Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

CORRECTION: Sugarloaf Update

28 Feb 2011 08:48

RNS Number : 9550B
Empyrean Energy PLC
28 February 2011
 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

 

CORRECTION:Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

The Company makes the following amendments to its announcement released at 07:16 on 28 February 20119 under RNS Number : 9466B: Working Interest in the Direct Assets #1H well is 3%, not 10% as originally stated. All other details remain the same and the full wording of the corrected announcement is reproduced below:

 

 

28 February 2011

 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

 

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

 

Empyrean is pleased to provide the following update on operations at the Sugarloaf Project within the Sugarkane Gas & Condensate Field, Texas.

 

Production Data

The following wells have been on production for a period of 60 days and Empyrean is pleased to provide the market with an update on the produced volumes during that period:-

 

 

Working Interest

Total Gas Production (mmscf)

Total Condensate Production (bbls)

Average Daily Equivalent Oil Rate (boe/d)*

Urrutia #1H

3%

102.3

35,084

869

Kowalik #1R

10.2%

90.2

28,825

731

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

 

Remedial operations on Direct Assets #1H well were successful and the well commenced production on 27/01/11 on a restricted choke setting. Over the most recently reported 5 day period the well averaged the following production rates.

 

Working Interest

Average Daily Gas Production (mmscf/d)

Average Daily Condensate Production (bbls/d)

Average Daily Equivalent Oil Rate (boe/d)*

Direct Assets #1H

3%

1.48

479

726

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

Due to the length of time between the fracture stimulation of this well and it being unloaded to sales, some of the pressures created during the stimulation process had bled off into the formation; this is a likely explanation of the lower early production rates observed in this well.

 

 

Operations

 

Holman #1H (3% WI)

This well has been drilled and cased with a Total Depth of 17,570 ft. The fracture stimulation of this well commenced on the 24th February 2011 and Empyrean will update the market when stabilized flow has been achieved.

 

Jordan #1H (3% WI)

This well has been drilled and cased with a Total Depth of 16,472 ft. This well will be fracture stimulated in due course and Empyrean will update the market when stabilized flow has been achieved.

 

PMT #1H (1.11% WI)

This well location lies across the Sugarloaf and neighbouring Hilcorp operated AMIs in which Empyrean does not participate. As such Empyrean holds a blended working interest of 1.11% in this well. The well spudded on 14/2/11 and Empyrean will provide the market with an update once the drilling of this well has been completed.

 

Buehring #1H (3.0% WI)

Drilling operations commenced on the 18/02/11 and Empyrean will provide the market with an update once the drilling of this well has been completed.

 

 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

 

 

Contact:

 

Empyrean Energy Plc

Tom Kelly Tel: +618 9388 8041

 

Shore Capital & Corporate Limited

Anita Ghanekar Tel: +44 (0) 20 7408 4090

Edward Mansfield

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDMGZZRRZGMZG
Date   Source Headline
18th Aug 20069:17 amRNSDrilling Report
28th Jul 20061:30 pmRNSDrilling Report
20th Jul 20068:57 amRNSDrilling Report
5th Jul 20069:05 amRNSDrilling Update
8th Jun 20061:09 pmRNSOperations Update
7th Jun 20061:52 pmRNSDrilling Update
6th Jun 200611:04 amRNSNotice of AGM
1st Jun 200611:17 amRNSFinal Results
23rd May 20068:28 amRNSOperations Update
22nd May 20069:13 amRNSDrilling Timetable
16th May 20062:04 pmRNSDrilling Report
8th May 20069:58 amRNSDrilling Report
27th Apr 20068:23 amRNSDrilling Report
26th Apr 20063:25 pmRNSIssue of Equity
24th Apr 20067:01 amRNSHolding(s) in Company
18th Apr 20069:05 amRNSDrilling Report
13th Apr 20069:57 amRNSDrilling Report
6th Apr 20067:00 amRNSAcquisition
4th Apr 20064:50 pmRNSIssue of Equity
31st Mar 20068:52 amRNSDrilling Report
21st Mar 200611:27 amRNSDrilling Report
7th Mar 20065:08 pmRNSIssue of Equity
7th Mar 20067:57 amRNSDrilling Update
2nd Mar 20064:12 pmRNSIssue of Equity
27th Feb 20068:15 amRNSTesting update
20th Feb 20068:39 amRNSDrilling Report
16th Feb 20068:47 amRNSDrilling Update
14th Feb 20067:40 amRNSDrilling Report
31st Jan 20068:25 amRNSDrilling Update
17th Jan 200611:12 amRNSDrilling Update
13th Jan 20068:55 amRNSDrilling Report
30th Nov 20057:00 amRNSDrilling Report
21st Nov 200511:36 amRNSDrilling Report
26th Oct 20057:00 amRNSInterim Results
6th Oct 20059:33 amRNSStatement re New Project
30th Sep 20059:44 amRNSDrilling Report
27th Jul 200512:11 pmRNSAIM Admission

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.