The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.275
Bid: 0.25
Ask: 0.30
Change: 0.00 (0.00%)
Spread: 0.05 (20.00%)
Open: 0.275
High: 0.275
Low: 0.275
Prev. Close: 0.275
ARK Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

32.2% Zinc + Lead combined over 5.4m at Stonepark

18 Jun 2018 13:01

RNS Number : 7363R
Connemara Mining Company plc
18 June 2018
 

18 June 2018

 

Connemara Mining Company plc

("Connemara" or the "Company")

 

First new hole at Stonepark intersects 32.2% combined Zinc and Lead over 5.4m

 

Connemara Mining Company plc (LON: CON), the Irish gold and zinc exploration company, is pleased to announce results from hole G11-2638-01 at the Stonepark Zinc Project ("Stonepark"). This hole was drilled into a key area of known high-grade mineralisation on the presumed eastern edge of the recently announced maiden Inferred Mineral Resource Estimate (RNS dated 17 April 2018). Connemara's joint venture partner, Group Eleven Resources Corp. ("Group Eleven"), is the project operator.

 

Highlights:

· G11-2638-01 intersected 5.40m of 25.0% zinc and 7.2% lead (32.2% Zn+Pb combined) and 12.2 g/t silver (true width is estimated at 4.9m), verifying one of the high-grade zones within the Stonepark Resource;

· Robust mineralisation interpreted to be open eastwards toward Glencore's neighbouring Pallas Green deposit1.

 

Patrick Cullen, Chief Executive Officer of Connemara, commented: "We are very pleased with these grades from the first new hole at Stonepark since 2012 and with progress following on from the recent announcement of a maiden Resource. The results underline the high grade nature of the deposit.

 "The decision to drill inclined holes has yielded immediate results by giving better structural information. This has opened the deposit eastwards, presenting opportunity to increase the Resource towards Glencore's Pallas Green deposit.

"The strategic value of the location of Stonepark should not be overlooked, it lies adjacent to Pallas Green. These deposits are Ireland's two largest undeveloped zinc-lead Resources by metal contained."

 

Stonepark Zinc Project

The Stonepark Zinc Project is a joint venture between Connemara (23.44% interest) and Group Eleven (76.56% interest). The NI43-101 independent report on Stonepark has been uploaded to SEDAR by partner Group Eleven and a copy of this report is available on the Connemara website.

A maiden Inferred Mineral Resource at Stonepark (which has been updated) totaling 5.1 million tonnes at 11.3% Zn+Pb combined (8.7% Zn and 2.6% Pb)2.

Glencore's nearby Pallas Green deposit contains 44.2 million tonnes of 7.2% Zn + 1.2% Pb (8.4% combined) in the Inferred Category (Glencore Resources & Reserves, 31 December 2017). Based on the above disclosures, the Stonepark deposit is shallower and higher-grade than the Pallas Green deposit.

 

Further Details

 

The re-evaluation of interpretations supporting the recent Resource estimate at the Stonepark project demonstrated that near-vertical faults had been historically used to define the boundaries of mineralisation. The presence of these faults, however, was never adequately tested, reflecting the fact most drilling at Stonepark was vertical.

 

Angled hole G11-2638-01 was drilled to test one of these faults previously thought to truncate the eastern side of high-grade mineralisation and separate Stonepark from Glencore's adjoining Pallas Green property located approximately 1km to the east. The hole first verified a lobe of the Inferred Resource envelope (described above), then continued to the east but never encountered the postulated fault. This suggests Stonepark mineralisation is indeed open to the east towards the Pallas Green deposit, increasing the prospectivity of Stonepark and highlighting its importance in the larger regional system.

 

Hole G11-2638-01 was diamond drilled to a depth of 456m with an azimuth of 065° and dip of -65°. Core was oriented using a Reflex Act II tool. This hole intersected mineralisation close to an historic hole3 hosting similar thickness and grade.

