The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAura Egy Regulatory News (AURA)

Share Price Information for Aura Egy (AURA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 9.50
Bid: 9.00
Ask: 10.00
Change: 0.00 (0.00%)
Spread: 1.00 (11.111%)
Open: 9.50
High: 9.50
Low: 9.50
Prev. Close: 9.50
AURA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Substantial Water Reconfirmed at Tiris

13 Dec 2021 07:13

RNS Number : 4135V
Aura Energy Limited
13 December 2021
 

 

13 December 2021

'Liquid Gold' in the Sahara - Substantial Water Reconfirmed at Tiris

KEY POINTS:

· Aura has successfully completed the 2021 water drilling campaign, with substantial water encountered in 8 holes, reconfirming the results from water drilling undertaken in 2019.

· The project requires approximately 0.5 giga-litres of water with the Target C22 water occurrence likely to contain several giga-litres of water, with potential for significantly more, without allowing for recharge.

· The presence of sufficient water is important to the mining process, and represents another significant milestone as Aura transforms from uranium explorer to a uranium producer.

Aura Energy Limited (ASX:AEE) ("Aura", the "Company") is pleased to announce the completion and successful results from the Company's 2021 water drilling program, with strong flows encountered at the Tiris Uranium Project ("Tiris", "Project"), reconfirming the results from the 2019 water drilling program undertaken by the Company (ASX Release - 25 September 2019).

Aura completed 8 boreholes for 2021 water drilling program, 7 of which are at Target C22, with all producing strong water flows, including several with high yields as outlined in the table below:

Target Borehole Water yield (l/hr) Water Table (m)

C22 19C22F2 20,000 30.0

C22 21C22F1 18,000 20.4

C22 21C22F2 20,000 19.2

C22 21C22F3 26,000 23.3

C22 21C22F5 3,000 30.0

C22 21C22F6 57,000 16.2

C22 21C22F7 54,000 15.2

C22 21C22F8 20,000 ~20

 

Table 1 - Results from the 2021 water drilling campaign

 

The location of the water targets and completed bores in relation to project location is shown in Figure 2.

 

Aura Energy Managing Director, Peter Reeve, commented: "While Aura has been confident in locating sufficient water for the Project based on earlier work, locating substantial occurrences of water within the Sahara Desert, and within Precambrian basement rocks, was always going to be challenging. We are therefore delighted to have located this large water accumulation so early in our program and close to the proposed plant site."

"With sufficient water located in the Oued el Foule Depression at the Project, production can be expedited with capital expenditure and operating costs also likely to remain low in comparison to peer uranium projects[1]. We look forward to announcing further developments as we transform from a uranium explorer to producer."

The Project has an initial water requirement of approximately 0.5 giga-litres. Based on the spacing of water bearing drillholes to date, the C22 water occurrence is likely to contain several giga-litres of water, and possibly significantly more, without allowing for recharge. The C22 water field is therefore likely to supply the water requirements of the Project, with long term pump testing, drawdown and recharge observations in progress to confirm this.

The C22 occurrence lies within a metasedimentary zone between 2 granite cupolas (refer Figure 3). It occurs in very flat desert terrain, evident in the photographs below, but within a very shallow, barely perceptible drainage system which is however evident in an enhanced digital terrain model. (Refer Figure 4).

Aura commenced water search activities in the vicinity of its Tiris Uranium deposit in 2018. The uranium deposits lie on Precambrian granite and metamorphic rocks, generally regarded as challenging geology for the location of substantial water resources. For this reason, Aura focussed initially on the Taoudeni Basin, a very large sedimentary basin, the basal members of which supply water for the Zouerate iron-ore operation, some 600 km from Tiris.

A program of geophysics was conducted at this location in 2018/19, with a number of targets identified. However, these are located over 100 km from the project, hence it was decided to attempt to locate a source of water closer to the proposed plant site on the Precambrian shield rocks.

In 2019, 24 targets were identified by lineament analysis for testing by ground geophysics, electro magnetics and resistivity. From this work 9 targets were selected for drill testing.

A drilling program was commenced in 2019. Four holes were completed before the program was suspended due, ironically, to very heavy rain which caused local flooding. Two of the holes intersected significant water flows, the better of which, in Target C22 yielded 15,000 litres per hour.

The drilling program was resumed in August 2021.

 

Next Steps:

In light of the excellent results from Target C22 Aura has now drawn a halt to the exploratory drilling program, and has drilled five monitoring holes, to model aquifer permissivity, drawdown and recharge characteristics.

