Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

CORRECTION: Sugarloaf Update

28 Feb 2011 08:48

RNS Number : 9550B
Empyrean Energy PLC
28 February 2011
 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

 

CORRECTION:Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

The Company makes the following amendments to its announcement released at 07:16 on 28 February 20119 under RNS Number : 9466B: Working Interest in the Direct Assets #1H well is 3%, not 10% as originally stated. All other details remain the same and the full wording of the corrected announcement is reproduced below:

 

 

28 February 2011

 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

 

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

 

Empyrean is pleased to provide the following update on operations at the Sugarloaf Project within the Sugarkane Gas & Condensate Field, Texas.

 

Production Data

The following wells have been on production for a period of 60 days and Empyrean is pleased to provide the market with an update on the produced volumes during that period:-

 

 

Working Interest

Total Gas Production (mmscf)

Total Condensate Production (bbls)

Average Daily Equivalent Oil Rate (boe/d)*

Urrutia #1H

3%

102.3

35,084

869

Kowalik #1R

10.2%

90.2

28,825

731

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

 

Remedial operations on Direct Assets #1H well were successful and the well commenced production on 27/01/11 on a restricted choke setting. Over the most recently reported 5 day period the well averaged the following production rates.

 

Working Interest

Average Daily Gas Production (mmscf/d)

Average Daily Condensate Production (bbls/d)

Average Daily Equivalent Oil Rate (boe/d)*

Direct Assets #1H

3%

1.48

479

726

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

Due to the length of time between the fracture stimulation of this well and it being unloaded to sales, some of the pressures created during the stimulation process had bled off into the formation; this is a likely explanation of the lower early production rates observed in this well.

 

 

Operations

 

Holman #1H (3% WI)

This well has been drilled and cased with a Total Depth of 17,570 ft. The fracture stimulation of this well commenced on the 24th February 2011 and Empyrean will update the market when stabilized flow has been achieved.

 

Jordan #1H (3% WI)

This well has been drilled and cased with a Total Depth of 16,472 ft. This well will be fracture stimulated in due course and Empyrean will update the market when stabilized flow has been achieved.

 

PMT #1H (1.11% WI)

This well location lies across the Sugarloaf and neighbouring Hilcorp operated AMIs in which Empyrean does not participate. As such Empyrean holds a blended working interest of 1.11% in this well. The well spudded on 14/2/11 and Empyrean will provide the market with an update once the drilling of this well has been completed.

 

Buehring #1H (3.0% WI)

Drilling operations commenced on the 18/02/11 and Empyrean will provide the market with an update once the drilling of this well has been completed.

 

 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

 

 

Contact:

 

Empyrean Energy Plc

Tom Kelly Tel: +618 9388 8041

 

Shore Capital & Corporate Limited

Anita Ghanekar Tel: +44 (0) 20 7408 4090

Edward Mansfield

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDMGZZRRZGMZG
Date   Source Headline
9th Apr 201011:44 amRNSPlacing to raise ?1.5m announcement replacement
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA
15th Dec 20097:39 amRNSParticipation in 10% of Aquarius Prject, Texas
10th Dec 20097:41 amRNSParticipation in 10% of Hercules Prospect, Texas
4th Dec 20093:21 pmRNSInterim Results
19th Nov 20097:00 amRNSSugarloaf Block B Update
16th Nov 20097:00 amRNSDrilling Report
10th Nov 20097:00 amRNSDrilling Report
30th Oct 20099:44 amRNSHolding(s) in Company
28th Oct 200910:01 amRNSHolding(s) in Company
6th Oct 20097:17 amRNSSugarloaf Block B Work Program
1st Oct 20099:01 amRNSHolding(s) in Company
21st Sep 20097:51 amRNSFarm-out of Block B Sugarloaf
18th Sep 20097:53 amRNSUpdate Eagle Oil Pool Development Project
10th Sep 200910:22 amRNSHolding(s) in Company
3rd Sep 20097:47 amRNSRiverbend Project commencement of operations
1st Sep 200910:43 amRNSHolding(s) in Company
17th Aug 20098:14 amRNSRiverbend Project update
13th Jul 200910:32 amRNSExercise of Options
8th Jul 200911:30 amRNSHolding(s) in Company
3rd Jul 20092:16 pmRNSResult of AGM
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser and Broker
9th Jun 20099:59 amRNSHolding(s) in Company
8th Jun 20093:57 pmRNSNotice of AGM
4th Jun 20097:00 amRNSIssue of Equity
1st Jun 20098:19 amRNSPlacing of ?816,000, Farm-in to Riverbend Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.