We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Alba Acquires Option Over Andover West Lithium Project in Western Australia

 Alba Acquires Option Over Andover West Lithium Project in Western Australia

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.07
Bid: 0.065
Ask: 0.075
Change: 0.00 (0.00%)
Spread: 0.01 (15.385%)
Open: 0.07
High: 0.07
Low: 0.07
Prev. Close: 0.07
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Surface Drilling & Pilot Plant Update at Clogau

21 Dec 2020 07:00

RNS Number : 2539J
Alba Mineral Resources PLC
21 December 2020
 

Click on or paste the following link into your website browser to view the associated PDF document (including maps and images): 

http://www.rns-pdf.londonstockexchange.com/rns/2539J_1-2020-12-20.pdf

 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Surface Drilling Update & Pilot Plant Installation

Clogau-St David's Gold Mine

 

Alba Mineral Resources plc (AIM: ALBA) is pleased to provide an update on the Company's work activities at the Clogau-St David's Gold Mine.

 

Key Points

· Surface Drilling Update

o Three drill holes have been completed for 399.6 metres, with a fourth hole so far drilled to 54.6 metres.

o Completed holes LL001-LL003 have intersected significant quartz veins, a total of 6.48 metres in LL001, 3.65 metres in LL002 and 5.7 metres in LL003.

o With each of the three completed holes hitting significant veins within about a 15-metre zone of one another (at 83.5m for LL001, 96.3 m for LL002 and 84.9 m for LL003), the Company believes this to indicate the presence of a vein system some 30 metres below the deepest previously worked zone at the Llechfraith mine area.

o Further, deeper holes will be drilled to test the depth extent of this vein system.

· Pilot Processing Plant Installation

o The remaining key items of plant have now been installed in the Clogau-St David's Gold Mine building, notably the impact crusher and gold concentrator.

 

Surface Drilling

 

The Company's surface drilling campaign, which commenced in early November, has progressed well. To date, three holes (LL001-LL003) have been completed for 399.6 metres (see Table 1). The fourth drill hole, LL004, has been drilled to 54.6 metres and will be completed after the resumption of drilling in early January 2021.

 

This drill programme has been designed to target mineralisation below the existing mine workings at the Llechfraith mine area (see Figures 5 and 6 in the PDF version of this RNS), thus testing the continuation of mineralisation at depth. This zone was previously successfully targeted during Alba's drilling programme in November 2019. Both main drill holes completed in that programme, GMOW002 and GMOW003, intersected a sequence of intrusive greenstones or microdiorite followed by a shear zone dominated by intermixed Clogau shale and quartz veining, this being the known gold-bearing geological setting at the Llechfraith mine area.

 

By stepping out the drilling so that the drill collar was set further away from the mine area, the current phase of drilling has been designed to intersect the quartz vein at a higher, and therefore more favourable, angle to dip. This has so far proved successful (see Figures 5 and 6 in the PDF version of this RNS), given the significant widths of quartz vein which have been intersected. LL001 has intersected a total of 6.48 metres of quartz veins, LL002 a total of 3.65 metres and LL003 a total of 5.7 metres.

Table 1 refers to certain of the quartz veins as forming part of the "Llechfraith Lode System", to indicate veins which have been intersected in the same zone as one another within the Llechfraith mine area. With each of the three completed holes hitting significant veins within about a 15-metre zone of one another (at 83.5m for LL001, 96.3m for LL002 and 84.9m for LL003), the Company's technical team are working on the modelling of these vein intercepts within the existing 3D geological model for Clogau-St David's to show the extent of the identified pay shoot.

 

The photographs at Figures 2 to 4 in the PDF version of this RNS show key intercepts of the Llechfraith lode in drill holes LL001-003.

