Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
9.00    3.50 (63.64%)
Bid:
7.00
Ask:
11.00
Spread: 4.00 (57.143%)
Market Cap: £5.82m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Conceptual Study Completed

24 Oct 2006 09:00

Beowulf Mining PLC24 October 2006 BEOWULF MINING PLC Independent Conceptual Study on Ruoutevare Iron Titanium Deposit in Northern Sweden London, 24 October 2006. Beowulf Mining PLC (AIM : BEM) the AIM quoted resourcecompany with iron, titanium, gold and copper projects in Sweden, is pleased toannounce that Raw Materials Group (RMG) of Sweden has completed a conceptualstudy of the Ruoutevare iron/titanium deposit. RMG suggest an extraction rate of10 million tonnes per annum as an economic production rate, requiring furthercost analysis work to be undertaken on ore transportation. RMG produced a simplified cash flow analysis for an eight year open pitextracting 10 million tons per year. This produced a positive study with a cashflow of just over US$50M per year from US$218 million per year of generatedrevenues, using various assumptions. (Full report is on www.beowulfmining.com ). Ruoutevare is 5 km outside the Sareks Nation Park, and careful attention to thelandscaping of the mine and associated facilities will be required. RMG suggestthis may cause a delay in permitting of the deposit. The study used current forecasts of revenues, capital costs and operationalcosts applied to a life of mine financial model. The Ruoutevare deposit is located in northern Sweden in the county ofNorrbotten, and is approximately 8 km NW of the small village of Kvikkjokk. Theproject is at an altitude of 610 meters above sea level and will require fortransport purposes a new 15 km road to be built from the site to Kvikkjokk. Hereit would link up with the existing 180 km road to Murjek and onward roadtransport or product reloading for rail shipment to the Gulf of Bothnia sea portof Lulea. The Swedish iron ore mining company LKAB is shipping out from Luleaannually some 4 Mt of magnetite concentrates and pellets to steel plants inFinland and Sweden. The deposit was originally discovered in the 18th Century. It was assessed bySveriges Geologiska Undersonkning (SGU) in the early 1970s during which timeground geophysics, metallurgical test work and detailed diamond drilling werecompleted. SGU determined a resource for the deposit of 116 Mt grading 38% ironand 5.6% titanium. This data was reviewed by Snowden Mining Industry ConsultantsLimited (Snowden) in 2006 for Beowulf and they reported a slightly highertonnage and a slightly lower grade. The mineralization occurs within outcropping shallowly dipping anorthosite asseveral separate tabular bodies in an area approx 1500m long and 200-300m wide.Snowden concluded that there are probably two lenses lying one above the other.Detailed geological mapping by Beowulf also found two over lying mineralisedlenses. Snowden and Beowulf both conclude that there is reason to believe thatthe resource estimates can be increased by additional drilling. The metallurgical test work was completed by LKAB and Rautaruukki during 1973and gives potential recoveries, using magnetic separation and flotation toproduce an iron ore concentrate and an ilmenite concentrate. The metallurgicalrecoveries are outlined below: Grade Recovery Ore feed to process plant 38% iron 5.6% titaniumMagnetite concentrate 65%iron 65%Ilmenite 44% titanium dioxide 45% A price FOB for magnetite concentrate is estimated to be US$52 per tonne and theprice FOB for ilmenite is estimated to be US$36 per tonne. The capital expenditure plus mine operation costs are not a major impact on whatwould be an open pit mine and are estimated to be 15% over the total eight yearmine life. Estimated costs are however relatively high mainly due to the cost oftransport and port handling charges. Commenting on the conceptual study, Dr. Jan Ola Larsson, Beowulf's SwedishManager, stated: "Initial indications on the economics of Ruoutevare are positive, but we