Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

Share Price Information for Europa Metals (EUZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.10 (9.091%)
Open: 1.15
High: 1.15
Low: 1.15
Prev. Close: 1.15
EUZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Assayed Drilling Results at Moonlight Iron Ore

28 Jun 2011 07:00

RNS Number : 1907J
Ferrum Crescent Ltd
28 June 2011
 



 

 

28 June 2011

 

Ferrum Crescent Limited

("Ferrum Crescent", the "Company" or the "Group")(ASX: FCR, AIM: FCR)

 

Assayed Drilling Results at the Moonlight Iron Ore Project, South Africa

 

Highlights

 

·; Final assay results received for the recently completed twelve reverse circulation ("RC") drill holes at the Moonlight Iron Ore Project, South Africa, which confirm iron mineralisation

o 12 hole drilling programme now complete

o Follows previous six mineralised holes (announced on 18 May 2011)

o Demonstrates excellent continuity of iron mineralisation

 

·; Significant intersections of iron mineralisation include*:

- 43m @ 35.26% Fe from 92m downhole in FCL092

- 16m @ 36.72% Fe from 134m downhole in FCL093

- 15m @ 32.34% Fe from 48m downhole in FCL0097

*Note - full details of assayed intercepts are shown in Table 1

·; Results for the 11 hole HQ diamond core remain on schedule to be complete by the end of June as part of the Company's ongoing metallurgical programme

o Developing a probable flow sheet for the upgrade of iron mineralisation to a product grade of suitable composition for the production of DRI pellets

 

·; Moonlight exploration designed to:

o Increase the tonnage and confidence of the existing JORC compliant resource of 74Mt Indicated and 225Mt Inferred category with 30% Fe grade

o Define metallurgical properties of both hematite and magnetite iron ore in order to develop a high grade DRI pellet production facility to supply domestic South African and international steel industry

o Complete comprehensive definitive feasibility study that remains on track for completion during early 2012

 

·; Moonlight contains a JORC compliant resource of 74Mt in the Indicated Resource category and 225Mt in the Inferred Resource category at a grade of 30% Fe

 

Ed Nealon, Executive Chairman, commented: "This phase of drill results demonstrates excellent continuity of iron mineralisation at our flagship Moonlight project in South Africa. We will work these assayed results into a new geological model and look to update the resource model during the third quarter of 2011. In addition, a comprehensive metallurgical programme is planned, directed at the development of a probable flow sheet for the upgrade of iron mineralisation to a product grade of suitable composition for the production of DRI pellets."

 

Ferrum Crescent today announces the results from the remaining six reverse circulation ("RC") drill holes at its Moonlight Iron Ore Project. These holes are part of a twelve hole programme, Figure 1, that was completed during March 2011 with visual iron mineralisation intersected in all holes.

 

In line with the first six holes, announced on 18 May 2011, intersections of iron mineralisation (hematite and magnetite) were considerably thicker than predicted by the current geological model in this area of the deposit.

 

Significant intersections of iron mineralisation for the remaining six RC holes include*:

- 43m @ 35.26% Fe from 92m downhole in FCL092

- 16m @ 36.72% Fe from 134m downhole in FCL093

- 15m @ 32.34% Fe from 48m downhole in FCL0097

*Note - full details of assayed intercepts are shown in Table 1.

 

Moonlight contains a current JORC compliant resource of 74Mt in the Indicated Resource category and 225Mt in the Inferred Resource category at a grade of 30% Fe.

 

The RC drilling was planned to provide additional information allowing refinement of the geological model in areas of sparse drilling. The results confirm confidence in the geological model and demonstrate excellent continuity of iron mineralisation. Planned holes were superimposed on the model and indicated that it was likely that the total of mineralised intersections in all holes would be 295m. The actual sum of mineralised intersections was 368m above a grade of 15% Fe. This provides the Company with a high level of confidence in the geological interpretation and hence continuity of iron mineralisation through the deposit.

 

A new geological model is being developed using the assay results from the current drilling. Ferrum expects that the updated resource model will be available during the third quarter of 2011.

 

 Core drilling

The 11 hole HQ diamond core programme was completed on 16 April 2011. As previously reported, assays of core samples remain on schedule to be complete by the end of June. Over 130 bulk density measurements have been taken on core to assist with tonnage estimates of ore and waste.

 

Metallurgical Testwork

 

The Company is in the process of confirming final details of a comprehensive metallurgical programme that will include comminution and beneficiation studies. The initial phase of this work will use core samples from the current drilling and be directed at the development of a probable flow sheet for the upgrade of iron mineralisation to a product grade of suitable composition for the production of DRI pellets. (Samples in bold type refer to updated results, the subject of this announcement).

