SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
136.20    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.60 (0.441%)
Market Cap: £232.09m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

Q3 2018 Operations Update

4 Oct 2018 07:00

RNS Number : 9063C
Central Asia Metals PLC
04 October 2018
 

4 October 2018

 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company')

Q3 2018 Operations Update

Central Asia Metals plc (AIM: CAML) today provides a Q3 2018 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in Macedonia ('Sasa').

Highlights

- Kounrad

o Q3 2018 copper production, 3,938 tonnes

- Sasa

o Q3 2018 zinc in concentrate production, 5,742 tonnes

o Q3 2018 lead in concentrate production, 7,602 tonnes

- On track to meet 2018 production guidance

o Copper 13,000 to 14,000 tonnes

o Zinc in concentrate 21,000 to 23,000 tonnes

o Lead in concentrate 28,000 to 30,000 tonnes

- Shuak

o 2018 exploration programme approaching completion

 

CAML production summary

Metal production (tonnes)

Q3 2018

9m 2018

9m 2017

Copper

3,938

10,686

10,869

Zinc

5,742

16,762

16,237

Lead

7,602

21,988

22,444

*9m 2017 zinc and lead production pre-date CAML ownership

Nigel Robinson, Chief Executive Officer, commented:

"We have experienced a good quarter at both of our operations, with copper cathode output at Kounrad up by 2.5% when compared to Q3 2017, and improved zinc recoveries at Sasa. Our production figures confirm that we are on track to achieve 2018 guidance for all three of our metal products."

Kounrad

Kounrad Q3 2018 copper production of 3,938 tonnes brings output for the first nine months of 2018 to 10,686 tonnes. Total Kounrad copper production since operations commenced in 2012 is now 79,111 tonnes.

The total amount of copper recovered from the Western Dumps in the year to 30 September 2018 is 6,950 tonnes, equating to approximately 65% of the 10,686 tonnes plated.

Copper sales during Q3 2018 were 3,626 tonnes, bringing the total for the first nine months of the year to 9,670 tonnes.

Sasa

In Q3 2018, mined and processed ore were 206,406 tonnes and 206,014 tonnes respectively, bringing the total for the first nine months of 2018 to 597,338 tonnes of ore mined and 599,619 tonnes of ore processed. The average head grades for the Q3 2018 period were 3.25% zinc and 3.92% lead, and for the year to date were on average 3.31% and 3.91% respectively. Q3 metallurgical recoveries were 85.7% for zinc and 94.0% for lead. Zinc recoveries have increased during the period as the performance of the new stirred media detritor (SMD) mill that was installed in Q2 2018 has stabilised. Year to date recoveries for zinc and lead average at 84.5% and 93.7% respectively.

Sasa produces a zinc concentrate and a separate lead concentrate that contains silver. In Q3 2018, 11,658 tonnes of concentrate containing 49.3% zinc and 10,455 tonnes of concentrate containing 72.7% lead were produced. Total year to date production was 34,282 tonnes of zinc concentrate at an average grade of 48.9% and 30,167 tonnes of lead concentrate at an average grade of 72.9%.

Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q3 2018 payable production of zinc was 4,810 tonnes and of lead was 7,222 tonnes, bringing total payable production for the first nine months of 2018 to 14,020 tonnes of zinc and 20,888 tonnes of lead. Payable base metal in concentrate sales for the nine month period were 13,961 tonnes of zinc and 20,882 tonnes of lead.

During the first nine months of 2018, Sasa sold 278,103 ounces of payable silver. Due to an existing streaming agreement with Osisko Gold Royalties, CAML's silver production has been pre-sold.

 

Units

Q3 2018

Q2 2018

Q1 2018

9m 2018

9m 2017*

Ore mined

t

206,406

198,560

192,372

597,338

589,622

Plant feed

t

206,014

197,241

196,364

599,619

593,034

Zinc grade

%

3.25

3.36

3.32

3.31

3.20

Zinc recovery

%

85.7

83.1

84.6

84.5

85.7

Lead grade

%

3.92

3.98

3.83

3.91

4.00

Lead recovery

%

94.0

93.8

93.3

93.7

94.6

Zinc concentrate

t (dry)

11,658

11,239

11,385

34,282

32,783

- Grade

%

49.3

49.0

48.5

48.9

49.5

- Contained zinc

t

5,742

5,502

5,518

16,762

16,237

Lead concentrate

t (dry)

10,455

10,125

9,587

30,167

30,596

- Grade

%

72.7

72.7

73.2

72.9

73.4

- Contained lead

t

7,602

7,366

7,020

21,988

22,444

*9m 2017 Sasa production pre-dates CAML ownership

Shuak

Exploration activities continued during the quarter at Shuak, focussing primarily at the Kyzyl-Sor prospect. A total of 19,467 metres of core hydrotransport drilling has been undertaken and this programme has now concluded.

