SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
136.20    2.60 (1.95%)
Bid:
136.00
Ask:
136.60
Spread: 0.60 (0.441%)
Market Cap: £232.09m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

Q3 2018 Operations Update

4 Oct 2018 07:00

RNS Number : 9063C
Central Asia Metals PLC
04 October 2018
 

4 October 2018

 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company')

Q3 2018 Operations Update

Central Asia Metals plc (AIM: CAML) today provides a Q3 2018 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in Macedonia ('Sasa').

Highlights

- Kounrad

o Q3 2018 copper production, 3,938 tonnes

- Sasa

o Q3 2018 zinc in concentrate production, 5,742 tonnes

o Q3 2018 lead in concentrate production, 7,602 tonnes

- On track to meet 2018 production guidance

o Copper 13,000 to 14,000 tonnes

o Zinc in concentrate 21,000 to 23,000 tonnes

o Lead in concentrate 28,000 to 30,000 tonnes

- Shuak

o 2018 exploration programme approaching completion

 

CAML production summary

Metal production (tonnes)

Q3 2018

9m 2018

9m 2017

Copper

3,938

10,686

10,869

Zinc

5,742

16,762

16,237

Lead

7,602

21,988

22,444

*9m 2017 zinc and lead production pre-date CAML ownership

Nigel Robinson, Chief Executive Officer, commented:

"We have experienced a good quarter at both of our operations, with copper cathode output at Kounrad up by 2.5% when compared to Q3 2017, and improved zinc recoveries at Sasa. Our production figures confirm that we are on track to achieve 2018 guidance for all three of our metal products."

Kounrad

Kounrad Q3 2018 copper production of 3,938 tonnes brings output for the first nine months of 2018 to 10,686 tonnes. Total Kounrad copper production since operations commenced in 2012 is now 79,111 tonnes.

The total amount of copper recovered from the Western Dumps in the year to 30 September 2018 is 6,950 tonnes, equating to approximately 65% of the 10,686 tonnes plated.

Copper sales during Q3 2018 were 3,626 tonnes, bringing the total for the first nine months of the year to 9,670 tonnes.

Sasa

In Q3 2018, mined and processed ore were 206,406 tonnes and 206,014 tonnes respectively, bringing the total for the first nine months of 2018 to 597,338 tonnes of ore mined and 599,619 tonnes of ore processed. The average head grades for the Q3 2018 period were 3.25% zinc and 3.92% lead, and for the year to date were on average 3.31% and 3.91% respectively. Q3 metallurgical recoveries were 85.7% for zinc and 94.0% for lead. Zinc recoveries have increased during the period as the performance of the new stirred media detritor (SMD) mill that was installed in Q2 2018 has stabilised. Year to date recoveries for zinc and lead average at 84.5% and 93.7% respectively.

Sasa produces a zinc concentrate and a separate lead concentrate that contains silver. In Q3 2018, 11,658 tonnes of concentrate containing 49.3% zinc and 10,455 tonnes of concentrate containing 72.7% lead were produced. Total year to date production was 34,282 tonnes of zinc concentrate at an average grade of 48.9% and 30,167 tonnes of lead concentrate at an average grade of 72.9%.

Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q3 2018 payable production of zinc was 4,810 tonnes and of lead was 7,222 tonnes, bringing total payable production for the first nine months of 2018 to 14,020 tonnes of zinc and 20,888 tonnes of lead. Payable base metal in concentrate sales for the nine month period were 13,961 tonnes of zinc and 20,882 tonnes of lead.

During the first nine months of 2018, Sasa sold 278,103 ounces of payable silver. Due to an existing streaming agreement with Osisko Gold Royalties, CAML's silver production has been pre-sold.

 

Units

Q3 2018

Q2 2018

Q1 2018

9m 2018

9m 2017*

Ore mined

t

206,406

198,560

192,372

597,338

589,622

Plant feed

t

206,014

197,241

196,364

599,619

593,034

Zinc grade

%

3.25

3.36

3.32

3.31

3.20

Zinc recovery

%

85.7

83.1

84.6

84.5

85.7

Lead grade

%

3.92

3.98

3.83

3.91

4.00

Lead recovery

%

94.0

93.8

93.3

93.7

94.6

Zinc concentrate

t (dry)

11,658

11,239

11,385

34,282

32,783

- Grade

%

49.3

49.0

48.5

48.9

49.5

- Contained zinc

t

5,742

5,502

5,518

16,762

16,237

Lead concentrate

t (dry)

10,455

10,125

9,587

30,167

30,596

- Grade

%

72.7

72.7

73.2

72.9

73.4

- Contained lead

t

7,602

7,366

7,020

21,988

22,444

*9m 2017 Sasa production pre-dates CAML ownership

Shuak

Exploration activities continued during the quarter at Shuak, focussing primarily at the Kyzyl-Sor prospect. A total of 19,467 metres of core hydrotransport drilling has been undertaken and this programme has now concluded.

