Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Drilling Update

1 Mar 2013 07:00

RNS Number : 9863Y
Exillon Energy Plc
01 March 2013
 



Exillon Energy plc

Drilling Update

1 March 2013

1 March 2013 - Exillon Energy plc, a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

 

ETP V - 5001

Well ETP V - 5001 was spudded on 1st October 2012 and drilled and cemented in 126 days on the northern tip of the ETP V licence area. The well encountered Lower Silurian reservoir at 3,223 metres, confirming 22.8 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,204 metres, confirming 3.8 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 29.2 metres of effective net oil pay for production.

 

The well is structurally elevated by 26 - 46 metres above known oil in the ETP V field, which supports the Group's assertion that this well may have discovered a new oil field that extends into the North ETP VII licence, also owned by the Group.

 

Upon perforation, the well flowed water-free oil to the surface with a flow rate of 729 bbl/day from the Silurian reservoir. Core results illustrate that the reservoir is represented by fractured vugous porosity dolomites.

 

The well was drilled 1.1 km to the north-east of Pad 5, and is now connected to existing production facilities. The drilling rig has now spudded Well ETP IV - 5002 targeting the northern part of the ETP IV field.

 

ETP IV - 3000

Well ETP IV - 3000 was spudded on 1st September 2012 and drilled and cemented in 105 days on the southern part of the ETP IV field. The well encountered the Lower Silurian reservoir at 3,262 metres, confirming 12.5 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,237 metres, confirming 1.6 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 15.8 metres of effective net oil pay for production.

 

The well is currently flowing 567 bbl/day of fluid, of which 439 bbl/day is oil. The well is gradually increasing the oil flow rate as it cleans up the well bore from drilling mud and water used during completion.

 

The well was drilled 0.86 km south of Pad 1, and is now connected to our existing production facilities. Well logging and testing results support our geological understanding of the ETP IV field. This is the last well on the southern margin of the ETP IV field, and the drilling rig has now been demobilized.

 

Media contact:

Tom Blackwell

 

Email: Blackwell@mcomgroup.com  

Tel: +44 207 920 2330begin_of_the_skype_highlighting

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSISMFFDSEFD
Date   Source Headline
28th Aug 20139:37 amRNSForm 8.3 - Exillon Energy Plc
27th Aug 201311:01 amRNSExtension to deadline of Possible Offer
27th Aug 20137:11 amRNSInterim Results for 6M 2013
23rd Aug 20135:19 pmRNSForm 8.3 - Exillon Energy Plc
22nd Aug 201310:01 amRNSForm 8.3 - Exillon Energy Plc.
19th Aug 20133:21 pmRNSForm 8.3 - Exillon Energy Plc
16th Aug 20131:02 pmRNSForm 8.3 - Exillon Energy Plc
13th Aug 20137:00 amRNSCompany Opening Position Disclosure
13th Aug 20137:00 amRNSEmployee Benefit Trust Opening Position Disclosure
12th Aug 20134:08 pmBUSForm 8.3 - Exillon
12th Aug 201311:27 amRNSForm 8.3 - Exillon Energy Plc
12th Aug 20137:00 amRNSForm 8.3 - Exillon Energy Plc
9th Aug 20132:43 pmRNSForm 8.3 - EXILLON ENERGY PLC
9th Aug 20138:15 amRNSForm 8.3 - Exillon Energy plc
8th Aug 20133:29 pmRNSForm 8.3 - Exillon Energy Plc
8th Aug 20137:24 amRNSForm 8.3 - Exillon Energy Plc
1st Aug 20133:07 pmRNSForm 8.3 - Exillon Energy PLC
1st Aug 201311:22 amRNSForm 8.3 - Exillion Energy Plc
1st Aug 20139:45 amRNSForm 8.3 - Exillon Energy Plc
31st Jul 20133:20 pmRNSForm 8.3 - Exillon Energy Plc
31st Jul 20131:52 pmRNSForm 8.3 - [Exillon Energy Plc]
31st Jul 20131:25 pmRNSForm 8.3 - Exillon Energy Plc
31st Jul 201312:35 pmRNSForm 8.3 - Exillon Energy
31st Jul 201311:55 amRNSForm 8.3 - Exillon Energy plc
30th Jul 20132:51 pmRNSStatement re Poss Offer and Rule 2.10 Announcement
26th Jul 20137:00 amRNSTR-1: Notification of Major Interest in Shares
19th Jul 20135:32 pmRNSTR-1 Notification
18th Jul 20137:00 amRNSDrilling Update
8th Jul 20137:00 amRNSQuarterly Production Statement
26th Jun 20132:31 pmRNSAGM Results
13th Jun 20137:00 amRNSDrilling Update
4th Jun 20136:15 pmRNSTR-1: Notification of Major Interest in Shares
29th May 20137:00 amRNSAGM Notice
21st May 20137:00 amRNSHolding(s) in Company
23rd Apr 20137:00 amRNSInterim Management Statement
2nd Apr 20133:20 pmRNSReceipt of Ratings; Annual Report Publication
19th Mar 20132:29 pmRNSEGM Result
18th Mar 201312:43 pmRNSTR-1 Notification of major interest in shares
15th Mar 20137:00 amRNSReserve Update
13th Mar 201312:30 pmRNSRequisition Withdrawal
8th Mar 20137:00 amRNSPreliminary Unaudited Results for 2012
4th Mar 20133:00 pmRNSBOARD RESPONSE TO SHAREHOLDER REQUISITION
1st Mar 20137:00 amRNSDrilling Update
14th Feb 20137:00 amRNSPublication of circular
11th Feb 20137:00 amRNSTR:1 Notification of Major Interest In Shares
22nd Jan 20137:00 amRNSAppointment of Joint Broker
17th Jan 20137:00 amRNSTR-1: Notification of Major Interest in Shares
14th Jan 20135:51 pmRNSEGM Requisition
14th Jan 20137:00 amRNSReceipt of EGM Requisition
7th Jan 20137:00 amRNSDecember Production Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.