The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAngus Energy Regulatory News (ANGS)

Share Price Information for Angus Energy (ANGS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.425
Bid: 0.40
Ask: 0.45
Change: 0.00 (0.00%)
Spread: 0.05 (12.50%)
Open: 0.425
High: 0.425
Low: 0.425
Prev. Close: 0.425
ANGS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Brockham Oil Field FDP Addendum submitted

11 May 2017 11:00

RNS Number : 8621E
Angus Energy PLC
11 May 2017
 

11.00am 11 May 2017

Angus Energy plc

("Angus Energy", "Angus" or the "Company")

FDP Addendum submitted to start production from Brockham X4Z Kimmeridge layers

 

Angus Energy is pleased to announce that following consultation with the UK's Oil & Gas Authority (OGA) it has submitted the required Field Development Plan (FDP) Addendum to commence production from the Kimmeridge layers at its Brockham Oil Field, Production License 235. In addition to the standard HSE consent for any well operations, the FDP Addendum approval from the OGA is the sole regulatory approval required to produce hydrocarbons from the Kimmeridge layers in addition to the existing Portland production. The Company will update investors once the OGA approve the FDP Addendum.

 

Following the Company's RNS dated 10 March 2017, Angus Energy's guidance from 10 March 2017 is unchanged.

 

The various press reports have created unwarranted and groundless speculation pertaining to the BR-X4Z sidetrack, the legal status of said sidetrack and the future of production from the Brockham Oil Field. For the avoidance of any doubt following the erroneous reports, the Company has taken the precaution of obtaining additional legal review from Queen's Counsel.

 

Queen's Counsel (the "QC") has confirmed her considered view that well BR-X4 (the donor well of the X4Z sidetrack, also known as well no. 3) has planning permission until 2036. Similarly, the QC confirms that the sidetrack to Well BR-X4, drilled in January 2017, is authorised by the 2006 planning permission.

 

With the review completed, we highlight below the potential cause for any perceived misunderstanding. Although not material in its own right, a mismatch of well numbering in prior administrative paperwork provided to Angus Energy appears to have allowed some confusion to arise as to the actual operations at the Brockham Oil Field.

 

Key Facts:

 

· As stated in the Company's admission document to the AIM, it was the objective to drill a sidetrack from the BR-X4 well to ensure the continued use and production from the Portland reservoir and assess the hydrocarbon production potential from the Kimmeridge layers and Corallian section.

 

· During the preparation phase of the drilling operation, the Company detected that the surface infrastructure of the BR-X4 well did not match its expected subsurface composition but instead, based on the documentation available to the Company, appeared to be the original Brockham-X1 well. Angus Energy acquired the Brockham Oil Field in 2012 and had not re-entered either the BR-X4 or Brockham-X1 well before commencement of these operations, so this was the first time this apparent mismatch in surface and subsurface composition had come to light.

 

· In addition to necessary maintenance, re-entry of the original Brockham-X1 well also allowed for the proper assessment of the layers of interest.

 

· The Brockham site had the benefit of existing planning permissions granted by Surrey County Council (SCC) and the required approvals from the EA, HSE and OGA for the maintenance work, re-entry and/or planned sidetrack, therefore the subsurface assessment continued. The re-entry with Measurement While Drilling (MWD) tools confirmed that the well that had been entered was indeed BR-X4 rather than Brockham-X1.

 

· Best practices for operational safety dictated that only when operations were finished and the well was safely cased off could the Company determine the root cause of the well numbering confusion. Angus Energy determined that the mismatch was caused by an undocumented, non-standard, spool piece which was installed by the previous owners of the field and resulted in the 'mislabelling' of the well head.

 

· No matter the determination by the Company, whether it was a re-entry of Brockham-X1 or a sidetrack of BR-X4, either operation was fully permitted within the Company's regulatory approvals from the relevant authorities. It should be noted, that a sidetrack is a component of a drilled well. It is not a well and cannot be created or exist independent of the actual well.

 

· Angus Energy has been transparent throughout its operations. As such, it apprised the SCC of the documentation discrepancy as discovered during the January operations.

 

· Prior to the confusion over well numbering, in December 2016, the County Council gave advice that any new well was not to be drilled into 'any different geological formations or to a deeper depth or into any undrilled area than already drilled to'''. The geological area of interest was already drilled and defined by our existing permits for the wells and their inclusive sidetracks. Taken in the context of our actual communications, this letter is unrelated to our operations in January.

 

For reference, the original Brockham-X1 well was drilled by BP to a total depth of 2,070m Total Vertical Depth (TVD) while the X4Z sidetrack only reached a depth of 1,391m TVD. Well within the constraints of the existing geological envelope of operations.

 

· Despite the misleading press reports, no new well was drilled nor were any operations conducted into any different geological formations, at a deeper depth or in any undrilled area.

 

Upon OGA approval the Company plans to put this well into production as soon as possible.

