Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.22    0.00 (0.00%)
Bid:
0.21
Ask:
0.23
Spread: 0.02 (9.524%)
Market Cap: £7.80m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Copper Flat Resource Estimate

25 May 2010 07:00

MERCATOR GOLD plc

("Mercator" or "the Company")

AIM: MCR

US OTC: MTGDY

NI43-101 Copper Flat Resource Estimate by SRK

London 25 May 2010

Mercator Gold plc, the diversified mineral development company, is pleased to announce that the Mineral Resources of the Copper Flat copper-molybdenum-gold-silver deposit located in New Mexico, USA have been estimated by SRK Consulting (US), Inc ("SRK") at 107 million short tons grading an average of 0.303% copper classified as Indicated Resources with an additional 46 million short tons grading an average of 0.240% copper classified as Inferred Resources. The resource is stated above a 0.12% copper cut-off and contained within a potentially economic open pit.

The Mineral Resources are reported in accordance with Canadian National Instrument 43-101 ("NI43-101") and have been estimated in conformity with the generally accepted Estimation of Mineral Resource and Mineral Reserves Best Practices guidelines of the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM").

The SRK Mineral Resource statement for the Copper Flat deposit is presented in Tables 1 and 2 below.

Patrick Harford, Managing Director of Mercator Gold plc, comments:

"We are highly encouraged by the results of the SRK resource estimate for the Copper Flat deposit, which is stated at a cut-off grade that reflects current expectations as to the likely cut-off grade of economic interest and which will underpin the preliminary assessment being completed by SRK in advance of the Copper Flat project's listing on the TSX Venture Exchange through the proposed transaction with THEMAC Resources Group Limited."

Resource Estimate

Table 1: SRK Mineral Resource Statement for the Copper Flat Copper Deposit(1), May 6, 2010

Resource Classification Quantity Grade Cu Contained Metal
(Mst) (%) Copper (M-lbs)
Indicated(2) 107 0.303 645
Inferred(2) 46 0.240 222

Table 2: SRK Mineral Resource Statement for the Copper Flat Copper Deposit(1), May 6, 2010 (Metric Units)

Resource Classification Quantity Grade Cu Contained Metal
(Mt) (%) Copper (kt)
Indicated(2) 97 0.303 294
Inferred(2) 42 0.240 100

Notes to Tables 1 and 2:

(1) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources estimated will be converted into Mineral Reserves. All figures have been rounded to reflect the relative accuracy of the estimates. The cut-off grades are based on metal price assumptions of US$3.50/lb of copper, and a metallurgical recovery of 90.9% for copper. Gold and silver were not used in the pit optimization.

(2) Reported at a cut-off grade of 0.12% copper contained within a potentially economic open pit.

The Mineral Resources are reported at a cut-off grade to reflect reasonable prospects for economic extraction, which were evaluated by designing a series of conceptual pit shells using the Lerchs-Grossman optimizing algorithm.

SRK considers that portions of the Copper Flat copper deposit are amenable for open pit mining, and has not considered underground mining methods for deeper portions of the deposit.

After review of several scenarios considering different metal prices, design criteria and operating cost assumptions, SRK assumed a copper price of US$3.50/lb; a metallurgical recovery of 90.9%; mining costs of US$1.72/short ton mined; processing and G&A costs of US$5.49/short ton processed; and slope angles of 45º in all areas.

SRK was provided a database of all available drill-hole and underground sampling data, comprising collar, survey, assay, and lithology information, on March 24, 2010. This database includes data from some 191 drill-holes accounting for 134,610ft (41,029m) of drilling/underground drifting. Of this total, some 129,014ft (39,324m) has non-zero values for total copper. Drilling was conducted during 1968-1973 by Inspiration Development, during 1974-1979 by Quintana Minerals and during the early 1990s by Gold Express Corporation. New Mexico Copper Corporation, a wholly owned subsidiary of Mercator, conducted a 7 diamond drill-hole program of confirmation drilling in 2009-2010.

Approximately 10% of the pulp and core duplicate pulps archived on site were re-assayed for copper, molybdenum, gold and silver at SRK's request. The re-assay data have been validated by SRK and SRK is of the opinion that the results show good reproducibility compared with the historic data provided, and that the data is suitable for use in resource estimation.

All raw assay data was composited into 30ft (9.144m) down-hole lengths. The composite length was selected to reflect the anticipated selective mining unit, with mining currently envisioned using a 30ft (9.144m) bench height.