A 77 kilometre induced polarisation (IP) geophysical programme to identify sulphide mineralisation has been completed throughout the Shuak area.

Diamond drilling commenced in August 2018 and, to the end of Q3 2018, 3,815 metres have been drilled, with the programme expected to finish in October 2018. Representative metallurgical samples have been sent to a certified laboratory in Kazakhstan for analysis.

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nick Clarke, Chairman

 

Nigel Robinson, CEO

 

Gavin Ferrar, CFO

 

Louise Wrathall, Investor Relations

louise.wrathall@centralasiametals.com

 

 

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

 

James Bavister

 

David McKeown

 

 

 

Mirabaud Securities (Joint Broker)

Tel: +44 (0) 20 3167 7221

Peter Krens

 

 

 

Blytheweigh (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

 

Camilla Horsfall

 

Megan Ray

 

Note to editors:

 

Central Asia Metals, an AIM-listed UK company based in London, owns the Kounrad SX-EW copper project in central Kazakhstan and the Sasa zinc-lead mine in Macedonia. The Company also owns 80% of the Shuak copper exploration property in northern Kazakhstan. For further information, please visit www.centralasiametals.com.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDLLFVRIDLVIIT
Date   Source Headline
16th Mar 201511:43 amRNSNotice of Results
10th Feb 20154:40 pmRNSSecond Price Monitoring Extn
10th Feb 20154:35 pmRNSPrice Monitoring Extension
15th Jan 20157:30 amRNSTransaction in Own Shares
6th Jan 20157:00 amRNS2014 Production Update and 2015 Outlook
24th Dec 201410:58 amRNSTransaction in Own Shares
26th Nov 20147:30 amRNSDirector's Interest in Shares
24th Oct 201411:30 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARESi
22nd Oct 20146:09 pmRNSExercise of Options and Directors' Dealings
9th Oct 20147:00 amRNSGrant of Options
3rd Oct 20147:00 amRNSQ3 2014 Production Update
1st Oct 20147:00 amRNSDirector's Interest in Shares
25th Sep 20147:00 amRNSInterim Results for the 6 Months Ended 30 June 14
28th Aug 201412:25 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
31st Jul 201412:11 pmRNSExercise of Warrants
24th Jul 20147:00 amRNSAllotment and issue of shares
18th Jul 20146:14 pmRNSTransaction in Own Shares
17th Jul 20146:25 pmRNSExercise of Options and Transaction in Own Shares
2nd Jul 20144:36 pmRNSShare Pledge by a Director
2nd Jul 20147:00 amRNSQ2 2014 Production and Capacity Expansion Update
1st Jul 20147:00 amRNSExercise of Warrants
16th Jun 20141:47 pmRNSBoard Changes and Results of AGM
3rd Jun 201412:50 pmRNSGrant of Options
27th May 20146:06 pmRNSTR-1 NOTIFICATION OF MAJOR INTEREST IN SHARES
27th May 20146:06 pmRNSTR-1 Notification of Major Interest in Shares
27th May 201411:43 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
23rd May 20144:53 pmRNSTR:1- Notification of major interest in shares
23rd May 201412:01 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
20th May 20147:00 amRNSKounrad Transaction Completion and Expansion Plans
19th May 20144:03 pmRNSAnnual Report and Accounts 2013 and Notice of AGM
14th May 20145:20 pmRNSTR-1: Notification of Major Interest in Shares
16th Apr 20147:00 amRNS2013 Full Year Results
8th Apr 201410:30 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
2nd Apr 20147:00 amRNSNotice of Results
28th Mar 201412:57 pmRNSAward Win
28th Mar 201412:14 pmRNSKounrad Transaction Update
28th Mar 201410:43 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
10th Mar 20147:00 amRNSChange of Adviser
14th Feb 20145:33 pmRNSTransaction in Own Shares
13th Jan 20147:59 amRNSDirector's Interest in Shares
7th Jan 20147:00 amRNSProduction Update and Outlook
9th Dec 20133:48 pmRNSAppointment of Director
25th Nov 20137:00 amRNSStrategic Investment in Copper Bay Ltd
18th Nov 20135:04 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
8th Nov 20134:40 pmRNSSecond Price Monitoring Extn
8th Nov 20134:35 pmRNSPrice Monitoring Extension
31st Oct 20133:26 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
31st Oct 20137:00 amRNSDirector Shareholding
30th Oct 201310:09 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
29th Oct 20137:00 amRNSKounrad Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.