Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
8.50    3.00 (54.55%)
Bid:
7.00
Ask:
10.00
Spread: 3.00 (42.857%)
Market Cap: £5.50m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Conceptual Study Completed

24 Oct 2006 09:00

Beowulf Mining PLC24 October 2006 BEOWULF MINING PLC Independent Conceptual Study on Ruoutevare Iron Titanium Deposit in Northern Sweden London, 24 October 2006. Beowulf Mining PLC (AIM : BEM) the AIM quoted resourcecompany with iron, titanium, gold and copper projects in Sweden, is pleased toannounce that Raw Materials Group (RMG) of Sweden has completed a conceptualstudy of the Ruoutevare iron/titanium deposit. RMG suggest an extraction rate of10 million tonnes per annum as an economic production rate, requiring furthercost analysis work to be undertaken on ore transportation. RMG produced a simplified cash flow analysis for an eight year open pitextracting 10 million tons per year. This produced a positive study with a cashflow of just over US$50M per year from US$218 million per year of generatedrevenues, using various assumptions. (Full report is on www.beowulfmining.com ). Ruoutevare is 5 km outside the Sareks Nation Park, and careful attention to thelandscaping of the mine and associated facilities will be required. RMG suggestthis may cause a delay in permitting of the deposit. The study used current forecasts of revenues, capital costs and operationalcosts applied to a life of mine financial model. The Ruoutevare deposit is located in northern Sweden in the county ofNorrbotten, and is approximately 8 km NW of the small village of Kvikkjokk. Theproject is at an altitude of 610 meters above sea level and will require fortransport purposes a new 15 km road to be built from the site to Kvikkjokk. Hereit would link up with the existing 180 km road to Murjek and onward roadtransport or product reloading for rail shipment to the Gulf of Bothnia sea portof Lulea. The Swedish iron ore mining company LKAB is shipping out from Luleaannually some 4 Mt of magnetite concentrates and pellets to steel plants inFinland and Sweden. The deposit was originally discovered in the 18th Century. It was assessed bySveriges Geologiska Undersonkning (SGU) in the early 1970s during which timeground geophysics, metallurgical test work and detailed diamond drilling werecompleted. SGU determined a resource for the deposit of 116 Mt grading 38% ironand 5.6% titanium. This data was reviewed by Snowden Mining Industry ConsultantsLimited (Snowden) in 2006 for Beowulf and they reported a slightly highertonnage and a slightly lower grade. The mineralization occurs within outcropping shallowly dipping anorthosite asseveral separate tabular bodies in an area approx 1500m long and 200-300m wide.Snowden concluded that there are probably two lenses lying one above the other.Detailed geological mapping by Beowulf also found two over lying mineralisedlenses. Snowden and Beowulf both conclude that there is reason to believe thatthe resource estimates can be increased by additional drilling. The metallurgical test work was completed by LKAB and Rautaruukki during 1973and gives potential recoveries, using magnetic separation and flotation toproduce an iron ore concentrate and an ilmenite concentrate. The metallurgicalrecoveries are outlined below: Grade Recovery Ore feed to process plant 38% iron 5.6% titaniumMagnetite concentrate 65%iron 65%Ilmenite 44% titanium dioxide 45% A price FOB for magnetite concentrate is estimated to be US$52 per tonne and theprice FOB for ilmenite is estimated to be US$36 per tonne. The capital expenditure plus mine operation costs are not a major impact on whatwould be an open pit mine and are estimated to be 15% over the total eight yearmine life. Estimated costs are however relatively high mainly due to the cost oftransport and port handling charges. Commenting on the conceptual study, Dr. Jan Ola Larsson, Beowulf's SwedishManager, stated: "Initial indications on the economics