The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.10 (8.70%)
Spread: 0.10 (8.333%)
Open: 1.175
High: 1.275
Low: 1.25
Prev. Close: 1.15
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

BKM Copper Project Power Solution Progressing

20 Oct 2022 07:00

RNS Number : 4353D
Asiamet Resources Limited
20 October 2022
 

 

 

20 October 2022

BKM Copper Project Power Solution Progressing

 

Asiamet Resources Limited ("ARS" or the "Company") is pleased to provide an update in relation to the potential power solution for the BKM copper project, located in Central Kalimantan, Indonesia.

 

Following the execution of a memorandum of understanding between the Indonesian State Electricity Company (PLN) and the Company in September 2022, PLN has undertaken a powerline route survey and site visit to evaluate the viability of installing a new transmission line to provide grid power to the BKM site. Senior representatives of PLN have indicated a high level of support for the development of the new transmission line and the additional power consumption this will deliver to Central Kalimantan due to there being an excess of power available in the province. The outcome of the work with PLN will be delivery of the preferred technical solution and commercial consideration for grid power supply to the BKM Copper project.

 

The current envisaged plan would be to install a transmission line from a new substation at Kuala Kurun, approximately 80 line kms from the BKM site and would include the installation of a substation at the mine.

 

Given the implications of recent cost increases for hydrocarbon fuels, establishing a connection to the grid provides access to reliable low cost power which:

 

· significantly improves project economics for the development of the BKM copper project and any future growth opportunities on the KSK CoW.

· reduces long haul transportation of fuel from ports to site, significantly reducing both cost and the carbon footprint of the project;

· depending on the chosen transmission system and route, possible provision of power to local communities who are currently without grid power.

The results of this work will be incorporated into the 2022 Feasibility Study Update (FS Update).

 

Whilst the progress with PLN has been very encouraging the company continues to investigate additional options of power supply for the BKM project. The company has engaged Indonesian firm PT Britmindo Indonesia to complete a scoping study on the viability of power generation via Biomass. There exists significant feedstock of Biomass from Palm Oil Mills within reasonable proximity to the KSK contract of work area. Biomass represents a source of renewable energy for the project and has the potential to deliver a similar cost option to grid power. A third option, the provision of natural gas to the site for power generation continues to be considered with ongoing engagement with related parties. The company considers it critical to have multiple options available for such an important input to the project however at the end of the process one solution for power supply will be selected to take forward. 

 

Darryn McClelland, Asiamet Chief Executive Officer commented:

 

"Having PLN complete the transmission line survey and site visit is an important milestone for the BKM copper project. The connection of the site to grid power has the potential to materially change the economics of the project and becomes an enabler for future development of the KSK contract of work.

The company will continue to work closely with all parties to deliver a solution for reliable, low cost power for BKM Copper. Ongoing work to enable this solution is being advanced jointly with PLN and others and we will continue to provide regular updates on these activities. It is expected work on power supply will be advanced to the required degree of confidence for inclusion in the FS update with ongoing requirements taken through into the detailed design phase of the Project.

As major work streams conclude we will continue to provide further updates on the Feasibility Study."

 

-Ends-

 

For further information, please contact:

Darryn McClelland Chief Executive Officer, Asiamet Resources LimitedEmail: darryn.mcclelland@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / info@asiametresources.com

Asiamet Resources Nominated Adviser RFC Ambrian Limited

Bhavesh Patel / Stephen Allen

Telephone: +44 (0)20 3440 6800

Email: Bhavesh.Patel@rfcambrian.com / Stephen.Allen@rfcambrian.com

 

Optiva Securities Limited Christian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

Follow us on twitter @AsiametTweets

 

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014 ("MAR").

