Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Resources Limited Regulatory News (ARS)

Share Price Information for Asiamet Resources Limited (ARS)

Share Price is delayed by 15 minutes
Get Live Data
1.425    0.00 (0.00%)
Bid:
1.40
Ask:
1.45
Spread: 0.05 (3.571%)
Market Cap: £48.36m
ARS Live PriceLast checked at - London Stock Exchange

Intraday Asiamet Resources Limited Share Chart

BKM Copper Project Feasibility Study Advancing

6 Oct 2017 11:16

Asiamet Resources Ltd. (ARS) BKM Copper Project Feasibility Study Advancing 06-Oct-2017 / 11:15 GMT/BST Dissemination of a Regulatory Announcement, transmitted by EQS Group. The issuer is solely responsible for the content of this announcement.


 

 

For Immediate Release London AIM

 

6 October 2017 Symbol: ARS

 

 

 

Asiamet BKM Copper Project Feasibility Study Advancing

 

Excellent progress continues to be made on the Beruang Kanan Main ("BKM") Feasibility Study, encompassing all technical, commercial, environmental and community disciplines.

Focus in the period since our recent successful capital raising has been as follows:

Mining and metallurgical engineering activity has been advancing through design and analytical work, utilising the recently updated BKM Resource information The metallurgical test-work program has significantly advanced through the column leaching phase and complementary laboratory work including physical (hydrodynamic) leach pad modelling to support leach pad optimisation has been initiated Shortlisted service providers covering the process engineering, power supply, and water management components of the BFS are being evaluated. Preferred vendors will be engaged shortly to accelerate these aspects of the study

Mine Engineering

Mine engineering activities ramping-up: Australian Mine Design and Development ("AMDAD") were engaged in 2016 to undertake the mining engineering components of the Feasibility Study. AMDAD has extensive and relevant experience working in Indonesia and in early 2017 completed a Project Definition Study ("PDS") for the BKM project (see RNS dated 22 March 2017) which built upon the planning from the Preliminary Economic Assessment ("PEA") to provide better definition for the Feasibility Study scope of work. The results of the AMDAD PDS provided a high level of confidence in advancing to a Bankable Feasibility Study ("BFS").

AMDAD are now developing new mining cost models and re-running a series of pit optimisations based on the updated BKM Resource (see RNS dated 28 June 2017) and utilising more refined metallurgical and project planning information.

Metallurgical Engineering

Metallurgical test-work program continuing optimisation activities: David Readett from MWorx, the lead metallurgical consultant for the BKM Feasibility Study, has continued to oversee the leach column program being undertaken at CORE laboratories in Brisbane. Column tests have been running since January 2017 and the short (2 metre) columns are currently progressing through the scheduled closure process. Results in relation to this work are anticipated before the end of October. The longer columns (6 metre) will continue operating as planned, through to the 4th quarter of 2017.

The study team have also recently initiated a hydrodynamic testing program which is being conducted at the world-leading HydroGeoSense ("HGS") facility in Arizona. The hydrodynamic testing is a critical input to the heap-leach design and focuses heavily on the physical behaviour of fluid-flow within the heap.

Key data generated from these programs will allow the project team to develop a robust and optimised set of design criteria for the heap-leach pads and overall process engineering work.

Geochemistry

Kinetic test-work focused on the behaviour of the proposed waste dump materials to environmental conditions overtime is underway and will support the geochemical analysis being completed by our environmental team at PT Lorax.

Vendor Selection

Additional contractors and consultants continue to be engaged to support ramp-up of activities.

The selection of a process engineering service provider is well advanced, with proposals having been submitted to the Company from seven international engineering consultancies. Engagement of the preferred process engineering contractor will be made shortly along with service providers covering the following key study components:

Power supply: Based upon the PEA it is anticipated that approximately 20MW of electricity will be required to support operations at BKM. The study will determine the most appropriate technical and commercial approach to supply power to the BKM operation.

 

Water Management: Asiamet, supported by PT Lorax's Indonesian and international experts, is developing site-wide water and load balances using custom-built water management models. This is a key area for the BKM Project to be initiated early this month.

 

Site Infrastructure layout: Asiamet will shortly commence a limited drilling program to confirm the suitability of key areas for locating mine-site infrastructure from a mineralisation and geotechnical perspective. This work is planned to be completed in the 4th quarter of 2017.

 

Peter Bird, Asiamet's Chief Executive Officer commented:

"Following on from an intensive Resource evaluation drilling programme and subsequent significant upgrade in the BKM copper Resource estimate, we are pleased to report a significant ramp up of activity relating to the engineering and design aspects of the BKM Bankable Feasibility Study.

The Bankable Feasibility Study is very focused on fine tuning the outcomes of the PEA. We are really pleased with the positive results generated from the early phase engineering and design studies, coupled with the excellent results from our exploration and metallurgical test-work programs. Work to date reaffirms the potential for developing a high-quality copper mine at BKM. The detailed engineering and design is a large package of work which will significantly advance the progress and robustness of the BKM BFS and we look forward to progressively reporting results as they become available."

