Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
9.00    3.50 (63.64%)
Bid:
7.00
Ask:
11.00
Spread: 4.00 (57.143%)
Market Cap: £5.82m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Conceptual Study Completed

24 Oct 2006 09:00

Beowulf Mining PLC24 October 2006 BEOWULF MINING PLC Independent Conceptual Study on Ruoutevare Iron Titanium Deposit in Northern Sweden London, 24 October 2006. Beowulf Mining PLC (AIM : BEM) the AIM quoted resourcecompany with iron, titanium, gold and copper projects in Sweden, is pleased toannounce that Raw Materials Group (RMG) of Sweden has completed a conceptualstudy of the Ruoutevare iron/titanium deposit. RMG suggest an extraction rate of10 million tonnes per annum as an economic production rate, requiring furthercost analysis work to be undertaken on ore transportation. RMG produced a simplified cash flow analysis for an eight year open pitextracting 10 million tons per year. This produced a positive study with a cashflow of just over US$50M per year from US$218 million per year of generatedrevenues, using various assumptions. (Full report is on www.beowulfmining.com ). Ruoutevare is 5 km outside the Sareks Nation Park, and careful attention to thelandscaping of the mine and associated facilities will be required. RMG suggestthis may cause a delay in permitting of the deposit. The study used current forecasts of revenues, capital costs and operationalcosts applied to a life of mine financial model. The Ruoutevare deposit is located in northern Sweden in the county ofNorrbotten, and is approximately 8 km NW of the small village of Kvikkjokk. Theproject is at an altitude of 610 meters above sea level and will require fortransport purposes a new 15 km road to be built from the site to Kvikkjokk. Hereit would link up with the existing 180 km road to Murjek and onward roadtransport or product reloading for rail shipment to the Gulf of Bothnia sea portof Lulea. The Swedish iron ore mining company LKAB is shipping out from Luleaannually some 4 Mt of magnetite concentrates and pellets to steel plants inFinland and Sweden. The deposit was originally discovered in the 18th Century. It was assessed bySveriges Geologiska Undersonkning (SGU) in the early 1970s during which timeground geophysics, metallurgical test work and detailed diamond drilling werecompleted. SGU determined a resource for the deposit of 116 Mt grading 38% ironand 5.6% titanium. This data was reviewed by Snowden Mining Industry ConsultantsLimited (Snowden) in 2006 for Beowulf and they reported a slightly highertonnage and a slightly lower grade. The mineralization occurs within outcropping shallowly dipping anorthosite asseveral separate tabular bodies in an area approx 1500m long and 200-300m wide.Snowden concluded that there are probably two lenses lying one above the other.Detailed geological mapping by Beowulf also found two over lying mineralisedlenses. Snowden and Beowulf both conclude that there is reason to believe thatthe resource estimates can be increased by additional drilling. The metallurgical test work was completed by LKAB and Rautaruukki during 1973and gives potential recoveries, using magnetic separation and flotation toproduce an iron ore concentrate and an ilmenite concentrate. The metallurgicalrecoveries are outlined below: Grade Recovery Ore feed to process plant 38% iron 5.6% titaniumMagnetite concentrate 65%iron 65%Ilmenite 44% titanium dioxide 45% A price FOB for magnetite concentrate is estimated to be US$52 per tonne and theprice FOB for ilmenite is estimated to be US$36 per tonne. The capital expenditure plus mine operation costs are not a major impact on whatwould be an open pit mine and are estimated to be 15% over the total eight yearmine life. Estimated costs are however relatively high mainly due to the cost oftransport