 

Exhibit 1. Results from hole G11-2638-01 at Stonepark Project, Ireland

From

To

Interval

Zinc

Lead

Zinc+Lead

Silver

(m)

(m)

(m)

(%)

(%)

(%)

(g/t)

234.05

239.45

5.40

24.97

7.20

32.17

12.22

Source: Group Eleven Resources Corp. Note: This intercept is not true width but estimated to be about 90%, assuming mineralisation is sub-horizontal as per the Inferred Mineral Resource Estimate dated 26 April 2018.

 

A second zone of much weaker sulphide mineralisation (approximately 8.75m in down-hole thickness) was intersected 18.7m below the main intercept described above. Assays are expected over the next 1-2 weeks. This second zone is another indication that drilling is still very much within the mineralising system.

 

Quality Assurance / Quality Control (QA/QC)

 

Drill-core samples were prepared and assayed in the ALS Minerals' OMAC Laboratory in Loughrea, Ireland. Samples were fine-crushed (CRU-31) to 70% < 2mm and pulverized and riffle-split to 85% < 75 µm. Zinc, lead and silver assays were obtained by multi-acid (4-acid) digestion/ICP-AES Package (48 Elements). Ore grade samples were analyzed by code MS61 multi-element and OG62 standard ore-grade. Two samples assaying greater than 30% zinc were analyzed under code OG62h. Analytical accuracy and precision are monitored by the submission of a blank and a standard inserted into the sample train of 17 samples by Group Eleven personnel. No duplicate samples were sent to the lab. ALS inserted four standards, one blank and ran two pulp duplicates for MS61 and OG-62 and three standards, one blank and one pulp duplicate for OG62h.

 

This announcement has been reviewed and approved by Gavin Berkenheger (CGeol) in his capacity as the Qualified Person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies issued by the London Stock Exchange.

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

 

Information for Editors:

Connemara is a diversified exploration company with principal assets in gold and zinc exploration licences across Ireland. Connemara currently holds interests in a total of 39 licences, including joint ventures with Teck at the Oldcastle Zinc Project and with Group Eleven Resources Corp at the Stonepark Zinc Project.

 

Further information can be sourced from the Company website: www.connemaramc.com

 

ENDS

 

Enquiries:

 

Connemara Mining Company Plc

John Teeling, Chairman

+353 (0) 1 833 2833

Patrick Cullen, CEO

+353 (0) 87 272 1748

+44 (0) 755 237 8208

Northland Capital Partners Limited

Matthew Johnson / Edward Hutton

+44 (0) 203 861 6625

John Howes

First Equity Limited

Jason Robertson

+44 (0) 207 374 2212

Blytheweigh

+44 (0) 207 138 3204

Nick Elwes

+44 (0) 783 185 1855

Simon Woods

+44 (0) 781 784 1793

Teneo PSG

Luke Hogg

+353 (0) 1 661 4055

Alan Tyrrell

+353 (0) 1 661 4055

 

 

[1] 44.2 million tonnes of 7.2% Zn+ 1.2% Pb in the Inferred Category (Glencore; 31 December 2017)

 

2 Connemara's RNS news release dated April 17, 2018 relied on CSA Global's original Mineral Resource Estimate of 5.3Mt @ 8.55% Zn + 2.60% Pb (11.15% combined). This estimate has since been updated to 5.1mt @ 8.7% Zn+ 2.6% Pb (11.3% combined), reflecting an adjustment to the calculation of cut-off grade. In the opinion of CSA Global, the adjustment did not make a material difference to figures quoted. Note, contained metal before and after the adjustment remains at 1.3 billion lbs Zn+Pb.