 

Qualified Person

Data disclosed in this press release have been reviewed and verified by Asiamet's qualified person, Stephen Hughes, P. Geo, Vice President Exploration of the Company and a Qualified Person within the meaning of NI 43-101 and for the purposes of the AIM Rules

 

ON BEHALF OF THE BOARD OF DIRECTORS

Peter Bird, Deputy Chairman and CEO

-Ends-

For further information, please contact:

Peter BirdDeputy Chairman and CEO, Asiamet Resources LimitedTelephone: +61 3 8644 1300Email: peter.bird@asiametresources.com

 

Tony ManiniExecutive Chairman, Asiamet Resources LimitedTelephone: +61 3 8644 1300Email: tony.manini@asiametresources.com

 

FlowComms Limited

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com 

Asiamet Resources Nominated AdviserRFC Ambrian Limited

Andrew Thomson / Stephen Allen

Telephone: +61 8 9480 2500

Email: Andrew.Thomson@rfcambrian.com / Stephen.Allen@rfcambrian.com

 

Optiva Securities LimitedChristian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

 

 

Forward looking statements

This announcement includes "forward-looking statements" which include all statements other than statements of historical facts, including, without limitation, those regarding the Company's business strategy, plans and objectives of management for future operations, or any statements proceeded by, followed by or that include the words "targets", "believes", "expects", "aims", "intends", "will", "may", "anticipates", "would", "could" or similar expressions or negatives thereof. Such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the Company's control that could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding the Company's present and future business strategies and the environment in which the Company will operate in the future. These forward-looking statements speak only as at the date of this announcement. The Company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained herein to reflect any change in the Company's expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based, unless required to do so by applicable law or the AIM Rules.

 


ISIN:BM04521V1038
Category Code:DRL
TIDM:ARS
LEI Code:213800PWJMT1NG28TA88
Sequence No.:4704
 
End of AnnouncementEQS News Service

616517 06-Oct-2017 

UK Regulatory announcement transmitted by DGAP - a service of EQS Group AG. The issuer is solely responsible for the content of this announcement.

Date   Source Headline
26th May 20265:30 pmRNS2025 Annual Report & Financial Statements
12th Mar 20267:25 amRNSRegulatory Approval Received for KSK Transaction
12th Mar 20267:25 amRNSRegulatory Approval Received for KSK Transaction
29th Jan 20261:30 pmRNSResults of General Meeting
27th Jan 20265:30 pmRNSUpdate on Proposed Sale of Indokal (KSK Project)
17th Dec 20256:08 pmRNSUS$3.1 million Subscription
9th Dec 20251:55 pmRNSResults of Annual General Meeting
27th Nov 202512:45 pmRNSPDMR Dealing
14th Nov 202510:00 amRNSPDMR Dealing
12th Nov 20259:30 amRNSPDMR Dealing
10th Nov 20257:00 amRNSNotice of Annual General Meeting
6th Nov 202510:13 amRNSSale of Asiamet’s Interest in the KSK Project
6th Oct 202510:00 amRNSLong Term Incentive Programme
17th Sep 20257:00 amRNSDirector’s Fees and Employee Share-Based Payments
15th Sep 20257:00 amRNSBKM Copper Project Limestone Drilling Update
29th Aug 20257:00 amRNSInterim Results for Six Months Ended 30 June 2025
15th Aug 20257:00 amRNSLimestone Resource Drilling at BKM Copper Project
11th Aug 20257:00 amRNSAppointment of Project Director for BKM
18th Jul 20257:00 amRNSAppointment of Grant Samuel
15th Jul 20254:00 pmRNSCompletion of Subscription
9th Jul 20257:00 amRNSAppointment of Shore Capital as Corporate Broker
9th Jun 20255:15 pmRNSTR-1: Notification of major holdings
5th Jun 20257:00 amRNSCommencement of BKM Project Financing Process
29th May 20257:21 amRNSUS$2.5 million Subscription
29th May 20257:07 amRNS2024 Annual Report & Financial Statements
20th May 20257:00 amRNS-RBKM Stage 1 OFS – Investor Presentation and Q&A
15th May 20257:00 amRNSCompletion of BKM Feasibility Study ITE Report
7th May 20257:00 amRNSBKM Copper Project Optimised Feasibility Study
2nd May 202512:15 pmRNSUpdated Ore Reserve for BKM Stage 1
24th Apr 20257:00 amRNSPower Study Completes Inputs for Feasibility Study
28th Mar 20257:00 amRNSBKM Optimised Feasibility Study Near Completion
23rd Dec 20243:00 pmRNSBKM Capital Cost Estimate Reduced by US$58 Million
17th Dec 202410:00 amRNSDirector’s Fees and Employee Incentive Payments
26th Nov 202411:30 amRNSAppointment of Head of Corporate Finance
14th Nov 20247:00 amRNSBKM Copper Project Optimisation Works Update
18th Oct 20245:00 pmRNSSuccessful Completion of US$3.55 million Raise
15th Oct 20242:30 pmRNSRetail Offer
15th Oct 20242:25 pmRNSUS$3.3 million Subscription
7th Oct 20247:05 amRNSBoard Changes
30th Sep 202412:00 pmRNSInterim Results for Six Months Ended 30 June 2024
22nd Aug 202411:30 amRNSMaterial Capex Reductions for BKM Copper Project
26th Jun 20244:30 pmRNSResult of AGM
25th Jun 20247:00 amRNSBKM Copper Project Optimisation
3rd Jun 202410:00 amRNSNotice of Annual General Meeting
14th May 20247:00 amRNSBKM Heap Leach Facility Earthworks Optimisation
9th May 202411:45 amRNS2023 Annual Report & Financial Statements
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.