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCMLBMTMTABBIT
Date   Source Headline
18th Oct 201811:45 amRNSPlans Additional Drilling to Enhance BKM BFS
25th Sep 201811:00 amRNSInterim Results
29th Aug 20187:00 amRNSDrilling Expands Beutong West Copper Deposit
21st Aug 201810:00 amRNSAppointment of Berenberg as Joint Corporate Broker
10th Aug 201810:00 amRNSBankable Feasibility Study Update
7th Aug 20187:15 amRNSDrilling Extends Beutong Copper Mineralisation
19th Jul 20184:30 pmRNSExercise of Options
12th Jul 20188:03 amRNSAppointment of Executive VP - External Relations
2nd Jul 20186:00 pmRNSExercise of Options and Warrants - Replacement
2nd Jul 201812:40 pmRNSExercise of Options and Warrants
26th Jun 20187:00 amRNSAppointment of Director
25th Jun 201810:30 amRNSResult of AGM
25th Jun 20187:00 amRNSLifts Beutong Copper-Gold Project Interest to 80%
22nd Jun 201810:57 amRNSAttendance at Mining Journal Select Conference
14th Jun 201810:21 amRNSIntersects 456m of Cu mineralisation at Beutong
6th Jun 201812:00 pmRNSExercise of Options
1st Jun 201811:45 amRNSDirector Appointment
25th May 20185:00 pmRNSNotice of Annual General Meeting
24th May 20188:00 amRNSDirector Changes
16th May 20187:00 amRNSInitial Mineral Resource Estimate for BKZ Deposit
2nd May 20182:30 pmRNSExercise of Options
27th Apr 20189:00 amRNS2017 Annual Report & Financial Statements
18th Apr 20183:30 pmRNSBroker Warrants Exercised
16th Apr 20183:10 pmRNSAsiamet April Investor Events - Birmingham, London
16th Apr 201811:15 amRNSIntersects High Grade Mineralisation at Beutong
3rd Apr 201811:19 amRNSReports BKM Geotech Results - Replacement
3rd Apr 20187:30 amRNSReports Assay Results for BKM Geotech Holes
29th Mar 20185:00 pmRNSExercise of Options
28th Mar 201810:25 amRNSBKZ Delivers Outstanding Mineralisation
26th Mar 20189:35 amRNSSecures long term tenure for BKM Copper Project
19th Mar 201812:49 pmRNSBKZ Drilling Intersects High Grade Mineralisation
13th Mar 20186:15 pmRNSSuccessful Placing of £7.2 Million
13th Mar 201812:15 pmRNSPlacing to Raise up to £7.2 Million
9th Mar 201810:30 amRNSExercise of Options
1st Mar 201812:00 pmRNSCorporate Broker Appointment
1st Mar 20187:30 amRNSCommences Drilling Beutong Copper-Gold Deposit
28th Feb 20187:20 amRNSmetallurgical tests confirm positive results
22nd Feb 20181:35 pmRNSIntersects Further High-Grade Zinc, Lead, Copper
13th Feb 20181:00 pmRNSExercise of Options
6th Feb 20187:00 amRNSIntersects High Grade Copper Mineralisation at BKZ
31st Jan 20187:00 amRNSBKZ Delineation Drilling and Plans for Beutong
17th Jan 201811:45 amRNSDirector Resignation
11th Jan 201811:15 amRNSGrant of Options
11th Jan 20189:15 amRNSCommences Resource Drilling at BKZ
8th Jan 20187:00 amRNSProduction Licence for Beutong Project
19th Dec 201710:15 amRNSPositive Metallurgical Test-work Results
29th Nov 20177:00 amRNSIntersects 115.5m at 1% Cu at BK44 Zone
24th Nov 201712:15 pmRNSAppointment of James Deo as CFO
21st Nov 201712:15 pmRNSFurther High-Grade Zn-Pb-Ag at BKZ Deposit
13th Nov 20178:40 amEQSAsiamet Extends High Grade Copper Mineralisation Beneath BKZ Zn-Pb-Cu-Ag-Au Deposit

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.