need toaddress the transportation costs by negotiations with the State bodies inSweden. It is believed from geological studies that the tonnage of theRuoutevare reserves can be increased by additional drilling, thus extending themine life and reducing overall unit costs. Selective mining of the deposit canalso be achieved to increase cash flow in the early years of operation, as theSGU suggests that there is a 20 million tonne section grading 47% iron and 11%titanium oxide. Metallurgical testing work to improve the concentrate grade isongoing". For further information :- Dr. Robert Young, ChairmanBeowulf Mining plc Tel: +44-(0)1353 649 701 Gavin BurnellRuegg & Co. Limited Tel: +44-(0)207 584 3663 Nick BealerKing & Shaxson Tel: +44-(0)207 426 5986 Charles DampneyCity Capital Securities Limited Tel: +44-(0)207 822 7107 Gary MiddletonSt Swithin's Public Relations Tel: +44 (0) 207 429 4391 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st Mar 20257:00 amRNS-RCEO Interview
27th Mar 20257:00 amRNS-RUpdated Corporate Presentation
21st Mar 20257:00 amRNSPlacing and Notice of General Meeting
10th Mar 20257:00 amRNSGAMP PFS Demonstrates Robust Project Economics
28th Feb 20256:14 pmRNSUnaudited Results for year ended 31 December 2024
16th Dec 20247:00 amRNSPortfolio update
2nd Dec 20247:00 amRNSChange of Auditor
29th Nov 20247:00 amRNSUnaudited Financial Results
26th Nov 20247:00 amRNSBusiness Finland Commits Additional Grant Funding
31st Oct 20247:00 amRNSCompletion of Business Finland Project
30th Sep 20247:00 amRNSInitiation of the Consultation Process for Kallak
5th Sep 20247:00 amRNSTest-work confirms high grade product at Kallak
30th Aug 20247:00 amRNSUnaudited Results for Period Ended 30 June 2024
28th Aug 20247:00 amRNSGraphite Anode Materials Plant update
22nd Jul 20247:00 amRNSChief Executive Share Purchase
16th Jul 20247:00 amRNSGállok/ Kallak Iron Ore Project Update
28th Jun 20243:45 pmRNSChief Executive Share Purchase
25th Jun 20249:48 amRNSUpdate on the Kallak Iron Ore Project
14th Jun 202410:40 amRNSResult of Annual General Meeting
10th Jun 20247:00 amRNSGraphite Anode Materials Plant update
3rd Jun 20247:00 amRNSGállok/ Kallak Iron Ore Project Update
29th May 20247:00 amRNSUnaudited Results for Period Ended 31 March 2024
20th May 20247:00 amRNSPosting of Annual Report and Notice of AGM
20th May 20247:00 amRNSFinancial Results for the year ended 31 Dec 2023
30th Apr 20247:00 amRNSTotal Voting Rights
25th Apr 202411:45 amRNSSP Angel Research Note
23rd Apr 20247:00 amRNSAlternative Resource Capital Research Note
18th Apr 20247:00 amRNSGrant of Options
11th Apr 20247:00 amRNSLast day of trading in Paid Subscribed SDRs
10th Apr 20247:00 amRNSIssue of SDRs to underwriters
9th Apr 20247:00 amRNSCompletion of Vardar Minerals Ltd Consolidation
3rd Apr 20247:00 amRNSBeowulf announces outcome of Capital Raise
26th Mar 20247:00 amRNSProspective Exploration Targets at Parkijaur nr 7
20th Mar 202410:05 amRNSCapital Raise Update
20th Mar 20249:43 amRNSCapital Raise Update
15th Mar 20247:00 amRNSUpdate on Consolidation of Vardar Minerals Limited
14th Mar 202410:30 amRNSPrimaryBid Offer
14th Mar 20247:06 amRNSSubscription period in Rights Issue of SDRs begins
13th Mar 20244:37 pmRNSPublication of Prospectus
12th Mar 20244:50 pmRNSPostponement of Subscription period
8th Mar 20242:10 pmRNSBörsveckan Presentation and Interview
7th Mar 20247:00 amRNSProject Director appointed for Kallak
5th Mar 20241:40 pmRNSResult of General Meeting
4th Mar 20247:00 amRNSVardar Consolidation of Ownership and Update
4th Mar 20247:00 amRNSBeowulf announces final terms for capital raise
29th Feb 20247:00 amRNSParkijaur nr 8 Exploration Permit Awarded
29th Feb 20247:00 amRNSUnaudited Preliminary Financial Results
19th Feb 20247:00 amRNSExtension of Site Reservation in GigaVaasa Area
16th Feb 20247:00 amRNSProposed fundraise and Notice of General Meeting
5th Feb 20247:00 amRNSProject Director appointed for Kallak

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.