of Ruoutevare are positive, but we need toaddress the transportation costs by negotiations with the State bodies inSweden. It is believed from geological studies that the tonnage of theRuoutevare reserves can be increased by additional drilling, thus extending themine life and reducing overall unit costs. Selective mining of the deposit canalso be achieved to increase cash flow in the early years of operation, as theSGU suggests that there is a 20 million tonne section grading 47% iron and 11%titanium oxide. Metallurgical testing work to improve the concentrate grade isongoing". For further information :- Dr. Robert Young, ChairmanBeowulf Mining plc Tel: +44-(0)1353 649 701 Gavin BurnellRuegg & Co. Limited Tel: +44-(0)207 584 3663 Nick BealerKing & Shaxson Tel: +44-(0)207 426 5986 Charles DampneyCity Capital Securities Limited Tel: +44-(0)207 822 7107 Gary MiddletonSt Swithin's Public Relations Tel: +44 (0) 207 429 4391 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Jun 202612:45 pmRNSProposed strategic investment from Bacchus Capital
29th May 20267:00 amRNSFinancial Results for Period Ended 31 March 2026
30th Apr 20267:00 amRNSTotal Voting Rights
27th Apr 20267:00 amRNSNordicPipe to proceed independently of EIT
27th Apr 20267:00 amRNSGrafintec Activities Update
24th Apr 202612:10 pmRNSUpdate on Financial Position
23rd Apr 20267:00 amRNSConversion of Loan Notes
20th Apr 20267:00 amRNS-RSwedish Government Support for Infrastructure
31st Mar 20267:00 amRNSUpdate on Financial Position & Total Voting Rights
25th Mar 20267:00 amRNSConversion of Loan Notes
18th Mar 20267:00 amRNSConsortium secure conditional €1.1m EIT funding
9th Mar 20267:00 amRNSConversion of Loan Notes
27th Feb 20267:00 amRNSTotal Voting Rights
27th Feb 20267:00 amRNSUnaudited Results for year ended 31 December 2025
24th Feb 20267:00 amRNSConversion of Loan Notes
6th Feb 20267:00 amRNSConversion of Loan Notes
30th Jan 20267:00 amRNSTotal Voting Rights & 2026 Financial Calendar
22nd Jan 20267:00 amRNSConversion of Loan Notes
21st Jan 20267:00 amRNSCorporate update
14th Jan 20267:00 amRNSConversion of Loan Notes
22nd Dec 20257:00 amRNSConvertible Loan and Corporate Adviser Appointment
28th Nov 20257:00 amRNSUnaudited Financial Results
26th Nov 20257:00 amRNSUpdate on financial position and funding strategy
1st Oct 20257:00 amRNSGrafintec Update
22nd Sep 20257:00 amRNSKallak Iron Ore Project Update
15th Sep 20257:00 amRNSTax Credit Application to support GAMP development
10th Sep 20258:55 amRNS-RUpdated Corporate Presentation
29th Aug 20257:00 amRNSUnaudited Results for Period Ended 30 June 2025
17th Jul 20257:00 amRNSGrant of Options
1st Jul 20259:06 amRNSGrafintec Secures GAMP Site Reservation in Kotka
25th Jun 20257:00 amRNS-RCEO Interview
24th Jun 20253:00 pmRNSResult of Annual General Meeting
19th Jun 20251:36 pmRNS-RSP Angel Research Note
10th Jun 20257:00 amRNS-RUpdated Corporate Presentation
4th Jun 20259:25 amRNS-RAlternative Resource Capital Research Note
30th May 20257:00 amRNSTotal Voting Rights and PDMR Shareholdings
29th May 20257:00 amRNSUnaudited Results for Period Ended 31 March 2025
23rd May 20257:00 amRNSFinancial Results for the year ended 31 Dec 2024
20th May 20257:00 amRNSLast day trading in Paid Subscribed SDRs and TVR
14th May 20257:05 amRNS-RGAMP PFS Delivers Outstanding Economics
14th May 20257:00 amRNS-RKallak Iron Ore Project Summary
8th May 20257:00 amRNSBeowulf announces outcome of Capital Raise
17th Apr 20257:00 amRNS-RInvestor Presentation and Q&A via IMC
16th Apr 20257:00 amRNSSubscription period in Rights Issue of SDRs begins
16th Apr 20257:00 amRNSWRAP Retail Offer for up to £738,000
16th Apr 20257:00 amRNSPublication of Prospectus
15th Apr 20257:00 amRNSStatement of Financial Position
8th Apr 202512:05 pmRNSResult of General Meeting
4th Apr 20257:00 amRNSBeowulf announces final terms of capital raise
2nd Apr 202510:30 amRNS-RBeowulf live investor Q&A

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.