 

 

 

Hole

East

(m)

North

(m)

Depth (m)

From

(m)

To

(m)

Interval

(m)

Fe%

SiO2%

AL2O3%

P2O5%

LOI

FCL087

-81226

-2572349

130

0

13

13

35.43

44.40

1.64

0.021

0.48

25

31

6

32.41

48.37

2.17

0.019

1.34

FCL088

-80424

-2571500

150

96

139

43

31.34

45.16

2.63

0.054

0.70

FCL089

-80425

-2571699

138

64

73

9

36.86

38.92

1.73

0.087

0.07

88

91

3

31.61

46.31

3.02

0.066

0.10

94

101

7

34.37

45.00

1.58

0.048

0.05

104

132

28

33.97

45.01

1.66

0.065

0.08

FCL090

-80423

-2571894

105

22

32

10

37.14

43.42

1.06

0.050

0.35

70

80

10

28.91

49.72

2.84

0.047

0.59

87

98

11

32.99

43.21

3.25

0.076

0.75

FCL091

-80221

-2571706

160

79

92

13

33.20

45.76

2.06

0.056

0.09

106

119

13

34.38

44.62

1.91

0.054

0.13

135

145

10

29.38

47.67

2.39

0.054

1.33

FCL092

-80223

-2571498

170

82

87

5

33.92

45.20

1.64

0.115

0.21

92

135

43

35.26

43.91

1.46

0.127

-0.66

139

160

21

28.21

50.16

2.83

0.099

0.26

FCL093

-80022

-2571602

166

86

99

13

31.79

45.29

2.75

0.12

0.03

108

113

5

32.89

44.14

1.90

0.17

0.30

134

150

16

36.72

41.31

1.56

0.14

-0.49

FCL094

-80027

-2571803

80

30

38

8

34.66

43.27

2.09

0.060

0.57

56

63

7

34.41

44.37

1.42

0.057

0.05

FCL095

-79825

-2571696

144

29

43

14

33.91

45.63

1.72

0.14

0.51

69

74

5

34.29

41.52

1.72

0.14

0.82

111

118

7

33.65

42.54

2.39

0.17

-0.53

FCL096

-79628

-2571756

105

76

95

19

27.13

49.93

3.15

0.11

0.31

FCL097

-79425

-2571804

95

38

43

5

27.06

50.80

3.54

0.108

2.84

48

63

15

32.34

46.40

2.12

0.15

0.79

FCL098

-79228

-2571801

95

67

76

9

30.70

47.56

2.31

0.127

0.08

 

Table 1: Intercepts of iron mineralisation greater than or equal to 5m in width

 

·; Drilling by reverse circulation using 5.25 inch face sampling hammer.

·; All holes drilled vertical.

·; Mineralisation has a generally flat dip to the north - intersection widths approximate the true width of the mineralisation

·; Samples are collected through a rig mounted cyclone over 1m intervals and geologically logged.

·; All samples are weighed as a check on recovery and representivity.

·; 1m sub samples for assay are split using a single stage Jones type riffle splitter.

·; Assays determined by Fusion XRF, LOI (loss on ignition) determined at 1000C0. Some samples show negative LOI results. This characteristic indicates that the weight increase arising from oxidation of Fe2+ to Fe3+ (FeO to Fe2O3) is higher than the weight loss caused by removing volatiles from the mineral structures.

·; Composite intervals have been determined with regard to geological description using a lower cut off grade of 15% Fe and a minimum composite length of 5m.

·; Appropriate quality control methods have been used including standards, blanks and field duplicates

·; Drill holes have been located using hand held GPS methods using the South African, Hartbeeshoek94 Lo29 WGS system.

 

Figure 1: Moonlight Iron Ore project - drill hole plan

 

Competent Person's Statement:

The information in this report is based on information compiled by Lindsay Cahill, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Cahill has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Cahill is a consultant to the mining industry. This report is issued with Mr Cahill's consent as to the form and context in which the exploration results appear.

 

 

Australia and Company enquiries

UK and press enquiries

Ferrum Crescent Limited

Ed Nealon T: +61 419 905 546

Executive Chairman

Robert Hair T: + 61 414 926 302

Company Secretary

Ocean Equities Limited (Broker)

Guy Wilkes T: +44 (0) 20 7786 4370

Ambrian Partners Limited (Nominated Adviser)

Richard Morrison T: +44 (0) 20 7634 4764

Jen Boorer T: +44 (0) 20 7634 4859

For more information on the Company visit

www.ferrumcrescent.com

Threadneedle Communications Limited

Laurence Read/Beth Harris T: +44 (0) 20 7653 9855

 

 

 

 

 

 

Notes to Editors

Ferrum Crescent Limited is an Australian company listed on the Australian Securities Exchange (ASX) and the AIM market of the London Stock Exchange.