 

 

Table 1: Summary of completed drill holes including notable structural intercepts

 

Hole

Azimuth

Dip

Length (m)

Structural Intercepts

 

 

 

 

Type

Width (m)

Depth (m)

GMOW LL001

351

45

183.5

Quartz Vein

0.15

48.3

 

 

 

 

Quartz Vein

0.36

56.78

 

 

 

 

Quartz Vein

0.62

60.23

 

 

 

 

Quartz Vein

0.8

63.2

 

 

 

 

LLechfraith Lode System

2.3

83.5

 

 

 

 

LLechfraith Lode System

2.25

95.3

 

 

 

 

Total

6.48

 

GMOW LL002

353

45

103.3

Quartz Vein

0.47

48.05

 

 

 

 

Quartz Vein

0.25

53.3

 

 

 

 

Quartz Vein

0.22

56.63

 

 

 

 

Quartz Vein

0.4

59.01

 

 

 

 

Quartz Vein

0.21

65.68

 

 

 

 

Llechfraith Lode System

2.1

96.3

 

 

 

 

Total

3.65

 

GMOW LL003

340

45

112.8

Llechfraith Lode System

1.6

84.9

 

 

 

 

Llechfraith Lode System

1.5

88.15

 

 

 

 

Llechfraith Lode System

2.1

96

 

 

 

 

Llechfraith Lode System

0.5

101.5

 

 

 

 

Total

5.7

 

Grand Total

 

 

399.6

 

15.83

 

 

 

Drilling has now paused for the Christmas period, and is scheduled to recommence in the first week of January. According to current Government advice, the increased public health measures announced by the Welsh Government on 19 December 2020 will not affect the Company's ability to continue its ongoing activities in the field.

 

Upon resumption of drilling, drill hole LL004 will be completed first, followed by the drilling of two further planned holes, LL005 and LL006, seeking to intersect the projected pay shoot some 20 metres or so below the intercepts for drill holes LL001-LL004 (see Figures 5 and 6 in the PDF version of this RNS).

 

The core recovered from this phase of surface drilling will not be cut and sent to an accredited laboratory for assaying until all holes in this phase have been completed.

Once this phase has been completed, as announced on 2 December 2020 the next phase of surface drilling (Phase 2) will consist of an 8-10 hole programme for around 2,000 metres. This phase of drilling will target the 550m Main Lode extension indicated by the recently completed underground drilling and will also seek to intersect the projected depth extensions of certain historically worked lodes, namely Grandfathers Lode and the 7-10 Lode.

 

Pilot Gold Processing Plant

 

All items of plant for the Company's bespoke pilot processing plant ordered from Appropriate Process Technologies (APT) in South Africa have now been cleared through UK customs and delivered to Alba's mine building at the Clogau-St David's Gold Mine, where it has been assembled by Alba's technical team. Notably, this includes an impact crusher capable of processing 3 tonnes per hour and a gold concentrator capable of processing 1.5 tonnes per hour. The other key items of plant, notably the jaw crusher and Wilfley Table, were already in situ in the Clogau-St David's Gold Mine building.

 

Following electrical connection and safety testing of the pilot plant, the Company now expects to commence operation of the pilot plant by mid-January 2021 onwards.

 

All activities and timelines in this announcement are subject to the timely receipt of regulatory and other third-party consents and to the timely availability of contractors, plant and equipment.

 

George Frangeskides, Alba's Executive Chairman, commented:

"Our drilling programme continues to generate very positive results. Having previously identified in our underground drilling a 550 metre projected extension to the Main Lode, our surface drilling has now identified a new vein system some 30 metres below the deepest historically mined section of the Llechfraith mine area, the No.4 Level. This new zone will now be further tested by the completion of drill hole LL004 in January and by the drilling of at least two, even deeper holes."

 

"As for our pilot processing plant, all remaining items of plant have now been imported, delivered to site and assembled. We expect to be able to run the first batch of material through the plant next month."

 

"This year has been a difficult one for everyone, on both a professional and a personal level. At Alba, I would like to pay credit to our dedicated employees and contractors who have moved heaven and earth so that we can deliver on our promise to move Clogau-St David's forward at pace. It is worth remembering that it was only in late July that we were able to return to work in the field, meaning that some seven months of 2020 were effectively lost to the coronavirus pandemic lockdown. As such, in my view what has been achieved in the space of just the last five months is nothing short of astounding, including:

 

- The collection of a 36-tonne bulk sample from several target sites underground;

 

- The completion of further important in-mine safety and rehabilitation works, notably the restoration of several hundred metres of airline;

 

- The drilling of 7 separate targets underground for a total of 559.5 metres, with all 7 drillholes intersecting quartz veining, drillhole L002 returning significant gold assays of up to 1.79 g/t and drillholes L002 and L003 intersecting what we believe to be a 550-metre extension to the Main Lode;

