The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBase Resources Regulatory News (BSE)

Share Price Information for Base Resources (BSE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 14.50
Bid: 14.00
Ask: 14.50
Change: 0.00 (0.00%)
Spread: 0.50 (3.571%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 14.50
BSE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further supporting information for Bumamani PFS

3 Sep 2021 09:40

BASE RESOURCES LIMITED - Further supporting information for Bumamani PFS

BASE RESOURCES LIMITED - Further supporting information for Bumamani PFS

PR Newswire

London, September 3

AIM and Media Release 

3 September 2021

BASE RESOURCES LIMITEDFurther supporting information for Bumamani PFS

African mineral sands producer, Base Resources Limited (ASX & AIM: BSE) (Base Resources or the Company) provides the following further supporting information in respect of the outcomes of the Bumamani pre-feasibility study announced earlier today (Bumamani PFS).

Mining method

The mining method assumed for the Bumamani PFS was hydraulic mining, utilising Kwale Operations’ existing hydraulic mining units (HMUs). This mining method has been successfully used at Kwale Operations since 2017. It is non-selective, with hydraulic mining units using high pressure water jets to sluice the entire ore face, creating an ore slurry which can then be pumped to the wet concentrator plant.

Processing method

Material mined would be processed through Kwale Operations’ existing wet concentrator plant and mineral separation plant. Recovery factors assumed are the same as those currently experienced at Kwale Operations and are set out in the table below. This is supported by the metallurgical testwork carried out on the Kwale North Dune (which includes the P199 section the subject of the Bumamani PFS).

The metallurgical testwork comprised wet concentrator and mineral separation plant tests on bulk samples collected from two 61cm diameter holes drilled in the Kwale North Mineral Resource, as part of the earlier Kwale North pre-feasibility study1. One of the holes (KN091) was adjacent to the P199 section, which forms part of the Bumamani PFS. Discrete ore zones were sampled (Ore1, Ore4 and Ore5) from each hole. The samples were dried and shipped to Brisbane, Australia for processing through IHC Robbins’ laboratory. Samples of the fine tailings generated by IHC Robbins were sent to Outotec Metso for thickener testwork. The results of the testwork were not materially different to the run of mine results currently being achieved from mining the Kwale South Dune deposit. No metallurgical testwork was completed on the Bumamani deposit, however, it exhibits similar characteristics (including particle size) to ore currently mined at Kwale South Dune and is expected to achieve similar processing results, including mineral recoveries, as those achieved from mining the Kwale South Dune ore. With material from the Bumamani deposit and the P199 section to be mined and processed concurrently with the Kwale South Dune deposit, product recoveries similar to those currently achieved from mining Kwale South Dune ore were assumed for the Bumamani PFS.

DescriptionUnitsTestwork ResultBumamani PFS (consistent with current)
Concentrate grade%85.185
HM recovery – wet concentrator plant%83.079.5
Ilmenite recovery – wet concentrator plant%94.691.8
Rutile recovery – wet concentrator plant%94.891.2
Zircon recovery – wet concentrator plant%98.096.3
Ilmenite recovery – mineral separation plant%N/A100
Rutile recovery – mineral separation plant%N/A100.5
Zircon recovery – mineral separation plant%N/A84

[Note (1): For further information, refer to Base Resources’ market announcement on 1 April 2021 “Kwale North Dune PFS outcomes” available at https://baseresources.com.au/investors/announcements/.]

Mining schedule

Pursuant to the Bumamani PFS, four existing HMUs will be utilised instead of three (as is current mining practice at Kwale South Dune), two continuing to mine at Kwale South Dune and two at the pits the subject of the Bumamani PFS. After the transition to four HMUs, in both areas one HMU will operate at 800 tph and one at 400 tph to give a total feed rate of 2400 tph, consistent with the present feed rate at Kwale South Dune. HMUs are capable of mining at either 400 or 800 tph by operating either one or two high pressure monitors, each capable of 400 tph.

A shutdown of mining operations and the wet concentrator plant is scheduled for February 2023 to relocate HMUs and associated pumping infrastructure, after which mining at the Bumamani pit will commence. Following depletion of the Bumamani pit in July 2023, all mining equipment will relocate to P199 while mining continues at Kwale South Dune. A mine move at Kwale South Dune is scheduled for March 2024, during which mining operations will continue at the P199 section. During planned shuts for the relocation of mining operations, the feed rate of mining units that remain operational will be maximised.

For a chart summarising the mining schedule assumed for the Bumamani PFS, compared to the mine plan if the Bumamani Project does not proceed and figures depicting the planned HMU and tailings schedules for the Bumamani PFS, refer to the full PDF version of this announcement available from the Company’s website: https://baseresources.com.au/investors/announcements/.

ENDS.

