Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.095    -0.0075 (-7.32%)
Bid:
0.09
Ask:
0.10
Spread: 0.01 (11.111%)
Market Cap: £20.77m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Drilling Update

30 Mar 2007 14:01

Tanzania Gold PLC30 March 2007 30 March 2007 Tanzania Gold Plc ("Tanzania Gold") Drilling Update for the Mkurumu Project, Tanzania Highlights: •First phase drilling campaign completed within budget and timescale •Individual sample grades up to 2.82g/t gold returned in core drill samples •First phase drilling programme has significantly increased geological understanding of the project •Board remains highly confident in the Mkurumu gold project Tanzania Gold (TZG.L), the AIM listed exploration and development company, ispleased to announce the results of the first phase of the geological coredrilling of its Mkurumu joint venture gold project (PL 3048/2005), Tanga region,Tanzania. The Board believes that the Mkurumu deposit represents the firstdocumented occurrence of an exhalative gold deposit in Tanzania. The goldmineralization typical of this type of deposit is characterised by the bimodalnature of the gold distribution, consisting of a low-grade high tonnage primarygold component as well as the occurrence of multiple high-grade secondary goldveins. The main purpose of the first phase of drilling was to investigate thegeological model as outlined in the Competent Persons Report ("CPR") ofSeptember 2006, through the examination of the various geological quantities,including structure, lithologies and grades associated with the low-grade buthigh tonnage syngenetic strataform gold component of the deposit. The board ofTanzania Gold remains confident that the geological model outlined in the CPRhas to date been proven to be accurate. Twelve diamond drill holes (including one collar re-drill) resulting in a totalof 1,041m of core were drilled within the 43.35 sq/km licence area and along the10km strike extent of the deposit. Due to technical difficulties drill holeSEDD002 had to be re-drilled. All the holes intersected the gold mineralization.More than 10 per cent. of the total core drilled yielded an average grade of0.28g/t gold, with the highest value of 2.82g/t gold seen in 1.9 per cent. ofthe core drilled. The highest individual sample result obtained was 2.82g/t fromhole VUDD003 over a 1m sample length. Over 13 samples, an average calculatedgold concentration of 1.13g/t was recorded. The results of the Mobile Metal Ions (MMI) analyses as well as the preliminaryresults of the first phase of the high grade epigenetic gold mineralizationinvestigations are expected to be available in the second quarter of 2007. Chief Executive, Clive Sinclair-Poulton said, "I am delighted with the progress on the Mkurumu project and the fact that theCompetent Persons Report has to date been shown to be accurate. The first phasedrilling programme has significantly increased our geological understanding ofthe deposit and identified various high-grade secondary enriched gold veins. Weare excited about the next phase of the evaluation which will include additionaltrenching, MMI analyses, soil sampling and drilling. We remain highly confidentin the Mkurumu project and look forward to reporting further progress in thenear future." Mkurumu Project Drill Campaign Highlight Statistics: Hole No Depth From To Width (m) g/tAuMKDD001 140.0 41.50 42.00 0.50 0.76 78.43 82.00 3.57 0.30 80.53 81.34 0.81 0.75 91.37 97.22 5.85 0.20MKDD002 156.2 25.00 26.00 1.00 0.22 39.00 40.00 1.00 0.20 52.00 53.00 1.00 0.28 86.00 87.06 1.06 0.53 95.40 96.18 0.78 0.24 123.00 123.50 0.50 0.24 125.50 125.83 0.33 0.28 126.92 127.12 0.20 0.28SEDD001 85.9 15.00 15.50 0.50 0.37 57.20 59.90 2.70 0.47SEDD002 42.5 Re-drilled - therefore not assayedSEDD002B 113.3 15.40 