 

- The completion of the first three holes of Phase 1 of the surface drilling campaign for a total of 399.6 metres, with each of the holes intersecting significant quartz veins from between 83-96 metres, indicating the presence of a vein system some 30 metres below the deepest previously worked zone at the Llechfraith mine area;

 

- The completion of the first phase of surface trenching, and this work uncovering quartz veins in several trenches including a 2.1 metre width quartz vein discovered in trench 10, comparable with the widths of the worked veins in the Clogau-St David's Gold Mine;

 

- The commissioning, delivery and installation of a bespoke pilot processing plant at the Clogau-St David's Gold Mine, which means that the Company can, from early next year, proceed to process all material it recovers from the mine at its own dedicated facility onsite;

 

- The signing of a bulk sampling lease with The Crown Estate, meaning that the Company will own any gold recovered from the processing of any and all material extracted from the Mine during the exploration phase; and

 

- The securing of the exclusive rights to the Gwynfynydd Gold Mine and surrounding exploration ground, meaning that the Alba Group not only now has the rights to the UK's two largest, by far, gold mines under its exclusive ownership, but also has the exclusive right to explore the entire length and breadth of the Dolgellau Gold Field in the search for new and completely unexploited gold deposits."

 

"These achievements put us in a very strong position as we move into 2021 and seek to complete our exploration of the Clogau-St David's Gold Mine so that we can implement our plans to bring the Mine back into commercial production as soon as possible."

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the timing and granting of regulatory and other third party consents and approvals, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events.

 

Without prejudice to the generality of the foregoing, uncertainties also exist in connection with the ongoing Coronavirus (COVID-19) pandemic which may result in further lockdown measures and restrictions being imposed by Governments and other competent regulatory bodies and agencies from time to time in response to the pandemic, which measures and restrictions may prevent or inhibit the Company from executing its work activities according to the timelines set out in this announcement or indeed from executing its work activities at all. The Coronavirus (COVID-19) pandemic may also affect the Company's ability to execute its work activities due to personnel and contractors testing positive for COVID-19 or otherwise being required to self-isolate from time to time.

 

Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

 

Competent Person Declaration

The information in this release that relates to Exploration Results has been reviewed by Mr Mark Austin. Mr Austin is a member of SACNASP (Reg. No. 400235/06), Fellow of The Geological Society and Fellow of the Geological Society of South Africa. He has a B.Sc. Honours in Geology with 38 years' experience.

 

Mark Austin has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration targets, Exploration Results, Mineral Resources and Ore Reserves', also known as the JORC Code. The JORC code is a national reporting organisation that is aligned with CRIRSCO. Mr Austin consents to the inclusion in the announcement of the matters based on his information in the form and context in which they appear.

 

Glossary

 

Clogau shales: Black pyritous and carbonaceous mudstones and silty mudstones with rare silt laminae and sparse fine-grained sandstone beds. The gold deposits of the Dolgellau Gold Belt have been shown to be related to the presence of the Clogau Formation, interactions with igneous sills, and/or reef splitting to form discrete ore shoots.

 

Greenstone: any compact, dark-green, altered or metamorphosed basic igneous rock which owes its colour to the presence of chlorite, actinolite, or epidote.

 

Impact crusher: a crusher which breaks up material by either striking it with a rapidly moving blow bar or by throwing it into a stationary anvil where it breaks upon impact. May be used as a primary, secondary or tertiary crusher.

 

Intrusives: intrusive rock, also called plutonic rock, igneous rock formed from magma forced into older rocks at depths within the Earth's crust, which then slowly solidifies below the Earth's surface, though it may later be exposed by erosion. Igneous intrusions form a variety of rock types.

 

Jaw crusher: a compression-type crusher, comprised of a fixed jaw and moving jaw positioned in a (V). The movable jaw compresses material against the fixed jaw, crushing the material to the desired size. 

 

Lode: a deposit of metalliferous ore that fills a fissure.

 

Microdiorite: a medium-grained intrusive igneous rock.

 

Pay shoot: an area within a quartz vein where gold has been concentrated into a high-grade zone.

