Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Drilling Update

1 Mar 2013 07:00

RNS Number : 9863Y
Exillon Energy Plc
01 March 2013
 



Exillon Energy plc

Drilling Update

1 March 2013

1 March 2013 - Exillon Energy plc, a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

 

ETP V - 5001

Well ETP V - 5001 was spudded on 1st October 2012 and drilled and cemented in 126 days on the northern tip of the ETP V licence area. The well encountered Lower Silurian reservoir at 3,223 metres, confirming 22.8 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,204 metres, confirming 3.8 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 29.2 metres of effective net oil pay for production.

 

The well is structurally elevated by 26 - 46 metres above known oil in the ETP V field, which supports the Group's assertion that this well may have discovered a new oil field that extends into the North ETP VII licence, also owned by the Group.

 

Upon perforation, the well flowed water-free oil to the surface with a flow rate of 729 bbl/day from the Silurian reservoir. Core results illustrate that the reservoir is represented by fractured vugous porosity dolomites.

 

The well was drilled 1.1 km to the north-east of Pad 5, and is now connected to existing production facilities. The drilling rig has now spudded Well ETP IV - 5002 targeting the northern part of the ETP IV field.

 

ETP IV - 3000

Well ETP IV - 3000 was spudded on 1st September 2012 and drilled and cemented in 105 days on the southern part of the ETP IV field. The well encountered the Lower Silurian reservoir at 3,262 metres, confirming 12.5 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,237 metres, confirming 1.6 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 15.8 metres of effective net oil pay for production.

 

The well is currently flowing 567 bbl/day of fluid, of which 439 bbl/day is oil. The well is gradually increasing the oil flow rate as it cleans up the well bore from drilling mud and water used during completion.

 

The well was drilled 0.86 km south of Pad 1, and is now connected to our existing production facilities. Well logging and testing results support our geological understanding of the ETP IV field. This is the last well on the southern margin of the ETP IV field, and the drilling rig has now been demobilized.

 

Media contact:

Tom Blackwell

 

Email: Blackwell@mcomgroup.com  

Tel: +44 207 920 2330begin_of_the_skype_highlighting

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSISMFFDSEFD
Date   Source Headline
6th Mar 20127:00 amRNSFebruary Production Report
13th Feb 20127:00 amRNSReserves Update and Capital Markets Day
7th Feb 20127:00 amRNSJanuary Production Report
6th Feb 20127:00 amRNSLoan Facility
18th Jan 20127:00 amRNSLicence Acquisition
16th Jan 20127:00 amRNSDecember Production Report
12th Dec 20117:10 amRNSNovember Production Report
5th Dec 20117:00 amRNSDrilling Update
1st Dec 20117:00 amRNSAppointment announcement
14th Nov 20117:00 amRNSOctober Production Report
2nd Nov 20117:00 amRNSDrilling Update
26th Oct 20117:01 amRNSInterim Management Statement and Drilling Update
6th Oct 20117:00 amRNSDrilling Update
30th Sep 201112:41 pmRNSNotification of Major Interest in Shares
27th Sep 20117:55 amRNSNotification of Major Interest in Shares
16th Sep 20117:00 amRNSDrilling Update
26th Aug 20117:00 amRNSInterim Results for 6M 2011 and Drilling Update
16th Aug 20112:20 pmRNSNotification of major interest in shares
22nd Jul 20112:00 pmRNSNotification of Transactions of Directors
8th Jul 20112:24 pmRNSTR-3 Notification of Transaction
29th Jun 20117:00 amRNSExploration Update
23rd Jun 20111:59 pmRNSTR-1: Notification of Major Interest
17th Jun 20113:41 pmRNSDirector/PDMR Shareholding
16th Jun 20113:53 pmRNSDirector/PDMR Shareholding
2nd Jun 20112:00 pmRNSAppointment of CEO
2nd Jun 20112:00 pmRNSAGM Statement
18th May 20117:00 amRNSDrilling Update
18th May 20117:00 amRNSInterim Management Statement
11th May 20117:00 amRNSWell Update
3rd May 20117:00 amRNSTotal Voting Rights
28th Apr 20117:00 amRNSExillon Energy Appoints New Chairman
27th Apr 20119:52 amRNSTR-1 Notification of Major Interest
21st Apr 20112:13 pmRNSAnnual Financial Report
18th Apr 20111:50 pmRNSEGM Results
4th Apr 20117:00 amRNSTR-1: Notification of Major Interest in Shares
1st Apr 201111:01 amRNSTR-1: Notification of Major Interest in Shares
31st Mar 201111:00 amRNSTR-1: Notification of Major Interest in Shares
30th Mar 20115:00 pmRNSNotice of EGM
29th Mar 20116:04 pmRNSPublication of Prospectus
29th Mar 20117:00 amRNSPlacement announcement
28th Mar 20114:56 pmRNSPlacing of New and Existing Ordinary Shares
28th Mar 20117:05 amRNSAppraisal update
22nd Mar 20117:11 amRNSDrilling Update
18th Mar 20117:02 amRNSPreliminary unaudited year end results for 2010
2nd Mar 201111:35 amRNSChange of Registered Address
14th Feb 20117:00 amRNSReserve and Production Update
7th Feb 20117:00 amRNSProduction update
21st Jan 20119:43 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Dec 20107:00 amRNSExillon Energy joins FTSE 250
6th Dec 20107:00 amRNSResults of the re-completion

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.