 

3 G11-2638-01 was collared 98m from historic hole TC-2638-045 (vertical) which intersected an interpreted true width of 7.45m of 19.2% Zn, 8.5% Pb (27.8% combined) and 6.6 g/t Ag, starting at a depth of 209.1m. Group Eleven estimates the mineralized intercept in G11-2638-01 is 10-20m away from the intercept in hole TC-2638-045.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLGGURAQUPRGGR
Date   Source Headline
25th Nov 20197:00 amRNSStonepark Strategic Review
19th Nov 201912:38 pmRNSDirector Resignation
13th Nov 20191:00 pmRNSNew Prospective Features Identified at Stonepark
16th Oct 20197:00 amRNSStonepark partner receives funding from Glencore
27th Sep 20197:00 amRNSInterim Statement for period ended 30 June 2019
17th Sep 20197:00 amRNSNew Gold Target at Inishowen
24th Jul 20192:17 pmRNSResults of Annual General Meeting
24th Jul 20197:00 amRNSSignificant Gold Anomalies at Mine River Project
27th Jun 20197:00 amRNSPosting of Annual Report and Notice of AGM
24th Jun 20197:00 amRNSFinal Results for the Year Ended 31 December 2018
7th May 20191:00 pmRNSNew Mineralisation at Stonepark Zinc Project
1st Apr 20194:14 pmRNSTotal Voting Rights
21st Mar 20194:10 pmRNSChange of Name and Update
12th Mar 20193:24 pmRNSHolding(s) in Company
12th Mar 201912:37 pmRNSResult of EGM
5th Mar 201912:31 pmRNSFundraising of £230,000
12th Feb 20197:00 amRNSProposed Change of Name
24th Jan 20191:00 pmRNSExploration Update at Stonepark Zinc Project
21st Jan 20197:00 amRNSChange of Nominated Adviser and Broker
24th Oct 20181:00 pmRNSFurther Drilling at Stonepark Zinc Project
26th Sep 20187:00 amRNSInterim Report
30th Jul 20187:00 amRNSHolding(s) in Company
25th Jul 20181:32 pmRNSResults of Annual General Meeting
5th Jul 20187:00 amRNSDirector/PDMR shareholding
4th Jul 20187:00 amRNSDrilling Recommences at Oldcastle Zinc Project
29th Jun 20187:00 amRNSPosting of Annual Report and Notice of AGM
25th Jun 201811:23 amRNSMine River Exploration Update
22nd Jun 20187:00 amRNSFinal Results for the Year Ended 31 December 2017
18th Jun 20181:01 pmRNS32.2% Zinc + Lead combined over 5.4m at Stonepark
17th Apr 20182:58 pmRNSMaiden Resource at Stonepark Zinc Project
17th Apr 20187:00 amRNSUK Investor Show 21st April 2018
28th Mar 20187:00 amRNSDrilling Commences at Mine River Gold Project
26th Mar 20187:00 amRNSBusiness Strategic Update
21st Mar 201810:50 amRNSHolding(s) in Company
16th Mar 20182:14 pmRNSInvestor Presentation
15th Mar 20184:23 pmRNSHolding(s) in Company
15th Mar 20189:44 amRNSHolding(s) in Company
9th Mar 20187:00 amRNSDrilling to Commence at the Stonepark Zinc Project
26th Feb 20187:00 amRNSStrategic Financing and Board Restructuring
11th Jan 20187:13 amRNSProspecting Update - Wicklow/Wexford Gold Project
2nd Jan 20182:55 pmRNSHolding(s) in Company
21st Dec 20177:00 amRNSUpdate on Gold Drilling and Field Exploration
16th Nov 20179:52 amRNSGold Drilling to Commence at Mine River
9th Nov 20171:37 pmRNSHolding(s) in Company
9th Nov 20178:52 amRNS14.25g/t gold over 0.5m at Inishowen
27th Oct 20177:00 amRNSDrilling Completed at Inishowen
25th Oct 20172:29 pmRNSHolding(s) in Company
19th Oct 201711:50 amRNSHolding(s) in Company
19th Oct 20177:00 amRNSAcquisition Increases Wicklow Gold Strike Length
17th Oct 201710:14 amRNSReport On Stonepark Zinc Published

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.