Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
8.50    3.00 (54.55%)
Bid:
7.00
Ask:
10.00
Spread: 3.00 (42.857%)
Market Cap: £5.50m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Conceptual Study Completed

24 Oct 2006 09:00

Beowulf Mining PLC24 October 2006 BEOWULF MINING PLC Independent Conceptual Study on Ruoutevare Iron Titanium Deposit in Northern Sweden London, 24 October 2006. Beowulf Mining PLC (AIM : BEM) the AIM quoted resourcecompany with iron, titanium, gold and copper projects in Sweden, is pleased toannounce that Raw Materials Group (RMG) of Sweden has completed a conceptualstudy of the Ruoutevare iron/titanium deposit. RMG suggest an extraction rate of10 million tonnes per annum as an economic production rate, requiring furthercost analysis work to be undertaken on ore transportation. RMG produced a simplified cash flow analysis for an eight year open pitextracting 10 million tons per year. This produced a positive study with a cashflow of just over US$50M per year from US$218 million per year of generatedrevenues, using various assumptions. (Full report is on www.beowulfmining.com ). Ruoutevare is 5 km outside the Sareks Nation Park, and careful attention to thelandscaping of the mine and associated facilities will be required. RMG suggestthis may cause a delay in permitting of the deposit. The study used current forecasts of revenues, capital costs and operationalcosts applied to a life of mine financial model. The Ruoutevare deposit is located in northern Sweden in the county ofNorrbotten, and is approximately 8 km NW of the small village of Kvikkjokk. Theproject is at an altitude of 610 meters above sea level and will require fortransport purposes a new 15 km road to be built from the site to Kvikkjokk. Hereit would link up with the existing 180 km road to Murjek and onward roadtransport or product reloading for rail shipment to the Gulf of Bothnia sea portof Lulea. The Swedish iron ore mining company LKAB is shipping out from Luleaannually some 4 Mt of magnetite concentrates and pellets to steel plants inFinland and Sweden. The deposit was originally discovered in the 18th Century. It was assessed bySveriges Geologiska Undersonkning (SGU) in the early 1970s during which timeground geophysics, metallurgical test work and detailed diamond drilling werecompleted. SGU determined a resource for the deposit of 116 Mt grading 38% ironand 5.6% titanium. This data was reviewed by Snowden Mining Industry ConsultantsLimited (Snowden) in 2006 for Beowulf and they reported a slightly highertonnage and a slightly lower grade. The mineralization occurs within outcropping shallowly dipping anorthosite asseveral separate tabular bodies in an area approx 1500m long and 200-300m wide.Snowden concluded that there are probably two lenses lying one above the other.Detailed geological mapping by Beowulf also found two over lying mineralisedlenses. Snowden and Beowulf both conclude that there is reason to believe thatthe resource estimates can be increased by additional drilling. The metallurgical test work was completed by LKAB and Rautaruukki during 1973and gives potential recoveries, using magnetic separation and flotation toproduce an iron ore concentrate and an ilmenite concentrate. The metallurgicalrecoveries are outlined below: Grade Recovery Ore feed to process plant 38% iron 5.6% titaniumMagnetite concentrate 65%iron 65%Ilmenite 44% titanium dioxide 45% A price FOB for magnetite concentrate is estimated to be US$52 per tonne and theprice FOB for ilmenite is estimated to be US$36 per tonne. The capital expenditure plus mine operation costs are not a major impact on whatwould be an open pit mine and are estimated to be 15% over the total eight yearmine life. Estimated costs are however relatively high mainly due to the cost oftransport and port