Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Drilling Update

1 Mar 2013 07:00

RNS Number : 9863Y
Exillon Energy Plc
01 March 2013
 



Exillon Energy plc

Drilling Update

1 March 2013

1 March 2013 - Exillon Energy plc, a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

 

ETP V - 5001

Well ETP V - 5001 was spudded on 1st October 2012 and drilled and cemented in 126 days on the northern tip of the ETP V licence area. The well encountered Lower Silurian reservoir at 3,223 metres, confirming 22.8 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,204 metres, confirming 3.8 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 29.2 metres of effective net oil pay for production.

 

The well is structurally elevated by 26 - 46 metres above known oil in the ETP V field, which supports the Group's assertion that this well may have discovered a new oil field that extends into the North ETP VII licence, also owned by the Group.

 

Upon perforation, the well flowed water-free oil to the surface with a flow rate of 729 bbl/day from the Silurian reservoir. Core results illustrate that the reservoir is represented by fractured vugous porosity dolomites.

 

The well was drilled 1.1 km to the north-east of Pad 5, and is now connected to existing production facilities. The drilling rig has now spudded Well ETP IV - 5002 targeting the northern part of the ETP IV field.

 

ETP IV - 3000

Well ETP IV - 3000 was spudded on 1st September 2012 and drilled and cemented in 105 days on the southern part of the ETP IV field. The well encountered the Lower Silurian reservoir at 3,262 metres, confirming 12.5 metres of absolute effective net oil pay within the Silurian reservoir. In addition, the well encountered Domanic reservoir at 3,237 metres, confirming 1.6 metres of absolute effective net oil pay. Due to the angled trajectory of the well bore, this well exposed 15.8 metres of effective net oil pay for production.

 

The well is currently flowing 567 bbl/day of fluid, of which 439 bbl/day is oil. The well is gradually increasing the oil flow rate as it cleans up the well bore from drilling mud and water used during completion.

 

The well was drilled 0.86 km south of Pad 1, and is now connected to our existing production facilities. Well logging and testing results support our geological understanding of the ETP IV field. This is the last well on the southern margin of the ETP IV field, and the drilling rig has now been demobilized.

 

Media contact:

Tom Blackwell

 

Email: Blackwell@mcomgroup.com  

Tel: +44 207 920 2330begin_of_the_skype_highlighting

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSISMFFDSEFD
Date   Source Headline
23rd Jun 20163:55 pmRNSAGM Results
21st Jun 20167:00 amRNSMay Production Report
24th May 20167:00 amRNSApril Production Report
23rd May 20163:09 pmRNS2016 Annual General Meeting
22nd Apr 20163:40 pmRNS2015 Annual Report and Accounts
6th Apr 20167:00 amRNSMarch Production Report
24th Mar 20162:00 pmRNSAppointment of new CEO
16th Mar 20167:00 amRNSFebruary Production Report
10th Mar 20164:41 pmRNSSecond Price Monitoring Extn
10th Mar 20164:35 pmRNSPrice Monitoring Extension
1st Mar 20167:00 amRNSReserves and Production Update
12th Feb 20164:40 pmRNSSecond Price Monitoring Extn
12th Feb 20164:35 pmRNSPrice Monitoring Extension
10th Feb 20167:00 amRNSJanuary Production Report
2nd Feb 20164:40 pmRNSSecond Price Monitoring Extn
2nd Feb 20164:35 pmRNSPrice Monitoring Extension
18th Jan 20167:00 amRNSDecember Production Report
7th Jan 20164:41 pmRNSSecond Price Monitoring Extn
7th Jan 20164:35 pmRNSPrice Monitoring Extension
10th Dec 20157:00 amRNSNovember Production Report
18th Nov 20157:00 amRNSOctober Production Report
26th Oct 20157:00 amRNSSeptember Production Report
6th Oct 20154:40 pmRNSSecond Price Monitoring Extn
6th Oct 20154:35 pmRNSPrice Monitoring Extension
14th Sep 20157:00 amRNSAugust Production Report
28th Aug 20151:14 pmRNSInterim results for the first six months of 2015
11th Aug 20157:00 amRNSJuly Production Report
22nd Jul 20157:00 amRNSJune Production Report
20th Jul 20157:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
17th Jul 20155:15 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
30th Jun 20154:35 pmRNSPrice Monitoring Extension
26th Jun 20151:30 pmRNSAGM Results
5th Jun 20157:00 amRNSMay Production Report
2nd Jun 20154:16 pmRNS2015 Annual General Meeting
13th May 20157:00 amRNSApril Production Report
30th Apr 20157:00 amRNS2014 Annual Report and Accounts
10th Apr 20157:00 amRNSMarch Production Report
16th Mar 20157:00 amRNSFebruary Production Report
26th Feb 20157:00 amRNSJanuary Production Report
12th Feb 20154:35 pmRNSPrice Monitoring Extension
10th Feb 20154:40 pmRNSSecond Price Monitoring Extn
10th Feb 20154:35 pmRNSPrice Monitoring Extension
22nd Jan 20157:00 amRNSDecember Production Report
14th Jan 20154:40 pmRNSSecond Price Monitoring Extn
14th Jan 20154:35 pmRNSPrice Monitoring Extension
24th Dec 201412:35 pmRNSPrice Monitoring Extension
22nd Dec 20144:40 pmRNSSecond Price Monitoring Extn
22nd Dec 20144:35 pmRNSPrice Monitoring Extension
11th Dec 20147:00 amRNSNovember Production Report
19th Nov 20147:00 amRNSOctober Production Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.