Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.285
Bid: 0.27
Ask: 0.30
Change: -0.005 (-1.72%)
Spread: 0.03 (11.111%)
Open: 0.29
High: 0.31
Low: 0.285
Prev. Close: 0.29
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

FURTHER POSITIVE ASSAY RESULTS RECEIVED FROM ROCK CHIP SAMPLING AT SIERRA DE LAS MINAS GOLD PROJECT IN ARGENTINA

10 Feb 2014 11:20

ECR MINERALS plc

(“ECR Minerals”, “ECR” or the “Company”)

AIM: ECR

US OTC: MTGDY

FURTHER POSITIVE ASSAY RESULTS RECEIVED FROM ROCK CHIP SAMPLING AT SIERRA DE LAS MINAS GOLD PROJECT IN ARGENTINA

LONDON: 10 FEBRUARY 2014

ECR Minerals plc is pleased to announce further positive assay results from initial rock chip sampling in the southern portion of the Sierra de las Minas (“SLM”) gold project area during January 2014.

Assay results for all samples sent for analysis during January 2014 are disclosed in the table below (results for samples 1-8 previously disclosed).

Sample Type Weight Assay 1 Assay 2
Unit kg ppm Au g/t Au
MDL 0.01 0.005 0.9
1 Rock 4.20 0.662
2 Rock 3.45 >10 70.7
3 Rock 1.75 1.045
4 Rock 2.60 >10 67.9
5 Rock 4.45 >10 23.7
6 Rock 3.75 >10 272.9
7 Rock 2.80 >10 16.5
8 Rock 4.20 1.045
9 Rock 1.45 2.370
10 Rock 2.50 9.819

Samples 9 and 10 were rock chip samples of outcropping quartz vein material, as were samples 1-8. The location of each sample is shown on the map which may be viewed at:

http://www.ecrminerals.com/images/stories/project/argentina/Access%20Fig.%202.jpg

NB: for the purposes of this news release ppm Au and g/t Au can be considered equivalent.

For further details of the work programme which has generated the results disclosed in the table, please refer to the Company’s announcement of 6 February 2014.

Assay procedure

A secure chain of custody was maintained in the transport and storage of all samples, which were shipped to and assayed by Acme Analytical Laboratories in Santiago, Chile, an internationally accredited analytical laboratory. A quality control system using blanks, duplicates and standards is in use at the laboratory. With reference to the table above, the method of analysis for values in the column headed “Assay 1” was fire assay with AAS finish. The method of analysis for values in the column headed “Assay 2” was fire assay with gravimetric finish. A re-assay with gravimetric finish was carried out where results exceeded the upper detection limit for AAS finish (10 ppm Au).

Stephen Clayson, Chief Executive Officer of ECR, commented:

“The additional assay results announced today represent significant gold grades and are therefore encouraging, particularly as the samples were obtained from a different prospect area to those for which assay results were announced last week.

The SLM project area contains numerous gold prospects and current activities are aimed at prioritising those that are found in the southern part of the project area, where ECR’s wholly owned subsidiary Ochre Mining SA, which has 100% ownership of the SLM project, has carried out little previous exploration.

Reconnaissance mapping and sampling continues this month, and in due course further efforts can be focused on the most promising prospects. In line with the stated strategy for the SLM project, the prospects deemed most promising will be those that appear most likely to be suitable for early advancement to production, subject to further exploration success and to a positive economic evaluation being completed once all relevant factors are known.”

The contents of this announcement have been reviewed by Richard Watts B.Eng. Mining, Fellow of the South African Institute of Mining & Metallurgy, a director of the Company with more than 40 years of experience in the mining industry.

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold-silver project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district on the island of Luzon in the north of the Philippines, and benefits from an extensive historical dataset.

ECR has a 100% interest in the Sierra de las Minas gold project in La Rioja Province, Argentina, the exploration strategy for which is to delineate multiple high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR holds a substantial minority stake in THEMAC Resources Group Ltd (TSX-V: MAC), which is focused on the development of the Copper Flat copper-molybdenum-gold-silver porphyry project in New Mexico, USA.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010
Paul Johnson, Non-Executive Chairman
Stephen Clayson, Director & Chief Executive Officer

Email: info@ecrminerals.com

Website: www.ecrminerals.com

Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550
David Hart/James Thomas

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements.

Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), the Company disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

GLOSSARY

AAS: atomic absorption spectroscopy
Au: gold
g/t: grams per tonne
kg: kilogram
km: kilometre
m: metre
MDL: method detection limit
ppm: parts per million
t: tonne

Copyright Business Wire 2014

Date   Source Headline
26th Apr 20129:50 amRNSSuspension - ECR Minerals Plc
13th Apr 20127:00 amBUSDrilling Update
2nd Apr 20127:00 amBUSResult of AGM
30th Mar 20124:55 pmBUSDirectorate Change
30th Mar 20121:44 pmBUSTotal Voting Rights
27th Mar 20122:21 pmBUSDirector/PDMR Shareholding
27th Mar 20128:00 amBUSDrilling Commences at El Abra Gold Prospect in Argentina
27th Mar 20128:00 amBUSDirectorate Change
21st Mar 20127:00 amBUSTHEMAC Resources Announces Significant Increase in Copper Flat Project Design Milling Rate
15th Mar 20127:55 amBUSHolding(s) in Company
7th Mar 201210:32 amBUSFinal Results
6th Mar 201212:32 pmBUSChange of Registered Office
27th Feb 20124:42 pmBUSIssue of Equity
14th Feb 201211:26 amBUSHolding(s) in Company
7th Feb 20129:32 amBUSHighly Positive Results Received from Sierra De Las Minas Metallurgical Testwork
1st Feb 201210:58 amBUSCopper Flat Project Exceeds 1 Billion lbs Copper in Measured & Indicated Resources
31st Jan 20122:44 pmBUSTotal Voting Rights
26th Jan 20127:00 amBUSECR Minerals: A $9M Sale of South African Exploration Assets by West Wits Mining
20th Jan 20124:55 pmBUSIssue of Equity
11th Jan 20121:44 pmBUSHolding(s) in Company
6th Jan 20122:49 pmBUSHolding(s) in Company
4th Jan 201210:00 amBUSArgentina Project Update
30th Dec 201112:25 pmBUSTotal Voting Rights
23rd Dec 201111:53 amBUSHolding(s) in Company
20th Dec 20117:00 amBUSIncrease in Paniai Gold Shareholding & Financing Update
12th Dec 20112:14 pmBUSArgentina Gold Project Update
8th Dec 201112:33 pmBUSTHEMAC Resources Provides Further Results from 2011 Drilling at Copper Flat Project
7th Dec 201111:53 amBUSHolding(s) in Company
6th Dec 20114:04 pmBUSDirector/PDMR Shareholding
2nd Dec 20112:57 pmBUSArgentina Project Update
29th Nov 20114:23 pmBUSDirector/PDMR Shareholding
21st Nov 20117:00 amBUSTHEMAC Resources Provides Initial Results of 2011 Copper Flat Project Drilling Programme
15th Nov 20112:59 pmBUSHolding(s) in Company
8th Nov 201110:41 amBUSHolding(s) in Company
31st Oct 20113:00 pmBUSTotal Voting Rights
17th Oct 20114:13 pmBUSDirector/PDMR Shareholding
13th Oct 20114:07 pmBUSIssue of Equity
7th Oct 20117:00 amBUSThemac Resources Provides Copper Flat Project Update
3rd Oct 20117:41 amBUSUnchimé Iron Ore Project Update
23rd Sep 20117:00 amBUSAdditional High Grade Gold Assays from Sierra de las Minas Sampling
15th Sep 20117:00 amBUSArgentina Exploration Update
16th Aug 20113:28 pmBUSDirector/PDMR Shareholding
15th Aug 201111:00 amBUSUpdate
29th Jul 20112:53 pmBUSTotal Voting Rights
8th Jul 20115:07 pmBUSIssue of Equity
6th Jul 20115:00 pmBUSDirector/PDMR Shareholding
5th Jul 20117:00 amBUSUnchimé Iron Project, Argentina
30th Jun 201110:50 amBUSTotal Voting Rights
30th Jun 20117:00 amBUSHalf-yearly Report
24th Jun 20117:00 amBUSTHEMAC RESOURCES ANNOUNCES COMMENCEMENT OF COPPER FLAT DRILLING PROGRAMME

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.