handling charges. Commenting on the conceptual study, Dr. Jan Ola Larsson, Beowulf's SwedishManager, stated: "Initial indications on the economics of Ruoutevare are positive, but we need toaddress the transportation costs by negotiations with the State bodies inSweden. It is believed from geological studies that the tonnage of theRuoutevare reserves can be increased by additional drilling, thus extending themine life and reducing overall unit costs. Selective mining of the deposit canalso be achieved to increase cash flow in the early years of operation, as theSGU suggests that there is a 20 million tonne section grading 47% iron and 11%titanium oxide. Metallurgical testing work to improve the concentrate grade isongoing". For further information :- Dr. Robert Young, ChairmanBeowulf Mining plc Tel: +44-(0)1353 649 701 Gavin BurnellRuegg & Co. Limited Tel: +44-(0)207 584 3663 Nick BealerKing & Shaxson Tel: +44-(0)207 426 5986 Charles DampneyCity Capital Securities Limited Tel: +44-(0)207 822 7107 Gary MiddletonSt Swithin's Public Relations Tel: +44 (0) 207 429 4391 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
14th Jan 202111:00 amRNSPrice Monitoring Extension
7th Jan 20217:00 amRNSShare Information
4th Jan 20217:00 amRNSTotal Voting Rights
21st Dec 20207:30 amRNSFully Subscribed Capital Raising
21st Dec 20207:00 amRNSResults of Open Offer and Capital Raising
17th Dec 20207:00 amRNSLetter to the Swedish Government
16th Dec 20203:00 pmRNSLast day of trading in Paid Subscribed SDRs
15th Dec 20202:06 pmRNSSecond Price Monitoring Extn
15th Dec 20202:01 pmRNSPrice Monitoring Extension
9th Dec 20202:00 pmRNSBeowulf SDR Rights Issue Oversubscribed
2nd Dec 20204:41 pmRNSSecond Price Monitoring Extn
2nd Dec 20204:35 pmRNSPrice Monitoring Extension
1st Dec 20204:40 pmRNSSecond Price Monitoring Extn
1st Dec 20204:35 pmRNSPrice Monitoring Extension
1st Dec 20207:00 amRNSGeophysical Anomaly Identified at Wolf Mountain
30th Nov 20204:41 pmRNSSecond Price Monitoring Extn
30th Nov 20204:37 pmRNSPrice Monitoring Extension
30th Nov 20202:06 pmRNSSecond Price Monitoring Extn
30th Nov 20202:01 pmRNSPrice Monitoring Extension
27th Nov 202010:50 amRNSKallak Update
26th Nov 20207:00 amRNSGeophysical Anomalies Identified at Viti Project
25th Nov 20204:22 pmRNSCEO Presentation
23rd Nov 20201:55 pmRNSCEO presentation
20th Nov 20202:06 pmRNSSecond Price Monitoring Extn
20th Nov 20202:01 pmRNSPrice Monitoring Extension
20th Nov 202011:00 amRNSPrice Monitoring Extension
20th Nov 20207:00 amRNSSubscription period in SDR Rights Issue begins
16th Nov 20201:40 pmRNSPublication of Prospectus
11th Nov 20207:00 amRNSCEO Presentation
10th Nov 20207:00 amRNSBoard Changes
9th Nov 20205:00 pmRNSDirector/PDMR Dealing
9th Nov 202011:00 amRNSCEO Presentation
6th Nov 20209:06 amRNSSecond Price Monitoring Extn
6th Nov 20209:00 amRNSPrice Monitoring Extension
6th Nov 20207:00 amRNSBeowulf launches a partially secured capital raise
5th Nov 20207:00 amRNSMajdan Peak Gold Target
2nd Nov 20207:00 amRNSMitrovica Drone Magnetic Survey Completed
30th Oct 20207:00 amRNSKallak Update
26th Oct 20207:00 amRNSResults for the Period Ended 30 September 2020
23rd Oct 20207:00 amRNSWolf Mountain Results Define High Priority Targets
16th Oct 20207:00 amRNSUpdated Presentation
15th Oct 20207:00 amRNSCEO Presentation
9th Oct 20206:12 pmRNSShare Price/Movement
17th Sep 20207:00 amRNSKallak Products – Market Leading Potential
10th Sep 202012:30 pmRNSResult of Annual General Meeting
1st Sep 20207:00 amRNSCEO Interview
28th Aug 20207:00 amRNSUnaudited Financial Results Ended 30 June 2020
25th Aug 20207:00 amRNSNotice of AGM and Availability of Annual Report
13th Aug 202012:35 pmRNSCEO Interview
13th Aug 20207:00 amRNSFinancing secured and £300,000 invested in Vardar

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.