In order to constrain grade estimation, grade polygons were constructed in 100ft spaced N-S sections using a nominal 0.12% Cu cut-off. Additional higher grade polygons were constructed using a nominal 0.3% Cu cut-off in order to better restrict a geologically continuous higher grade core of the deposit.

A regular celled block model of the deposit was created in Vulcan(™) software, based on a block size of 50ft x 50ft x 30ft (15.24m x 15.24m x 9.144m), which is considered appropriate with respect to the current drill-hole spacing as well as the selective mining unit size typical of the likely type and scale of operations. Block grades for copper were estimated by inverse distance weighting and all block grade estimates were made using length weighted composite drill-hole data.

The Mineral Resources of the Copper Flat deposit have been classified in accordance with the CIM Definition Standards for Mineral Resources and Mineral Reserves. Blocks in the model which have been estimated using a minimum of two drill-holes at maximum average block-composite separation distance of 185ft have been classified as Indicated Mineral Resources. Blocks in the model that do not meet the criteria for Indicated Mineral Resources but which are within a maximum average distance of 380ft from one or more drill-holes have been classified as Inferred Mineral Resources.

No resource estimate was conducted for the secondary metals of the Copper Flat deposit (molybdenum, gold and silver), which are of potential economic significance.

There are no known environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant factors which could materially affect the Mineral Resources estimated.

The resource estimate was completed by Jeffrey Volk, CPG, FAusIMM, an independent qualified person, as defined in NI43-101. The effective date of this resource estimate is May 6, 2010 and it is based on data received by SRK in March, 2010. Mr Volk consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

A comprehensive technical report will be produced by SRK within 45 days of the issue of this news release.

About the Copper Flat Project

The Copper Flat copper-molybdenum-gold-silver project, which is located in New Mexico, USA, is a former producing mine with substantial infrastructure still in place. New Mexico Copper Corporation ("NMCC"), a wholly owned subsidiary of Mercator, holds an exclusive option to acquire a 100% interest in the Copper Flat project.

Mercator has entered into a binding heads of agreement with the THEMAC Resources Group Limited ("THEMAC"), a company listed on the TSX Venture Exchange (ticker: MAC.H), in relation to the acquisition of NMCC by THEMAC ("the Transaction"), as announced on March 16, 2010.

As a result of the Transaction, Mercator will hold a substantial interest in THEMAC, and will therefore retain a very significant interest in the Copper Flat project's future development.

THEMAC and Mercator are working with SRK to complete a preliminary assessment (as defined in NI43-101) on the Copper Flat project. The availability of the preliminary assessment is a condition of completion of the Transaction.

About Mercator

Mercator is a diversified mineral development company dedicated to creating value for its shareholders through a process of finding value, adding value and realising value. Mercator has an experienced management team with expertise in the structuring and execution of value accretive transactions.

For further information please contact:

Mercator Gold plc

Michael Silver, Chairman Tel: +44 (0) 20 7929 1010
Patrick Harford, Managing Director Tel: +1 646 239 9087

Email: info@mercatorgold.com

Website: www.mercatorgold.com

Daniel Stewart & Company plc

Oliver Rigby Tel: + 44 (0) 20 7776 6550

Old Park Lane Capital plc

Forbes Cutler Tel: +44 (0) 20 7518 2603

Bankside Consultants Ltd

Simon Rothschild/Oliver Winters Tel: +44 (0) 20 7367 8888

Barry Kaplan Associates

Larry Kaplan Tel: +1 732 747 0702

Glossary

Canadian National Instrument 43-101 - a strict set of guidelines on how public companies may disclose scientific and technical information about mineral projects on bourses supervised by the Canadian Securities Administrators.

Cu - copper.

Cut-off grade - the grade used to separate ore and waste such that only material classified as ore will be treated in order to recover the economic metal or mineral of interest.

Deposit - a natural occurrence of mineral or mineral aggregate, in such quantity and quality to invite exploitation.

Estimate -

(verb) to judge or approximate the value, worth, or significance of; to determine the size, extent, or nature of;

(noun) an approximate calculation; a numerical value obtained from a statistical sample and assigned to a population parameter.

Inferred Mineral Resource - that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill-holes.

Indicated Mineral Resource - that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill-holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

kt - kilotonnes

Lbs - pounds.

