Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.1025    0.0075 (7.89%)
Bid:
0.095
Ask:
0.11
Spread: 0.015 (15.789%)
Market Cap: £22.41m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Drilling Update

30 Mar 2007 14:01

Tanzania Gold PLC30 March 2007 30 March 2007 Tanzania Gold Plc ("Tanzania Gold") Drilling Update for the Mkurumu Project, Tanzania Highlights: •First phase drilling campaign completed within budget and timescale •Individual sample grades up to 2.82g/t gold returned in core drill samples •First phase drilling programme has significantly increased geological understanding of the project •Board remains highly confident in the Mkurumu gold project Tanzania Gold (TZG.L), the AIM listed exploration and development company, ispleased to announce the results of the first phase of the geological coredrilling of its Mkurumu joint venture gold project (PL 3048/2005), Tanga region,Tanzania. The Board believes that the Mkurumu deposit represents the firstdocumented occurrence of an exhalative gold deposit in Tanzania. The goldmineralization typical of this type of deposit is characterised by the bimodalnature of the gold distribution, consisting of a low-grade high tonnage primarygold component as well as the occurrence of multiple high-grade secondary goldveins. The main purpose of the first phase of drilling was to investigate thegeological model as outlined in the Competent Persons Report ("CPR") ofSeptember 2006, through the examination of the various geological quantities,including structure, lithologies and grades associated with the low-grade buthigh tonnage syngenetic strataform gold component of the deposit. The board ofTanzania Gold remains confident that the geological model outlined in the CPRhas to date been proven to be accurate. Twelve diamond drill holes (including one collar re-drill) resulting in a totalof 1,041m of core were drilled within the 43.35 sq/km licence area and along the10km strike extent of the deposit. Due to technical difficulties drill holeSEDD002 had to be re-drilled. All the holes intersected the gold mineralization.More than 10 per cent. of the total core drilled yielded an average grade of0.28g/t gold, with the highest value of 2.82g/t gold seen in 1.9 per cent. ofthe core drilled. The highest individual sample result obtained was 2.82g/t fromhole VUDD003 over a 1m sample length. Over 13 samples, an average calculatedgold concentration of 1.13g/t was recorded. The results of the Mobile Metal Ions (MMI) analyses as well as the preliminaryresults of the first phase of the high grade epigenetic gold mineralizationinvestigations are expected to be available in the second quarter of 2007. Chief Executive, Clive Sinclair-Poulton said, "I am delighted with the progress on the Mkurumu project and the fact that theCompetent Persons Report has to date been shown to be accurate. The first phasedrilling programme has significantly increased our geological understanding ofthe deposit and identified various high-grade secondary enriched gold veins. Weare excited about the next phase of the evaluation which will include additionaltrenching, MMI analyses, soil sampling and drilling. We remain highly confidentin the Mkurumu project and look forward to reporting further progress in thenear future." Mkurumu Project Drill Campaign Highlight Statistics: Hole No Depth From To Width (m) g/tAuMKDD001 140.0 41.50 42.00 0.50 0.76 78.43 82.00 3.57 0.30 80.53 81.34 0.81 0.75 91.37 97.22 5.85 0.20MKDD002 156.2 25.00 26.00 1.00 0.22 39.00 40.00 1.00 0.20 52.00 53.00 1.00 0.28 86.00 87.06 1.06 0.53 95.40 96.18 0.78 0.24 123.00 123.50 0.50 0.24 125.50 125.83 0.33 0.28 126.92 127.12 0.20 0.28SEDD001 85.9 15.00 15.50 0.50 0.37 57.20 59.90 2.70 0.47SEDD002 42.5 Re-drilled - therefore not assayedSEDD002B 113.3 15.40 15.84 0.44 0.98 43.40 45.00 1.60 0.34 80.00 81.00 1.00 0.35SEDD003 65.3 No significant intersection >0.19g/tAuSEDD004 89.3 No significant intersection >0.19g/tAuVUDD001 