 

To view Figure 1: Project Location, please click here: http://www.rns-pdf.londonstockexchange.com/rns/4135V_1-2021-12-13.pdf

To view Figure 2: Location of C22 water occurrence in relation to the Tiris Project, please click here http://www.rns-pdf.londonstockexchange.com/rns/4135V_2-2021-12-13.pdf

To view Figure 3: Target C22 on geology showing recorded water flow rates in litres per hour, please click here http://www.rns-pdf.londonstockexchange.com/rns/4135V_3-2021-12-13.pdf

 

To view Figure 4: Target C22 on Digital Terrain Model - this DTM image enhances the subtle topography and drainage, please click here: http://www.rns-pdf.londonstockexchange.com/rns/4135V_4-2021-12-13.pdf

 

To view Image 1, 2 & 3 - Water Drilling at the Tiris Uranium Project, please click here: http://www.rns-pdf.londonstockexchange.com/rns/4135V_5-2021-12-13.pdf

 

To view Table 1: 2021 Water Bores Details, please click here: http://www.rns-pdf.londonstockexchange.com/rns/4135V_6-2021-12-13.pdf

 

This ASX Release was authorised by the Aura Energy Board of Directors.

 

For Further Information, please contact:

Peter Reeve

Managing Director & CEO

Aura Energy Limited

preeve@auraee.com

+61 417 377 114

 

Jane Morgan

JMM

Investor & Media Relations

jm@janemorganmanagement.com.au

+61 405 555 618

 

SP Angel Corporate Finance LLP

(Nominated Advisor and Joint Broker)

Ewan Leggat

Caroline Rowe

Telephone: +44 (0) 203 470 0470

WH Ireland Limited(Joint Broker)

Adrian Hadden

Andrew de Andrade

Telephone: +44 (0) 207 220 1666

 

 

Competent Person's Statement

Exploration information in this Announcement is based upon work undertaken by Mr Neil Clifford who is a Member of the Australasian Institute of Geoscientists (AIG). Mr Clifford has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a 'Competent Person' as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code). Mr Clifford is an independent consultant to Aura Energy Limited and consents to the inclusion in this Announcement of the matters based on their information in the form and context in which it appears.

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

 

[1] See 'Competitive Advantage and Comparison Presentation' released 7 October 2021

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLGPGRUPUPGUMW
Date   Source Headline
10th Jun 20197:00 amRNSFarm-in agreement with Nomads Mining Company
24th May 20197:10 amRNSAppointment of Joint Broker
23rd May 20197:00 amRNSFirst Yellow Cake produced during testwork phase
22nd May 20197:00 amRNSIssue of Shares
21st May 20197:00 amRNSNotice of meeting
30th Apr 20194:41 pmRNSSecond Price Monitoring Extn
30th Apr 20194:35 pmRNSPrice Monitoring Extension
30th Apr 20198:43 amRNSMarch quarterly report
30th Apr 20198:27 amRNSIssue of Shares
30th Apr 20198:23 amRNSAura completes A$2.0m financing
23rd Apr 20198:01 amRNSIssue of Shares
8th Apr 20198:40 amRNSUpdate - Grant of Tenements
4th Apr 20194:40 pmRNSSecond Price Monitoring Extn
4th Apr 20194:35 pmRNSPrice Monitoring Extension
4th Apr 20192:05 pmRNSSecond Price Monitoring Extn
4th Apr 20192:00 pmRNSPrice Monitoring Extension
4th Apr 201911:05 amRNSSecond Price Monitoring Extn
4th Apr 201911:00 amRNSPrice Monitoring Extension
3rd Apr 20197:16 amRNSGold and base metals tenements granted
22nd Mar 20199:34 amRNSIssue of Shares
7th Mar 20197:00 amRNSHalf-year Report
26th Feb 20198:00 amRNSIssue of Shares
21st Feb 201910:02 amRNSShare Purchase Plan Booklet
13th Feb 20198:00 amRNSIssue of Shares
5th Feb 20198:21 amRNSTrading Halt & Completion of Placing
31st Jan 20197:56 amRNSASX Trading Halt
31st Jan 20197:53 amRNSDecember Quarterly Report
30th Jan 20197:36 amRNSAura appoints Financial Advisors
29th Jan 20197:01 amRNSUranium offtake agreement concluded for Tiris
4th Jan 20197:35 amRNSIssue of Shares
18th Dec 20187:50 amRNSExploration Licence Granted
19th Nov 20187:51 amRNSIssue of Shares
14th Nov 20188:05 amRNSResult of AGM
31st Oct 20187:35 amRNSQuarterly report
30th Oct 20187:00 amRNSTiris uranium project update
25th Oct 20187:59 amRNSHaggan Vanadium Project scoping study update
17th Oct 20187:20 amRNSPotential for vanadium at Tiris uranium project
16th Oct 20185:49 pmRNSNotice of AGM
28th Sep 201810:00 amRNSCorporate Governance Statement
28th Sep 20187:29 amRNSFinal Results
19th Sep 20189:38 amRNSIssue of Shares
31st Jul 201812:23 pmRNSJune Quarterly Report
28th Jun 20189:05 amRNSTranche 1 Shares Admitted to Trading
15th Jun 20183:44 pmRNSIssue of Shares
12th Jun 201810:43 amRNSResult of Extraordinary General Meeting
23rd May 20187:12 amPRNNew resource estimate - Haggan battery metals project
16th May 20188:03 amRNSIssue of Shares
14th May 20181:53 pmRNSNotice of General Meeting
1st May 20188:00 amPRNAdditional vanadium resource modelling work Häggån
1st May 20188:00 amPRNIssue of Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.