Mineral Resource - a concentration or occurrence of natural, solid, inorganic, or fossilized organic material in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics, and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge.

Mineral Reserve - the economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a preliminary feasibility study. This study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Mineral Reserve includes diluting materials and allowances for losses that may occur when the material is mined.

M-lbs - million pounds.

Mst - million short tons.

Mt - million metric tonnes.

Preliminary feasibility study - a comprehensive study of the viability of a mineral project that has advanced to the stage where the mining method, in the case of underground mining, or the open pit configuration, in the case of an open pit, has been established and which, if an effective method of mineral processing has been determined includes a financial analysis based on reasonable assumptions of technical, engineering, operating, and economic factors and evaluation of other relevant factors which are sufficient for a qualified person, acting reasonably, to determine if all or part of the Mineral Resource may be classified as a Mineral Reserve.

Preliminary assessment - means a study that includes an economic analysis of the potential viability of mineral resources taken at an early stage of the project prior to the completion of a preliminary feasibility study.

Qualified person - means an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report; and is a member or licensee in good standing of a professional association.

t - metric tonne.

Copyright Business Wire 2010

Date   Source Headline
2nd Jun 20092:13 pmBUSHolding(s) in Company
29th May 200911:19 amBUSResults of General Meeting
14th May 20097:00 amBUSNOTICE OF GENERAL MEETING
30th Apr 200911:58 amBUSUpdate
30th Apr 200911:55 amBUSResult of AGM
7th Apr 20092:30 pmBUSAnnual Report and Accounts
7th Apr 20092:30 pmRNSRestoration - Mercator Gold plc
6th Apr 20094:04 pmBUSHalf-yearly Report
1st Apr 20093:00 pmBUSFinal Results
19th Dec 20082:37 pmRNSCorporate Update
14th Nov 200811:07 amRNSCorporate Update
13th Oct 20089:30 amRNSCorporate Update
9th Oct 200812:30 pmRNSStatement re. Suspension
9th Oct 200812:30 pmRNSSuspension - Mercator Gold Plc
25th Sep 20084:39 pmRNSHolding(s) in Company
25th Sep 200810:52 amRNSMining & Financing Update
24th Sep 20084:05 pmRNSHolding(s) in Company
23rd Sep 200810:57 amRNSNotifiable Interest
19th Aug 20084:59 pmRNSDirectorate Change
7th Aug 200811:45 amRNSQuarterly Update to 30 June 2
31st Jul 20087:00 amRNSInvestment Update - Silver Sw
29th Jul 20083:18 pmRNSDirectorate Change
17th Jul 20087:00 amRNSNew Resources at Euro and Bat
15th Jul 20083:51 pmRNSDirector/PDMR Shareholding
9th Jul 20083:21 pmRNSPlacing of Shares
1st Jul 20087:00 amRNSSilver Swan Group - Explorat
27th Jun 20087:00 amRNSHolding(s) in Company
26th Jun 20088:44 amRNSVehicle collision at Meekatha
15th May 200811:27 amRNSExploration Update
13th May 20083:02 pmRNSTermination of Talks
8th May 200812:00 pmPRNRule 8.3 - Mercator Gold Plc
2nd May 20088:49 amRNSQuarterly Update
25th Apr 20087:01 amRNSRe: Sale of Non-Core Assets
17th Apr 20084:12 pmRNSStmnt re Share Price Movement
31st Mar 20087:01 amRNSInterim Results
11th Mar 20087:00 amRNSHolding(s) in Company
26th Feb 200810:01 amRNSProduction Update
20th Feb 20084:14 pmRNSSale of Exploration Leases
18th Jan 200812:30 pmRNSIssue of Equity
3rd Jan 20084:20 pmRNSDirector/PDMR Shareholding
21st Dec 20074:15 pmRNSDirector/PDMR Shareholding
21st Dec 20073:47 pmRNSResult of AGM
12th Dec 20073:04 pmRNSAnnual Report and Accounts
29th Nov 20075:36 pmRNSHolding(s) in Company
29th Nov 20075:35 pmRNSHolding(s) in Company
22nd Nov 20073:49 pmRNSFinal Results
20th Nov 20073:57 pmRNSHolding(s) in Company
17th Oct 20074:08 pmRNSPlacing
16th Oct 20074:13 pmRNSHolding(s) in Company
5th Oct 20074:31 pmRNSIssue of Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.