and port handling charges. Commenting on the conceptual study, Dr. Jan Ola Larsson, Beowulf's SwedishManager, stated: "Initial indications on the economics of Ruoutevare are positive, but we need toaddress the transportation costs by negotiations with the State bodies inSweden. It is believed from geological studies that the tonnage of theRuoutevare reserves can be increased by additional drilling, thus extending themine life and reducing overall unit costs. Selective mining of the deposit canalso be achieved to increase cash flow in the early years of operation, as theSGU suggests that there is a 20 million tonne section grading 47% iron and 11%titanium oxide. Metallurgical testing work to improve the concentrate grade isongoing". For further information :- Dr. Robert Young, ChairmanBeowulf Mining plc Tel: +44-(0)1353 649 701 Gavin BurnellRuegg & Co. Limited Tel: +44-(0)207 584 3663 Nick BealerKing & Shaxson Tel: +44-(0)207 426 5986 Charles DampneyCity Capital Securities Limited Tel: +44-(0)207 822 7107 Gary MiddletonSt Swithin's Public Relations Tel: +44 (0) 207 429 4391 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Jul 20207:00 amRNSRESULTS FOR THE YEAR ENDED 31 DECEMBER 2019
14th Jul 20201:30 pmRNSKallak Drilling
14th Jul 20207:00 amRNSShare Options
6th Jul 20204:23 pmRNSCEO Interview
6th Jul 20207:00 amRNSMadan Peak Gold Target – Grab Sample Results
29th Jun 20201:05 pmRNSDelay in Publication of 2019 Results
17th Jun 20201:05 pmRNSCEO Interview
3rd Jun 20207:00 amRNSLetter to Business, Industry & Innovation Minister
2nd Jun 20207:00 amRNSShare Information
1st Jun 20207:00 amRNSMadjan Peak Shows Epithermal Gold Potential
29th May 20207:00 amRNSUnaudited Financial Results
27th May 20207:00 amRNSKallak Drilling Contract Awarded
26th May 20207:00 amRNSKallak Update – Parliamentary Question
18th May 20207:00 amRNSFinnish Graphite Update
3rd Apr 20207:00 amRNSShare Information
25th Mar 20207:00 amRNSBeowulf Co-Invests with Vardar
4th Mar 202010:59 amRNSShare Information
2nd Mar 20207:00 amRNSUnaudited Preliminary Financial Results
17th Feb 20207:00 amRNSTarget at Mitrovica & Investment in Vardar
13th Feb 20203:00 pmRNSCEO Interview
13th Feb 20207:00 amRNSManagement Update on Kallak
5th Feb 20209:20 amRNSShare Information
4th Feb 20207:00 amRNSSwedish Government Response to CEO's Letter
3rd Feb 20203:34 pmRNS*Correction* Management Update on Kallak
3rd Feb 20207:00 amRNSManagement Update on Kallak
19th Dec 20197:00 amRNSManagement Update
2nd Dec 20192:44 pmRNSShare Information
2nd Dec 201910:51 amRNSCEO Interview
2nd Dec 20197:00 amRNSUnaudited Interim Financial Results
29th Nov 20197:00 amRNSTotal Voting Rights
11th Nov 20197:00 amRNSStatement Submitted To The Government of Sweden
8th Nov 20197:00 amRNSSubscription to raise £250,000
6th Nov 20197:00 amRNSFurther Investment of £100,000 in Vardar
31st Oct 20195:30 pmRNSIssue of Shares/PDMR Dealing
31st Oct 20197:00 amRNSTotal Voting Rights
30th Oct 20197:00 amRNSContained Graphite Increased at Aitolampi
24th Oct 20197:05 amRNSPlans To Investigate Iron Ore Potential
24th Oct 20197:00 amRNSSubscription to raise £500,000
14th Oct 20197:00 amRNSBeowulf Exercises Vardar Option
8th Oct 20197:00 amRNSViti Drilling Intersects Copper-Gold
4th Oct 20193:39 pmRNSCEO Interview
4th Oct 20199:41 amRNSShare Information
4th Oct 20197:00 amRNSManagement Update on Kallak North
30th Sep 20197:00 amRNSTargets Defined in the Mitrovica License
24th Sep 20197:00 amRNSWolf Mountain Drilling and Trenching Results
19th Sep 20197:00 amRNSManagement Update
21st Aug 20197:00 amRNSCEO Interview
20th Aug 20197:00 amRNSUnaudited Interim Results & Management Update
15th Jul 20198:50 amRNSShare Information
8th Jul 20197:00 amRNSAlmedalen 2019 & Plans for Kallak Iron Ore Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.