 

Paul Vonk, Angus Energy's Managing Director commented:

 

"It is regrettable that some confusion did arise from the discrepancy in well numbering, however Angus have drilled the Brockham-X4Z well in a fully authorised manner under the planning permissions already granted and in existance and with full approvals necessary by the relevant governing authorities. Angus Energy dutifully operates under strict supervision from all our regulators. During this entire matter, Angus Energy did just that, within both the spirit and letter of the law. Our operations will always be performed using best practices for oil field safety and the environment. This is the ethos of Angus Energy.

 

We very much look forward to starting oil production at Brockham from the Kimmeridge layers for the first time in the Weald Basin. This is an exciting chapter for the Company in the long history of onshore UK oil production."

 

END.

Enquiries:

Angus Energy Plc

Jonathan Tidswell-Pretorius / Paul Vonk

Tel: +44 (0) 208 899 6380

Beaumont Cornish (NOMAD)

James Biddle/ Roland Cornish

Tel: +44 (0) 207 628 3396

www.beaumontcornish.com

Optiva Securities Limited (BROKER)

Jeremy King/ Ed McDermott

Tel: +44 (0) 203 137 1902

Abchurch

Tim Thompson

Tel: +44 (0) 20 7398 7700

 

About Angus Energy plc.

Angus Energy plc. is an AIM quoted independent onshore oil and gas development company focused on leveraging its expertise to advance its portfolio of UK assets as well as acquire, manage and monetise select projects. Angus Energy owns the majority interest and operates conventional oil production fields in Brockham (PL 235) and Lidsey (PL 241).

 

Full details on the PL235 and PL 241 licences are set out in the Company's AIM Admission document dated 12 November 2016.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFMGMKLMRGNZG
Date   Source Headline
24th Jun 20197:00 amRNSNotice of Investor Conference Call
24th Jun 20197:00 amRNSHalf-year Report
19th Jun 201910:01 amRNSAcquisition of Interest in Saltfleetby Gas Field
3rd Jun 20192:05 pmRNSSecond Price Monitoring Extn
3rd Jun 20192:00 pmRNSPrice Monitoring Extension
3rd Jun 20197:00 amRNSBrockham Operations Update
29th May 20197:00 amRNSResults of Open Offer
10th May 20199:30 amRNSBrockham Operations Update
10th May 20197:00 amRNSOpen Offer Circular published
3rd May 20197:00 amRNSBrockham Operations Update
30th Apr 20199:26 amRNSResult of Placing
30th Apr 20197:00 amRNSProposed Placing and Open Offer
25th Apr 20196:30 pmRNSBrockham Operations Update
18th Apr 20197:00 amRNSCompletion of Acquisition of Lidsey interest
10th Apr 201910:00 amRNSOperations Update: Brockham
5th Apr 20194:45 pmRNSOperations Update: Brockham
3rd Apr 20197:00 amRNSOperations Update & Schedule of Works at Brockham
2nd Apr 20194:49 pmRNSTotal Voting Rights
29th Mar 201911:53 amRNSResult of AGM
21st Mar 201912:00 pmRNSOperations Update: Rig Contract for Brockham
18th Mar 20194:41 pmRNSSecond Price Monitoring Extn
18th Mar 20194:36 pmRNSPrice Monitoring Extension
14th Mar 20197:00 amRNSSPA signed regarding additional interest in Lidsey
14th Mar 20197:00 amRNSUpdate on PEDL 143 (Holmwood)
7th Mar 20197:00 amRNSNotice of AGM
6th Mar 20193:15 pmRNSBoard Changes
6th Mar 20197:00 amRNSAnnual Financial Report
26th Feb 20194:45 pmRNSOperations and Lidsey Field Interest Update
19th Feb 201910:27 amRNSVariation to Planning Consent at Lidsey
15th Feb 20197:00 amRNSEquity Placing
14th Feb 20197:00 amRNSUpdate to Financing Arrangement
8th Feb 20195:27 pmRNSBalcombe Update and Holdings in Company
8th Feb 20194:41 pmRNSSecond Price Monitoring Extn
8th Feb 20194:35 pmRNSPrice Monitoring Extension
4th Feb 20197:00 amRNSBrockham Well Test Update
29th Jan 20194:40 pmRNSSecond Price Monitoring Extn
29th Jan 20194:35 pmRNSPrice Monitoring Extension
29th Jan 20197:00 amRNSRetraction of Requisition of GM & Board Changes
10th Jan 20194:41 pmRNSSecond Price Monitoring Extn
10th Jan 20194:35 pmRNSPrice Monitoring Extension
10th Jan 20192:06 pmRNSSecond Price Monitoring Extn
10th Jan 20192:00 pmRNSPrice Monitoring Extension
10th Jan 201911:05 amRNSSecond Price Monitoring Extn
10th Jan 201911:00 amRNSPrice Monitoring Extension
10th Jan 20197:00 amRNSOperations update, Financing, GM requisition
19th Dec 20187:00 amRNSOperations update
21st Nov 201812:19 pmRNSReplacement: Result of General Meeting
21st Nov 201811:57 amRNSResult of General Meeting
5th Nov 20189:05 amRNSSecond Price Monitoring Extn
5th Nov 20189:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.