15.84 0.44 0.98 43.40 45.00 1.60 0.34 80.00 81.00 1.00 0.35SEDD003 65.3 No significant intersection >0.19g/tAuSEDD004 89.3 No significant intersection >0.19g/tAuVUDD001 60.00 25.50 26.00 0.50 0.33VUDD002 78.1 56.90 57.70 0.80 0.29VUDD003 59.1 19.50 26.00 6.50 0.23 41.10 48.00 6.90 0.99 45.00 47.00 2.00 1.93 50.00 51.00 1.00 0.21VUDD004 77.8 3.00 4.40 1.40 0.22 36.40 42.85 6.45 0.60 39.50 40.00 0.50 1.96 55.83 56.48 0.65 0.24VUDD005 73.3 29.40 31.60 2.20 0.21 61.83 62.52 0.69 0.24 Brian Varndell has reviewed and approved the technical information containedwithin this press release in his capacity as a competent person, as requiredunder the AIM rules. Brian Varndell, Senior Geologist, is a Fellow of theAustralasian Institute of Mining and Metallurgy and co-author of the CPRpublished in September 2006. For further information, please contact: Clive Sinclair-Poulton, Chief ExecutiveTanzania Gold PlcTel: +353 (0) 85 739 2674Email: clive@tanzgold.com James HarrisStrand Partners LimitedTel: +44 (0) 20 7409 3494 Gary MiddletonSt Swithins PR LimitedTel: +44 (0) 20 7929 4391Email: gary@swithins.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
6th Apr 20227:00 amRNSCyprus Joint Venture Update
22nd Mar 20227:00 amRNSUpdate on Kanye Manganese Project, Botswana
18th Mar 20227:00 amRNSMankayan Project MPSA renewal
16th Mar 20227:00 amRNSCyprus Joint Venture Update
16th Mar 20227:00 amRNSCyprus Joint Venture Update
15th Mar 20227:00 amRNSHope and Gorob Project Interim Drilling Update
7th Mar 20222:06 pmRNSSecond Price Monitoring Extn
7th Mar 20222:01 pmRNSPrice Monitoring Extension
24th Feb 20227:00 amRNSCyprus Joint Venture Update
24th Feb 20227:00 amRNSCyprus Joint Venture Update
8th Feb 20222:06 pmRNSSecond Price Monitoring Extn
8th Feb 20222:01 pmRNSPrice Monitoring Extension
7th Feb 20227:00 amRNSHope and Gorob Project Update
31st Jan 20227:00 amRNSUpdate on Kanye Manganese Project, Botswana
18th Jan 20227:00 amRNSCyprus Joint Venture Update
18th Jan 20227:00 amRNSCyprus Joint Venture Update
6th Jan 20229:00 amRNSDirector's dealings, issue of equity and TVR
29th Dec 202111:17 amRNSResult of General Meeting
23rd Dec 20214:41 pmRNSSecond Price Monitoring Extn
23rd Dec 20214:36 pmRNSPrice Monitoring Extension
23rd Dec 202112:06 pmRNSGeneral Meeting Update
23rd Dec 202111:00 amRNSPrice Monitoring Extension
15th Dec 20217:00 amRNSCaerus Mineral Resources Joint Venture Update
9th Dec 202112:16 pmRNSNotice of GM
30th Nov 20211:23 pmRNSTotal Voting Rights
30th Nov 20217:00 amRNSHope Cu-Au Project Update
29th Nov 20214:41 pmRNSSecond Price Monitoring Extn
29th Nov 20214:36 pmRNSPrice Monitoring Extension
29th Nov 20212:06 pmRNSSecond Price Monitoring Extn
29th Nov 20212:01 pmRNSPrice Monitoring Extension
29th Nov 202111:06 amRNSSecond Price Monitoring Extn
29th Nov 202111:01 amRNSPrice Monitoring Extension
23rd Nov 20217:00 amRNSFunding Facility
22nd Nov 20217:00 amRNSMankayan Project update
11th Nov 20217:00 amRNSJV Agreement with Caerus Mineral Resources PLC
10th Nov 202111:05 amRNSSecond Price Monitoring Extn
10th Nov 202111:00 amRNSPrice Monitoring Extension
4th Nov 202112:07 pmRNSHolding(s) in Company
26th Oct 202110:47 amRNSResult of AGM
22nd Oct 202111:35 amRNSAnnual General Meeting
21st Oct 20219:58 amRNS£1.2M Fundraise, TVR & update on Mankayan Project
19th Oct 20214:40 pmRNSSecond Price Monitoring Extn
19th Oct 20214:35 pmRNSPrice Monitoring Extension
19th Oct 20212:05 pmRNSSecond Price Monitoring Extn
19th Oct 20212:00 pmRNSPrice Monitoring Extension
4th Oct 20217:00 amRNSNotice of AGM
30th Sep 20217:00 amRNSInterim Results for Six Months Ended 30 June 2021
29th Sep 20217:00 amRNSHope Cu-Au Project Update
20th Sep 20217:00 amRNSUpdate on Minemba Prospect, Zambia
16th Sep 202112:15 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.