Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0625
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.015 (27.273%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.0625
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

12 Nov 2019 07:00

RNS Number : 0416T
Alba Mineral Resources PLC
12 November 2019
 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Horse Hill-2z Horizontal Well - Completion of Drilling Campaign

 

Alba Mineral Resources plc (AIM: ALBA), the diversified mineral exploration and development company, is pleased to announce that it has received the following update from UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and PEDL 246 in which Alba has an 11.765% interest:

 

·; The Horse Hill-2z ("HH-2z") Portland horizontal drilling campaign has been successfully completed.

 

·; A total of approximately 2,500 ft of horizontal trajectory was drilled wholly within the Portland reservoir's most oil productive zone or "sweet spot".

 

·; Because of the good, clean horizontal trajectory, together with the continued indications of possible improved reservoir quality, it was decided that there was little technical or economic merit in pursuing drilling to the maximum planned c. 3,000 ft horizontal trajectory.

 

·; Following the completion of a comprehensive electric logging programme, HH-2z is now being prepared for an extensive extended well test ("EWT") programme, expected to commence in the coming weeks. The EWT, which will include the use of a high-capacity/high-rate downhole electric pump or "ESP", is planned over a minimum 90-day flow period, following which HH-2z and HH-1 will be retained and converted into long-term oil production wells.

 

·; Oil production from the HH-1 EWT has continued throughout HH-2/2z drilling and will also continue in parallel with the HH-2z EWT. Total HH-1 test production now stands at over 77,200 barrels.

 

·; Analysis and integration of the comprehensive core, cuttings and electric log data suites acquired in both the HH-2 pilot and HH-2z horizontal continues and any impactful results will be reported in due course.

 

George Frangeskides, Executive Chairman, commented: "We are pleased to be able to report on the successful completion of this drilling campaign at the Horse Hill Oil Field."

 

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

 

Qualified Person's Statement

The technical information contained in this announcement has been reviewed and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial College London), a petroleum geologist with over 45 years' experience in the management, exploration, development and production of oil and gas.

 

Glossary

 

horizontal well a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon;

 

oil field an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface; and

 

well test or "flow test", involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate and volumes.

 

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman

+44 20 3907 4297

 

 

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray

+44 20 7213 0880

 

 

 

First Equity Limited (Broker)

Jason Robertson

+44 20 7374 2212

 

 

 

Yellow Jersey PR (Financial PR/ IR)

Sarah Hollins/Harriet Jackson/Henry Wilkinson

alba@yellowjerseypr.com

+44 20 3004 9512

 

 

 

 

Alba's Project and Investment Portfolio

Project (commodity)

Location

Ownership

Mining Projects

Amitsoq (graphite)

Greenland

90%

Clogau (gold)

Wales

90%

Inglefield (copper, cobalt, gold)

Greenland

100%

Limerick (zinc-lead)

Ireland

100%

Melville Bay (iron ore)

Greenland

51%

TBS (ilmenite)

Greenland

100%

Oil & Gas Investments

Brockham (oil)

England

5%

Horse Hill (oil)

England

11.765%

 

 

 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLFFEFLSLLLIA
Date   Source Headline
23rd Dec 202011:00 amRNSPrice Monitoring Extension
22nd Dec 20207:10 amRNSHorse Hill Update
21st Dec 20207:00 amRNSSurface Drilling & Pilot Plant Update at Clogau
18th Dec 20202:49 pmRNSExercise of Share Warrants
17th Dec 20207:00 amRNSPhase 1 Surface Trenching Over Dolgellau
8th Dec 20207:00 amRNSBoard Changes
2nd Dec 20207:00 amRNSUnderground Drilling Update at Clogau Gold Mine
25th Nov 20201:03 pmRNSExercise of Warrants
25th Nov 20209:05 amRNSSecond Price Monitoring Extn
25th Nov 20209:00 amRNSPrice Monitoring Extension
25th Nov 20208:00 amRNSShare Placing
24th Nov 20201:03 pmRNSCommencement of Surface Trenching
20th Nov 20209:05 amRNSSecond Price Monitoring Extn
20th Nov 20209:00 amRNSPrice Monitoring Extension
20th Nov 20207:00 amRNSAward of Exploration Licence and Clogau Update
19th Nov 20204:28 pmRNSExercise of Share Warrants
13th Nov 20201:38 pmRNSHorse Hill Update
5th Nov 20202:40 pmRNSHorse Hill Update
3rd Nov 202010:37 amRNSClogau Gold Mine: Update on Work Activities
28th Oct 20207:00 amRNSAppointment of Chief Operating Officer
21st Oct 20207:00 amRNSUpdate on Underground Programme at Clogau Mine
20th Oct 20207:00 amRNSExercise of Share Warrants
19th Oct 20207:00 amRNSExercise of Share Warrants
16th Oct 202011:05 amRNSSecond Price Monitoring Extn
16th Oct 202011:00 amRNSPrice Monitoring Extension
14th Oct 20207:00 amRNSExercise of Share Warrants
13th Oct 20209:59 amRNSUpdate on Work Activities at the Clogau Gold Mine
12th Oct 20207:00 amRNSAlba Terminates Bergen Investment Facility
9th Oct 202011:05 amRNSSecond Price Monitoring Extn
9th Oct 202011:00 amRNSPrice Monitoring Extension
9th Oct 20209:00 amRNSPrice Monitoring Extension
8th Oct 20207:00 amRNSThule Black Sands Ilmenite Project Update
5th Oct 20207:05 amRNSExercise of Share Warrants
5th Oct 20207:00 amRNSUpdate on Work Activities at Clogau
29th Sep 202011:06 amRNSSecond Price Monitoring Extn
29th Sep 202011:00 amRNSPrice Monitoring Extension
28th Sep 20209:05 amRNSSecond Price Monitoring Extn
28th Sep 20209:00 amRNSPrice Monitoring Extension
25th Sep 20203:19 pmRNSTermination of Broker Appointment
25th Sep 20202:05 pmRNSSecond Price Monitoring Extn
25th Sep 20202:00 pmRNSPrice Monitoring Extension
23rd Sep 20207:08 amRNSSecond Price Monitoring Extn
23rd Sep 20207:03 amRNSPrice Monitoring Extension
22nd Sep 202011:05 amRNSSecond Price Monitoring Extn
22nd Sep 202011:00 amRNSPrice Monitoring Extension
21st Sep 202011:05 amRNSSecond Price Monitoring Extn
21st Sep 202011:00 amRNSPrice Monitoring Extension
21st Sep 20209:05 amRNSSecond Price Monitoring Extn
21st Sep 20209:00 amRNSPrice Monitoring Extension
21st Sep 20207:00 amRNSShare Placing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.