The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.275
Bid: 0.25
Ask: 0.30
Change: 0.00 (0.00%)
Spread: 0.05 (20.00%)
Open: 0.275
High: 0.275
Low: 0.275
Prev. Close: 0.275
ARK Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

32.2% Zinc + Lead combined over 5.4m at Stonepark

18 Jun 2018 13:01

RNS Number : 7363R
Connemara Mining Company plc
18 June 2018
 

18 June 2018

 

Connemara Mining Company plc

("Connemara" or the "Company")

 

First new hole at Stonepark intersects 32.2% combined Zinc and Lead over 5.4m

 

Connemara Mining Company plc (LON: CON), the Irish gold and zinc exploration company, is pleased to announce results from hole G11-2638-01 at the Stonepark Zinc Project ("Stonepark"). This hole was drilled into a key area of known high-grade mineralisation on the presumed eastern edge of the recently announced maiden Inferred Mineral Resource Estimate (RNS dated 17 April 2018). Connemara's joint venture partner, Group Eleven Resources Corp. ("Group Eleven"), is the project operator.

 

Highlights:

· G11-2638-01 intersected 5.40m of 25.0% zinc and 7.2% lead (32.2% Zn+Pb combined) and 12.2 g/t silver (true width is estimated at 4.9m), verifying one of the high-grade zones within the Stonepark Resource;

· Robust mineralisation interpreted to be open eastwards toward Glencore's neighbouring Pallas Green deposit1.

 

Patrick Cullen, Chief Executive Officer of Connemara, commented: "We are very pleased with these grades from the first new hole at Stonepark since 2012 and with progress following on from the recent announcement of a maiden Resource. The results underline the high grade nature of the deposit.

 "The decision to drill inclined holes has yielded immediate results by giving better structural information. This has opened the deposit eastwards, presenting opportunity to increase the Resource towards Glencore's Pallas Green deposit.

"The strategic value of the location of Stonepark should not be overlooked, it lies adjacent to Pallas Green. These deposits are Ireland's two largest undeveloped zinc-lead Resources by metal contained."

 

Stonepark Zinc Project

The Stonepark Zinc Project is a joint venture between Connemara (23.44% interest) and Group Eleven (76.56% interest). The NI43-101 independent report on Stonepark has been uploaded to SEDAR by partner Group Eleven and a copy of this report is available on the Connemara website.

A maiden Inferred Mineral Resource at Stonepark (which has been updated) totaling 5.1 million tonnes at 11.3% Zn+Pb combined (8.7% Zn and 2.6% Pb)2.

Glencore's nearby Pallas Green deposit contains 44.2 million tonnes of 7.2% Zn + 1.2% Pb (8.4% combined) in the Inferred Category (Glencore Resources & Reserves, 31 December 2017). Based on the above disclosures, the Stonepark deposit is shallower and higher-grade than the Pallas Green deposit.

 

Further Details

 

The re-evaluation of interpretations supporting the recent Resource estimate at the Stonepark project demonstrated that near-vertical faults had been historically used to define the boundaries of mineralisation. The presence of these faults, however, was never adequately tested, reflecting the fact most drilling at Stonepark was vertical.

 

Angled hole G11-2638-01 was drilled to test one of these faults previously thought to truncate the eastern side of high-grade mineralisation and separate Stonepark from Glencore's adjoining Pallas Green property located approximately 1km to the east. The hole first verified a lobe of the Inferred Resource envelope (described above), then continued to the east but never encountered the postulated fault. This suggests Stonepark mineralisation is indeed open to the east towards the Pallas Green deposit, increasing the prospectivity of Stonepark and highlighting its importance in the larger regional system.

 

Hole G11-2638-01 was diamond drilled to a depth of 456m with an azimuth of 065° and dip of -65°. Core was oriented using a Reflex Act II tool. This hole intersected mineralisation close to an historic hole3 hosting similar thickness and grade.

 

Exhibit 1. Results from hole G11-2638-01 at Stonepark Project, Ireland

From

To

Interval

Zinc

Lead

Zinc+Lead

Silver

(m)

(m)

(m)

(%)

(%)

(%)

(g/t)

234.05

239.45

5.40

24.97

7.20

32.17

12.22

Source: Group Eleven Resources Corp. Note: This intercept is not true width but estimated to be about 90%, assuming mineralisation is sub-horizontal as per the Inferred Mineral Resource Estimate dated 26 April 2018.

 

A second zone of much weaker sulphide mineralisation (approximately 8.75m in down-hole thickness) was intersected 18.7m below the main intercept described above. Assays are expected over the next 1-2 weeks. This second zone is another indication that drilling is still very much within the mineralising system.

 

Quality Assurance / Quality Control (QA/QC)

 

Drill-core samples were prepared and assayed in the ALS Minerals' OMAC Laboratory in Loughrea, Ireland. Samples were fine-crushed (CRU-31) to 70% < 2mm and pulverized and riffle-split to 85% < 75 µm. Zinc, lead and silver assays were obtained by multi-acid (4-acid) digestion/ICP-AES Package (48 Elements). Ore grade samples were analyzed by code MS61 multi-element and OG62 standard ore-grade. Two samples assaying greater than 30% zinc were analyzed under code OG62h. Analytical accuracy and precision are monitored by the submission of a blank and a standard inserted into the sample train of 17 samples by Group Eleven personnel. No duplicate samples were sent to the lab. ALS inserted four standards, one blank and ran two pulp duplicates for MS61 and OG-62 and three standards, one blank and one pulp duplicate for OG62h.