For further information contact:

James Fuller, Manager Communications and Investor RelationsUK Media Relations
Base ResourcesTavistock Communications
Tel: +61 (8) 9413 7426Jos Simson and Gareth Tredway
Mobile: +61 (0) 488 093 763Tel: +44 (0) 207 920 3150
Email: jfuller@baseresources.com.au 

About Base Resources

Base Resources is an Australian based, African focused, mineral sands producer and developer with a track record of project delivery and operational performance. The company operates the established Kwale Operations in Kenya and is developing the Toliara Project in Madagascar. Base Resources is an ASX and AIM listed company. Further details about Base Resources are available at www.baseresources.com.au

PRINCIPAL & REGISTERED OFFICELevel 3, 46 Colin StreetWest Perth, Western Australia, 6005Email: info@baseresources.com.auPhone: +61 (0)8 9413 7400Fax: +61 (0)8 9322 8912

NOMINATED ADVISORRFC Ambrian LimitedStephen AllenPhone: +61 (0)8 9480 2500

JOINT BROKERBerenbergMatthew Armitt / Detlir EleziPhone: +44 20 3207 7800

JOINT BROKERCanaccord GenuityRaj Khatri / James Asensio / Patrick DolaghanPhone: +44 20 7523 8000 

Date   Source Headline
24th May 202410:33 amPRNNotice of change of interests by Substantial Shareholder
22nd May 20249:19 amPRNNotice of change of interests by Substantial Shareholder
15th May 202410:39 amPRNNotice of change of interests by Substantial Shareholder
30th Apr 20247:00 amPRNQuarterly Activities Report - March 2024
22nd Apr 202412:01 amPRNProposed combination with Energy Fuels to create global critical minerals business
11th Apr 20247:00 amPRNLTIP performance rights update
26th Feb 20247:00 amPRNFY24 half-year results
23rd Feb 20247:44 amPRNFY24 half-year results investor webcasts
30th Jan 20247:00 amPRNQuarterly Activities Report - December 2023
21st Dec 20237:00 amPRNModern Slavery Statement - period ended 30 June 2023
14th Dec 20237:00 amPRNAdditional critical mineral product stream doubles Toliara Project's NPV
24th Nov 20237:00 amPRNRetirement of Non-Executive Director
24th Nov 20237:00 amPRNResults of 2023 Annual General Meeting
24th Nov 20237:00 amPRN2023 AGM - Chair's Address and Management Presentation
21st Nov 20237:37 amPRN2023 Sustainability Report
17th Nov 20237:00 amPRNPresentation - TZMI Congress 2023
9th Nov 20239:56 amPRN2023 LTIP cycle performance rights
31st Oct 20237:00 amPRNQuarterly Activities Report - September 2023
30th Oct 20237:00 amPRNKwale Operations to complete mining at end of 2024
30th Oct 20237:00 amPRNKwale East - Exploration update
24th Oct 20237:00 amPRNNotice of 2023 Annual General Meeting
13th Oct 20237:18 amPRNLTIP performance rights update
15th Sep 20238:14 amPRN2023 Annual General Meeting details
13th Sep 20237:00 amPRNAmount of FY23 Final Dividend in GBP
7th Sep 20238:57 amPRNNotice of change of interests by Significant Shareholder
7th Sep 20238:21 amPRNAfrica Down Under Presentation
28th Aug 202312:01 amPRNFY23 results - Kwale continues to deliver strong financial performance
28th Aug 202312:01 amPRNFY23 Final Dividend - Key dates and information
23rd Aug 202311:23 amPRNFY23 full year investor webcasts - UK webcast date change
22nd Aug 20237:00 amPRNFY23 full year investor webcasts
11th Aug 20237:51 amPRN2023 Mineral Resources and Ore Reserves Statement
25th Jul 20237:22 amPRNQuarterly Activities Report - June 2023
3rd Jul 20237:00 amPRNKwale East exploration drilling update
26th Jun 20237:00 amPRNFY24 Production Guidance – Kwale Operations
2nd Jun 20237:00 amRNSChange of interests by Substantial Shareholder
28th Feb 20237:00 amPRNAppointment of Non-Executive Director
27th Feb 20237:00 amPRNFY23 Half Year Results
27th Feb 20237:00 amPRNFY23 Interim Dividend – Key dates and information
20th Feb 20237:00 amPRNFY23 half-year results investor webcasts
7th Feb 20237:00 amPRN121 Mining Investment Cape Town
24th Jan 20237:00 amPRNQuarterly Activities Report – December 2022
13th Jan 20238:25 amPRNNotice of change of interests by Significant Shareholder
11th Jan 20237:00 amPRNLTIP performance rights update
29th Dec 20229:25 amPRNNotice of change of interests by Significant Shareholder
22nd Dec 20227:00 amPRNNotice of change of interests by Significant Shareholder
21st Dec 20227:00 amPRNAcquisition of shares by Director
14th Dec 20229:10 amPRNLTIP performance rights update
14th Dec 20228:00 amPRNNotice of change of interests by Significant Shareholder
1st Apr 20228:12 amPRNFinal director’s interest and LTIP update
30th Mar 20227:00 amPRNChange of PDMR interests

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.