60.00 25.50 26.00 0.50 0.33VUDD002 78.1 56.90 57.70 0.80 0.29VUDD003 59.1 19.50 26.00 6.50 0.23 41.10 48.00 6.90 0.99 45.00 47.00 2.00 1.93 50.00 51.00 1.00 0.21VUDD004 77.8 3.00 4.40 1.40 0.22 36.40 42.85 6.45 0.60 39.50 40.00 0.50 1.96 55.83 56.48 0.65 0.24VUDD005 73.3 29.40 31.60 2.20 0.21 61.83 62.52 0.69 0.24 Brian Varndell has reviewed and approved the technical information containedwithin this press release in his capacity as a competent person, as requiredunder the AIM rules. Brian Varndell, Senior Geologist, is a Fellow of theAustralasian Institute of Mining and Metallurgy and co-author of the CPRpublished in September 2006. For further information, please contact: Clive Sinclair-Poulton, Chief ExecutiveTanzania Gold PlcTel: +353 (0) 85 739 2674Email: clive@tanzgold.com James HarrisStrand Partners LimitedTel: +44 (0) 20 7409 3494 Gary MiddletonSt Swithins PR LimitedTel: +44 (0) 20 7929 4391Email: gary@swithins.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Jun 20257:00 amRNSFinal Results
27th Jun 20259:18 amRNSMankayan Project - Blackstone Shares & Corporate
26th Jun 20253:21 pmRNSHolding(s) in Company
25th Jun 20257:00 amRNSHope & Gorob Award of Mining Licence
18th Jun 20258:21 amRNSUpdate - Blackstone & IDM Merger Becomes Effective
17th Jun 20254:14 pmRNSMankayan Project Update - Blackstone & IDM Merger
10th Jun 20252:49 pmRNSMankayan Project Update - Blackstone & IDM Merger
21st May 20257:00 amRNSCompletion of disposal of Eureka Project
19th May 20257:00 amRNSIssue of Equity and TVR
1st May 202512:00 pmRNSProposed sale of Eureka Project in Argentina
16th Apr 202511:01 amRNSHolding(s) in Company
16th Apr 20257:02 amRNSProposed sale of Eureka Project in Argentina
3rd Apr 20255:04 pmRNSAward of Environmental Clearance Certificate
3rd Apr 202511:50 amRNSMankayan Project Update
2nd Apr 202510:27 amRNSHope & Gorob Approval of ECC
18th Mar 20255:20 pmRNSDirector/PDMR Shareholding
5th Mar 20259:11 amRNSMankayan Project Update - Visible Gold Discovered
27th Feb 20257:00 amRNSFunding Facility Repayment Extension
25th Feb 20257:45 amRNSProposed sale of Eureka Project in Argentina
21st Feb 20259:31 amRNSHolding(s) in Company
18th Feb 202510:40 amRNSHolding(s) in Company
12th Feb 20257:00 amRNSHope & Gorob Ore Sorting Optimisation
6th Feb 20258:44 amRNSMankayan Project Update
30th Jan 20257:00 amRNSHope & Gorob Mine Planning Update
2nd Jan 20253:31 pmRNSReplacement: Fundraising, Directors' Holdings, TVR
27th Dec 20247:00 amRNSReplacement: Fundraising, Directors' Holdings, TVR
24th Dec 202412:21 pmRNSFundraising, Directors' holdings, Fee shares, TVR
15th Nov 202411:04 amRNSHope & Gorob Mine Planning Update
7th Nov 20247:00 amRNSHope & Gorob Optimisation & Geotechnical Drilling
1st Nov 202410:10 amRNSHope & Gorob Gold Contribution Review
1st Nov 20249:30 amRNSTotal Voting Rights
30th Oct 20247:00 amRNSPCB Gold Project Update, Zambia
29th Oct 20249:11 amRNSHolding(s) in Company
16th Oct 20247:00 amRNSRe Granting of Mining Licence for Hope & Gorob
2nd Oct 20243:31 pmRNSFundraising, Issue of Equity and TVR
30th Sep 20247:00 amRNSUnaudited Interim Results
26th Sep 20247:00 amRNSHope & Gorob Copper-Gold Project Permitting Update
28th Aug 20247:00 amRNSHope & Gorob Copper-Gold Project Permitting Update
27th Aug 20247:00 amRNSGeophysical Surveying at Kanye Manganese Project
19th Aug 202411:26 amRNSDirector's Dealings
8th Aug 20247:00 amRNSPlacing Issue of Shares PDMR Shareholdings REPLACE
6th Aug 20242:16 pmRNSDirector's Dealings
31st Jul 20242:13 pmRNSResult of AGM
24th Jul 20247:45 amRNSLOI re sustainable energy supply for Hope & Gorob
16th Jul 20244:00 pmRNSIssue of Shares and TVR
8th Jul 20245:48 pmRNSNotice of AGM
2nd Jul 20247:00 amRNSMankayan Project Investment Update
28th Jun 20247:00 amRNSFinal Results
13th Jun 20247:00 amRNSHope & Gorob Copper - Gold Project, Namibia Update
10th Jun 20247:00 amRNSCollaboration Agreement re Zambian gold project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.