 

This announcement has been reviewed and approved by Gavin Berkenheger (CGeol) in his capacity as the Qualified Person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies issued by the London Stock Exchange.

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

 

Information for Editors:

Connemara is a diversified exploration company with principal assets in gold and zinc exploration licences across Ireland. Connemara currently holds interests in a total of 39 licences, including joint ventures with Teck at the Oldcastle Zinc Project and with Group Eleven Resources Corp at the Stonepark Zinc Project.

 

Further information can be sourced from the Company website: www.connemaramc.com

 

ENDS

 

Enquiries:

 

Connemara Mining Company Plc

John Teeling, Chairman

+353 (0) 1 833 2833

Patrick Cullen, CEO

+353 (0) 87 272 1748

+44 (0) 755 237 8208

Northland Capital Partners Limited

Matthew Johnson / Edward Hutton

+44 (0) 203 861 6625

John Howes

First Equity Limited

Jason Robertson

+44 (0) 207 374 2212

Blytheweigh

+44 (0) 207 138 3204

Nick Elwes

+44 (0) 783 185 1855

Simon Woods

+44 (0) 781 784 1793

Teneo PSG

Luke Hogg

+353 (0) 1 661 4055

Alan Tyrrell

+353 (0) 1 661 4055

 

 

[1] 44.2 million tonnes of 7.2% Zn+ 1.2% Pb in the Inferred Category (Glencore; 31 December 2017)

 

2 Connemara's RNS news release dated April 17, 2018 relied on CSA Global's original Mineral Resource Estimate of 5.3Mt @ 8.55% Zn + 2.60% Pb (11.15% combined). This estimate has since been updated to 5.1mt @ 8.7% Zn+ 2.6% Pb (11.3% combined), reflecting an adjustment to the calculation of cut-off grade. In the opinion of CSA Global, the adjustment did not make a material difference to figures quoted. Note, contained metal before and after the adjustment remains at 1.3 billion lbs Zn+Pb.

 

3 G11-2638-01 was collared 98m from historic hole TC-2638-045 (vertical) which intersected an interpreted true width of 7.45m of 19.2% Zn, 8.5% Pb (27.8% combined) and 6.6 g/t Ag, starting at a depth of 209.1m. Group Eleven estimates the mineralized intercept in G11-2638-01 is 10-20m away from the intercept in hole TC-2638-045.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLGGURAQUPRGGR
Date   Source Headline
19th Oct 20118:16 amRNSJoint Venture Agreement
22nd Sep 20117:00 amRNSInterim Report
8th Sep 20117:00 amRNSExploration Update
28th Jul 20113:52 pmRNSResult of AGM
30th Jun 20117:00 amRNSAnnual Report and Accounts
28th Jun 20117:00 amRNSChange of Adviser
22nd Jun 20117:00 amRNSFinal Results
25th May 20117:00 amRNSDrilling Update
31st Mar 201111:19 amRNSTotal Voting Rights
14th Mar 20117:00 amRNSDrilling Update
25th Feb 20117:00 amRNSPlacing of new shares
24th Feb 20117:00 amRNSDrilling Update
15th Dec 20107:00 amRNSDrilling Update
30th Sep 20107:00 amRNSHalf Yearly Report
27th Jul 201011:37 amRNSTR-1: Notification of major interest in shares
26th Jul 20104:51 pmRNSChange of Adviser
26th Jul 20102:56 pmRNSTotal Voting Rights
26th Jul 201012:00 pmRNSAGM Statement
20th Jul 20107:00 amRNSDrilling Update
9th Jul 201012:26 pmRNSIssue of Equity
30th Jun 201010:01 amRNSAnnual Report and Accounts
24th Jun 20107:00 amRNSFinal Results
21st Jun 20108:39 amRNSDrilling Update
8th Jun 20103:25 pmRNSDirectorate Change
23rd Apr 20107:00 amRNSDrilling Update
2nd Mar 20107:00 amRNSDrilling Update
20th Jan 20107:00 amRNSDrilling Update
9th Oct 20095:14 pmRNSOffer Update
25th Sep 20095:58 pmRNSOffer Update
23rd Sep 20097:00 amRNSHalf Yearly Report
21st Sep 20097:00 amRNSOffer Update
16th Sep 20093:51 pmRNSDirectorate Change
16th Sep 20091:22 pmRNSApplication for cancellation of listing
16th Sep 20097:00 amRNSOffer Wholly Unconditional
11th Sep 20094:58 pmRNSOffer Update
4th Sep 20097:00 amRNSDrilling Update
25th Aug 20097:00 amBUSHolding(s) in Company
21st Aug 20094:34 pmRNSOffer Document Posted
19th Aug 200912:03 pmPRNRule 8.1 - Arc International Plc
18th Aug 20097:00 amRNSRecommended Cash Offer
12th Aug 200910:03 amBUSRule 8.3 - Arc International
11th Aug 200910:07 amBUSRule 8.3 - Arc International
7th Aug 200911:02 amBUSRule 8.3 - Arc International
5th Aug 20097:00 amRNSInterim Results
4th Aug 20091:07 pmRNSRule 8.3- Arc International Plc
4th Aug 20099:00 amRNSARC & Sitel Collaboration
30th Jul 20092:11 pmRNSRule 8.3- ARC International Plc
29th Jul 20094:35 pmRNSPrice Monitoring Extension
29th Jul 200911:44 amRNSStmnt re Share Price Movement
28th Jul 20099:00 amRNSUniversity of Edinburgh Development

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.