Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.095    -0.0075 (-7.32%)
Bid:
0.09
Ask:
0.10
Spread: 0.01 (11.111%)
Market Cap: £20.77m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Drilling Update

30 Mar 2007 14:01

Tanzania Gold PLC30 March 2007 30 March 2007 Tanzania Gold Plc ("Tanzania Gold") Drilling Update for the Mkurumu Project, Tanzania Highlights: •First phase drilling campaign completed within budget and timescale •Individual sample grades up to 2.82g/t gold returned in core drill samples •First phase drilling programme has significantly increased geological understanding of the project •Board remains highly confident in the Mkurumu gold project Tanzania Gold (TZG.L), the AIM listed exploration and development company, ispleased to announce the results of the first phase of the geological coredrilling of its Mkurumu joint venture gold project (PL 3048/2005), Tanga region,Tanzania. The Board believes that the Mkurumu deposit represents the firstdocumented occurrence of an exhalative gold deposit in Tanzania. The goldmineralization typical of this type of deposit is characterised by the bimodalnature of the gold distribution, consisting of a low-grade high tonnage primarygold component as well as the occurrence of multiple high-grade secondary goldveins. The main purpose of the first phase of drilling was to investigate thegeological model as outlined in the Competent Persons Report ("CPR") ofSeptember 2006, through the examination of the various geological quantities,including structure, lithologies and grades associated with the low-grade buthigh tonnage syngenetic strataform gold component of the deposit. The board ofTanzania Gold remains confident that the geological model outlined in the CPRhas to date been proven to be accurate. Twelve diamond drill holes (including one collar re-drill) resulting in a totalof 1,041m of core were drilled within the 43.35 sq/km licence area and along the10km strike extent of the deposit. Due to technical difficulties drill holeSEDD002 had to be re-drilled. All the holes intersected the gold mineralization.More than 10 per cent. of the total core drilled yielded an average grade of0.28g/t gold, with the highest value of 2.82g/t gold seen in 1.9 per cent. ofthe core drilled. The highest individual sample result obtained was 2.82g/t fromhole VUDD003 over a 1m sample length. Over 13 samples, an average calculatedgold concentration of 1.13g/t was recorded. The results of the Mobile Metal Ions (MMI) analyses as well as the preliminaryresults of the first phase of the high grade epigenetic gold mineralizationinvestigations are expected to be available in the second quarter of 2007. Chief Executive, Clive Sinclair-Poulton said, "I am delighted with the progress on the Mkurumu project and the fact that theCompetent Persons Report has to date been shown to be accurate. The first phasedrilling programme has significantly increased our geological understanding ofthe deposit and identified various high-grade secondary enriched gold veins. Weare excited about the next phase of the evaluation which will include additionaltrenching, MMI analyses, soil sampling and drilling. We remain highly confidentin the Mkurumu project and look forward to reporting further progress in thenear future." Mkurumu Project Drill Campaign Highlight Statistics: Hole No Depth From To Width (m) g/tAuMKDD001 140.0 41.50 42.00 0.50 0.76 78.43 82.00 3.57 0.30 80.53 81.34 0.81 0.75 91.37 97.22 5.85 0.20MKDD002 156.2 25.00 26.00 1.00 0.22 39.00 40.00 1.00 0.20 52.00 53.00 1.00 0.28 86.00 87.06 1.06 0.53 95.40 96.18 0.78 0.24 123.00 123.50 0.50 0.24 125.50 125.83 0.33 0.28 126.92 127.12 0.20 0.28SEDD001 85.9 15.00 15.50 0.50 0.37 57.20 59.90 2.70 0.47SEDD002 42.5 Re-drilled - therefore not assayedSEDD002B 113.3 15.40 15.84 0.44 0.98 43.40 45.00 1.60 0.34 80.00 81.00 1.00 0.35SEDD003 65.3 No significant intersection >0.19g/tAuSEDD004 89.3 No significant intersection >0.19g/tAuVUDD001 60.00 25.50 26.00 0.50 0.33VUDD002 78.1 