRNSForm 8.5 (EPT/RI)
9th Oct 20137:00 amRNSInterim Management Statement and Drilling Update
8th Oct 20132:56 pmRNSForm 8.3 - Exillon Energy PLC
8th Oct 201312:30 pmRNSForm 8.3 - [Exillon Energy Plc]
8th Oct 201310:59 amRNSForm 8.5 (EPT/RI)
7th Oct 201312:24 pmRNSForm 8.3 - [Exillon Energy Plc]
7th Oct 201312:23 pmRNSForm 8.3 - Exillon Energy PLC
4th Oct 20134:31 pmRNSForm 8.3 - Exillon Energy PLC - REPLACEMENT
4th Oct 20131:05 pmRNSForm 8.3 - Exillon Energy PLC
4th Oct 201311:56 amRNSForm 8.5 (EPT/RI)
4th Oct 201311:02 amRNSForm 8.3 - [Exillon Energy Plc]
3rd Oct 201312:24 pmRNSForm 8.3 - [Exillon Energy Plc]
2nd Oct 20133:03 pmRNSForm 8.3 - [Exillon Energy Plc]
2nd Oct 20133:02 pmRNSForm 8.3 - [Exillon Energy Plc - Amendment]
2nd Oct 201311:47 amRNSForm 8.5 (EPT/RI)
1st Oct 20132:29 pmRNSForm 8.3 - [Exillon Energy plc]
1st Oct 201312:47 pmRNSForm 8.3 - Exillion Energy Plc
1st Oct 201311:36 amRNSForm 8.5 (EPT/RI)
30th Sep 201312:56 pmRNSForm 8.3 - [Exillon Energy Plc]
30th Sep 201312:01 pmRNSForm 8.3 - Exillion Energy Plc
30th Sep 201311:19 amRNSForm 8.5 (EPT/RI)
27th Sep 201311:28 amRNSForm 8.5 (EPT/RI)
27th Sep 20139:36 amRNSForm 8.3 - Exillon Energy Plc
26th Sep 20132:23 pmRNSForm 8.3 - Exillon Energy
26th Sep 201311:46 amRNSForm 8.3 - Exillon Energy Plc
25th Sep 20132:40 pmRNSForm 8.3 - Exillon Energy
24th Sep 201312:20 pmRNSForm 8.3 - Exillon Energy Plc
23rd Sep 20133:26 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
23rd Sep 20133:01 pmRNSForm 8.3 - Exillon Energy Plc
23rd Sep 201311:34 amRNSForm 8.3 - [Exillon Energy Plc]
23rd Sep 201311:25 amRNSForm 8.5 (EPT/RI)
20th Sep 201312:46 pmRNSForm 8.3 - Exillon Energy
20th Sep 201311:12 amRNSForm 8.5 (EPT/RI)
19th Sep 20135:30 pmRNSForm 8.5 (EPT/RI)
19th Sep 20133:02 pmRNSForm 8.3 - [offeree/offeror]-Exillon Energy Plc
19th Sep 20131:07 pmRNSForm 8.3 - Exillon Energy
19th Sep 20137:00 amRNSStatement regarding Exillon Energy
18th Sep 20133:04 pmRNSForm 8.3 - Exilion Energy Plc
18th Sep 201310:31 amRNSCommencement of Formal Sale Process
10th Sep 201312:40 pmRNSForm 8.3 -Exillon Energy Plc
6th Sep 20131:27 pmRNSForm 8.3 - Exillon Energy
6th Sep 20139:36 amRNSForm 8.3 - Exillon Energy Plc
5th Sep 20132:31 pmRNSForm 8.3 - EXILLON ENERGY PLC
4th Sep 20131:51 pmRNSForm 8.3 - EXILLON ENERGY PLC
4th Sep 201310:05 amRNSForm 8.3 - [Exillon Energy Plc]
30th Aug 20132:12 pmRNSForm 8.3 - EXILLON ENERGY PLC
30th Aug 20137:00 amRNSForm 8.3 - Exillon Energy Plc
29th Aug 20138:30 amRNSForm 8.3 - Exillon Energy Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.