The Company seeks to capitalise on the future demand for iron and steel worldwide by producing iron products in the Republic of South Africa, for both the domestic and the export markets. Ferrum Crescent will maximise the beneficiation of iron ore product locally in line with the objectives of the Mineral and Petroleum Resources Development Act 2002 (South Africa). During the recent global rush for iron ore resources, South Africa, a relatively under-developed market, has been largely overlooked, prompting Ferrum to identify and pursue opportunities in South Africa.

To that end, the Company has acquired a controlling interest in a South African company that holds the rights to significant iron ore deposits in South Africa. The Turquoise Moon Iron Project consists of two separate iron ore (magnetite) occurrences, the Moonlight Deposit and the De Loskop Prospect. The Moonlight Deposit consists of coarse-grained magnetite-quartz rocks that display the following features which set it apart from comparable magnetite deposits:

·; The ability to produce very high quality concentrates at a coarse grind size;

·; Exceptionally low level of detrimental elements in the concentrates;

·; Near surface mineralisation;

·; Low stripping ratios.

The mineralisation is close to surface and consequently represents a low stripping ratio target with consequential mining cost benefits. The contained iron within the maiden Indicated Resource is sufficient to exceed 20 years' production.

The Company also holds an interest in the De Loskop Prospect, which is located approximately 150k east of Moonlight and only 50km north of Polokwane, the regional service centre.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLXDLFLFQFEBBF
Date   Source Headline
30th Apr 20137:00 amRNSQuarterly Activities and Cashflow Report
3rd Apr 201312:30 pmRNSDirector/PDMR Shareholding
12th Mar 201312:00 pmRNSHalf Yearly Report
27th Feb 20137:00 amRNSProcess Engineering Agreement Signed With Danieli
8th Feb 20137:00 amRNSInfrastructure & Beneficiation Route Presentation
31st Jan 20139:00 amRNSQuarterly Activities and Cashflow Report
19th Dec 20128:01 amRNSDirector/PDMR Shareholding
19th Dec 20127:00 amRNSOperational Summary 2012
14th Dec 20127:00 amRNSIssue of Equity
30th Nov 20128:30 amRNSAGM Statement
27th Nov 20127:00 amRNSIssue of Equity
31st Oct 20127:00 amRNSQuarterly Activities and cash flow report
30th Oct 20127:00 amRNSNotice of AGM and Explanatory Memorandum
27th Sep 20127:00 amRNSFinal Results
26th Sep 20127:00 amRNSAeromagnetic Survey
16th Aug 20127:00 amRNSSubstantial shareholder notice
13th Aug 20127:00 amRNSSubstantial shareholder notice
8th Aug 20127:00 amRNSResults of General Meeting
2nd Aug 201210:00 amRNSSubstantial Shareholder Notice
30th Jul 20127:00 amRNSQuarterly Activities and Appendix 5B
20th Jul 20127:00 amRNSCancellation of Options
11th Jul 20127:00 amRNSMoonlight Iron Ore Project - Exploration Update
6th Jul 20127:00 amRNSNotice of General Meeting & Explanatory Memorandum
20th Jun 20129:00 amRNSReceipt of ASX Waiver
6th Jun 20127:00 amRNSMoonlight Iron Ore Project Mining Right Granted
16th May 20127:00 amRNSCompletion of JORC Compliant Resource Estimate
30th Apr 20127:00 amRNSQuarterly activities and cashflow report
30th Apr 20127:00 amRNSAppendix 5B
15th Mar 20128:30 amRNSInterim Results
24th Feb 20127:00 amRNSIssue of Shares
31st Jan 20127:00 amRNSQuarterly Activities and Cashflow Report
13th Jan 20127:00 amRNSAmendment to Constitution of the Company
15th Dec 20117:00 amRNSMoonlight Iron Ore Project Update, South Africa
7th Dec 20118:54 amRNSAmendment to Annual Report
25th Nov 201112:00 pmRNSResult of AGM
11th Nov 20117:00 amRNSListing on the Johannesburg Stock Exchange
10th Nov 201110:23 amRNSDirector/PDMR Shareholding
7th Nov 20113:20 pmRNSDirector/PDMR Shareholding
4th Nov 201110:47 amRNSAdmission to Johannesburg Stock Exchange
4th Nov 201110:12 amRNSAppointment of Finance Director
31st Oct 20117:00 amRNSQuarterly Activities and Cashflow Report
25th Oct 201110:33 amRNSNotice of AGM and Explanatory Memorandum
8th Sep 201112:30 pmRNSFinal Results
18th Aug 20117:00 amRNSTotal Voting Rights
29th Jul 20117:00 amRNSQuarterly Activities and Cashflow Report
13th Jul 20117:00 amRNSAppointment of Managing Director
28th Jun 20117:00 amRNSAssayed Drilling Results at Moonlight Iron Ore
22nd Jun 20117:00 amRNSOfftake Agreement - Duferco SA
20th May 20117:00 amRNSResignation of Company Secretary
20th May 20117:00 amRNSPresentation on website

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.