A 77 kilometre induced polarisation (IP) geophysical programme to identify sulphide mineralisation has been completed throughout the Shuak area.

Diamond drilling commenced in August 2018 and, to the end of Q3 2018, 3,815 metres have been drilled, with the programme expected to finish in October 2018. Representative metallurgical samples have been sent to a certified laboratory in Kazakhstan for analysis.

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nick Clarke, Chairman

 

Nigel Robinson, CEO

 

Gavin Ferrar, CFO

 

Louise Wrathall, Investor Relations

louise.wrathall@centralasiametals.com

 

 

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

 

James Bavister

 

David McKeown

 

 

 

Mirabaud Securities (Joint Broker)

Tel: +44 (0) 20 3167 7221

Peter Krens

 

 

 

Blytheweigh (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

 

Camilla Horsfall

 

Megan Ray

 

Note to editors:

 

Central Asia Metals, an AIM-listed UK company based in London, owns the Kounrad SX-EW copper project in central Kazakhstan and the Sasa zinc-lead mine in Macedonia. The Company also owns 80% of the Shuak copper exploration property in northern Kazakhstan. For further information, please visit www.centralasiametals.com.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDLLFVRIDLVIIT
Date   Source Headline
11th Jun 20265:40 pmRNSTR-1: Form for notification of major holdings
10th Jun 20267:00 amRNSTrading Update and Outlook
9th Jun 20265:14 pmRNSTR-1: Notification of major holdings
9th Jun 20267:00 amRNSTR-1: Notification of major holdings
8th Jun 202612:25 pmRNSShare Purchase by a Director
2nd Jun 20269:36 amRNSTR-1: Notification of major holdings
2nd Jun 20267:06 amRNSProposed acquisition of Cygnus Metals Limited
29th May 20266:03 pmRNSTR-1: Notification of major holdings
20th May 202612:14 pmRNSTR-1: Notification of major holdings
19th May 20265:47 pmRNSTR-1: Notification of major holdings
18th May 20262:37 pmRNSResults of 2026 Annual General Meeting (AGM)
11th May 202612:03 pmRNSShare Premium Cancellation Effective
6th May 20266:00 pmRNSTR-1: Notification of major holdings
5th May 202610:59 amRNSTR-1: Notification of major holdings
1st May 20263:24 pmRNSTR-1: Notification of major holdings
30th Apr 202611:32 amRNSChange of registered office address
16th Apr 20267:00 amRNSQ1 2026 Operations Update
15th Apr 20269:17 amRNSAnnual Report and Accounts 2025 and Notice of AGM
15th Apr 20267:00 amRNSPublication of 2025 Sustainability Report
10th Apr 20261:14 pmRNSTR-1: Notification of major holdings
31st Mar 202612:49 pmRNSTotal Voting Rights
30th Mar 202611:40 amRNSResults of Extraordinary General Meeting
30th Mar 20268:28 amRNSTR-1: Notification of major holdings
19th Mar 20267:00 amRNS2025 Full-Year Results
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
10th Mar 20267:00 amRNSProposed Share Premium Cancellation and EGM Notice
5th Mar 20267:00 amRNSTransaction in Own Shares
4th Mar 20267:00 amRNSTransaction in Own Shares
3rd Mar 20267:00 amRNSSasa Mineral Resource and Ore Reserve Statement
3rd Mar 20267:00 amRNSNotice of Results
3rd Mar 20267:00 amRNSTransaction in Own Shares
2nd Mar 20267:00 amRNSTransaction in Own Shares
27th Feb 20265:43 pmRNSTotal Voting Rights
18th Feb 20267:00 amRNSTransaction in Own Shares
17th Feb 20267:00 amRNSTransaction in Own Shares
16th Feb 20267:00 amRNSTransaction in Own Shares
13th Feb 20267:00 amRNSTransaction in Own Shares
12th Feb 20267:00 amRNSTransaction in Own Shares
6th Feb 20265:04 pmRNSTR-1: Notification of major holdings
5th Feb 20267:00 amRNSTransaction in Own Shares
4th Feb 20267:00 amRNSTransaction in Own Shares
3rd Feb 20267:00 amRNSTransaction in Own Shares
2nd Feb 20267:00 amRNSTransaction in Own Shares
30th Jan 20265:46 pmRNSTotal Voting Rights
28th Jan 20267:00 amRNSTransaction in Own Shares
23rd Jan 20267:00 amRNSTransaction in Own Shares
22nd Jan 20267:00 amRNSTransaction in Own Shares
20th Jan 20267:00 amRNSTransaction in Own Shares
19th Jan 20267:00 amRNSTransaction in Own Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.