56.90 57.70 0.80 0.29VUDD003 59.1 19.50 26.00 6.50 0.23 41.10 48.00 6.90 0.99 45.00 47.00 2.00 1.93 50.00 51.00 1.00 0.21VUDD004 77.8 3.00 4.40 1.40 0.22 36.40 42.85 6.45 0.60 39.50 40.00 0.50 1.96 55.83 56.48 0.65 0.24VUDD005 73.3 29.40 31.60 2.20 0.21 61.83 62.52 0.69 0.24 Brian Varndell has reviewed and approved the technical information containedwithin this press release in his capacity as a competent person, as requiredunder the AIM rules. Brian Varndell, Senior Geologist, is a Fellow of theAustralasian Institute of Mining and Metallurgy and co-author of the CPRpublished in September 2006. For further information, please contact: Clive Sinclair-Poulton, Chief ExecutiveTanzania Gold PlcTel: +353 (0) 85 739 2674Email: clive@tanzgold.com James HarrisStrand Partners LimitedTel: +44 (0) 20 7409 3494 Gary MiddletonSt Swithins PR LimitedTel: +44 (0) 20 7929 4391Email: gary@swithins.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st May 202612:14 pmRNSTotal Voting Rights
8th Apr 20267:00 amRNSHope & Gorob Project-New Mineral Resource Estimate
31st Mar 20267:00 amRNSFundraising, Directors' Dealing and TVR
30th Mar 20269:31 amRNSHope & Gorob Copper-Gold - Mine Development Update
30th Mar 20267:00 amRNSExercise of Warrants, Total Voting Rights
24th Mar 20261:24 pmRNSAdditional 20% interest in Hope and Gorob
11th Mar 202611:00 amRNSAppointment of mining and logistics contractor
11th Mar 202611:00 amRNSAppointment of mining and logistics contractor
10th Mar 20267:00 amRNSNLZM Mining Licence Renewed, Warrants Exercise TVR
10th Mar 20267:00 amRNSNLZM Mining Licence Renewed, Warrants Exercise TVR
3rd Mar 20262:11 pmRNSGrant of Options and Director/PDMR Shareholding
23rd Jan 202610:47 amRNSExercise of Warrants and TVR
14th Jan 202610:34 amRNSExercise of Warrants, Total Voting Rights
8th Jan 202610:53 amRNSExercise of Warrants, Total Voting Rights
29th Dec 20255:00 pmRNSDirector/PDMR Shareholding
29th Dec 20255:00 pmRNSDirector/PDMR Shareholding
24th Dec 20259:23 amRNSDirector/PDMR Shareholding
24th Dec 20259:23 amRNSDirector/PDMR Shareholding
17th Dec 20257:00 amRNSCompletion of NLZM Processing Plant Acquisition
8th Dec 20253:08 pmRNSResult of General Meeting
8th Dec 202510:23 amRNSExercise of Warrants, Total Voting Rights
4th Dec 20257:00 amRNSExercise of Warrants, Total Voting Rights
2nd Dec 202511:08 amRNS-RGeneral Meeting Presentation
19th Nov 20257:00 amRNSCircular re Proposed Acquisition and Notice of GM
12th Nov 202512:36 pmRNSHolding(s) in Company
6th Nov 20252:04 pmRNSExercise of Warrants and TVR
3rd Nov 20257:00 amRNSExercise of Warrants and Total Voting Rights
31st Oct 202512:37 pmRNSTotal Voting Rights
31st Oct 202511:37 amRNSPrepayment Facility and concentrate offtake agreed
30th Oct 20257:00 amRNSHope and Gorob Project Study Report
29th Oct 20252:39 pmRNSHope and Gorob Project Update
24th Oct 20257:00 amRNSExercise of Warrants, Total Voting Rights
16th Oct 20259:44 amRNSExercise of Warrants, Total Voting Rights
10th Oct 20259:01 amRNSBlackstone Investment - Mankayan Project Update
10th Oct 20257:00 amRNSExercise of Warrants, Total Voting Rights
2nd Oct 20259:21 amRNSHolding(s) in Company
2nd Oct 20257:00 amRNSUpdate on Blackstone Minerals Investment
30th Sep 20257:00 amRNSInterim Results for Six Months Ended 30 June 2025
17th Sep 202510:14 amRNSBlackstone Minerals - Mankayan Project Update
11th Sep 20251:03 pmRNSExercise of Warrants, Total Voting Rights
14th Aug 20257:00 amRNSProposed Acquisition of Processing Plant
29th Jul 20257:07 amRNSBlackstone Investment - Mankayan Project Update
25th Jul 202511:57 amRNSResult of AGM
14th Jul 202512:23 pmRNSBlackstone Investment - Mankayan Project Update
11th Jul 20252:46 pmRNSExercise of Warrants, Total Voting Rights
9th Jul 20252:50 pmRNSExercise of Warrants, Total Voting Rights
9th Jul 202511:14 amRNSMankayan Project Update
8th Jul 20258:03 amRNSHolding(s) in Company
2nd Jul 202511:08 amRNSMankayan Project Update
2nd Jul 20257:00 amRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.