 

Quartz Veins: a distinct sheet-like body dominantly composed of quartz hosted within a rock formation.

 

Shear zone: an important structural discontinuity surface in the Earth's crust and upper mantle.

 

Wilfley Table:  a sand table that separates heavy mineral particles from lighter gangue by means of longitudinal riffles impeding the downward flow and a horizontal reciprocating motion carrying the heavy particles off the end of the table.

 

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman

+44 20 3950 0725

 

 

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray 

+44 20 7213 0880

 

 

 

ETX Capital (Broker)

Thomas Smith

+44 20 7392 1494

 

 

 

Alba's Project and Investment Portfolio

Project (commodity)

Location

Ownership

Mining Projects

Amitsoq (graphite)

Greenland

90%

Clogau (gold)

Wales

90%

Gwynfynydd (gold)

Wales

100%

Inglefield (copper, cobalt, gold)

Greenland

100%

Limerick (zinc-lead)

Ireland

100%

Melville Bay (iron ore)

Greenland

51%

TBS (ilmenite)

Greenland

100%

Oil & Gas Investments

Brockham (oil)

England

5%

Horse Hill (oil)

England

11.765%

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFEWEFSESSEDE
Date   Source Headline
24th Apr 202411:44 amRNSAlba Acquires Option - Replacement
24th Apr 202411:16 amRNSAlba Acquires Option
2nd Apr 20249:55 amRNSDolgellau Gold Exploration Update
28th Mar 20247:00 amRNSShare Placing
22nd Mar 20247:00 amRNSClogau Gold Mine Update
22nd Feb 20248:51 amRNSClogau Gold Mine and Regional Exploration Update
7th Feb 20247:00 amRNSGreenRoc ML Application and Licence Changes
31st Jan 20247:00 amRNSGreenRoc Update
18th Jan 202412:45 pmRNSClogau Gold Mine Update
22nd Dec 20237:00 amRNSClogau Gold Mine Update
11th Dec 202310:40 amRNSHorse Hill Update
11th Dec 20237:00 amRNSGrant of Share Options
6th Dec 202312:21 pmRNSOperational and Corporate Update
1st Dec 20233:45 pmRNSHolding(s) in Company
22nd Nov 20238:51 amRNSGROC Update: Share Placing
13th Nov 20237:00 amRNSOperational Update
31st Oct 20237:07 amRNSInvestee Company Update
16th Oct 20237:00 amRNSInvestee Company Update
16th Oct 20237:00 amRNSOperational Update
9th Oct 20237:00 amRNSInvestee Company Update
18th Sep 20237:54 amRNSClogau Operational Update
24th Aug 20231:30 pmRNSLive Webinar Event
17th Aug 20237:00 amRNSHalf-year Report
16th Aug 20237:39 amRNSGROC Update - Interim Results
16th Aug 20237:17 amRNSClogau Operational Update
9th Aug 202311:00 amRNSHolding(s) in Company
2nd Aug 20237:00 amRNSGROC Update - Share Placing
27th Jul 20237:00 amRNSGROC Update - Progress at Amitsoq Graphite Project
24th Jul 202311:30 amRNSCompletion of Broker Option & Operational Update
5th Jul 20237:35 amRNSShare Placing
4th Jul 20237:00 amRNSGrant of Dewatering Permits at Welsh Gold Mine
30th May 202310:19 amRNSResult of AGM
24th May 20237:00 amRNSInvestor Q&A Hosted by VOX Markets
15th May 20237:00 amRNSGROC Update: Amitsoq, Virtual Presentation and Q&A
5th May 20234:00 pmRNSPublication of 2022 Annual Report & Notice of AGM
5th May 20237:00 amRNSFinal Results
2nd May 20233:00 pmRNSAppointment of Sole Broker
28th Mar 20238:03 amRNSHorse Hill Update
27th Mar 20237:00 amRNSOperational Update
24th Mar 20234:35 pmRNSPrice Monitoring Extension
24th Mar 20237:00 amRNSGROC Update - Full Year Results
13th Mar 20236:22 pmRNSHolding(s) in Company
6th Mar 20237:00 amRNSGROC update: MoU with Norwegian Mining Group, LNS
1st Mar 20232:00 pmRNSPrice Monitoring Extension
8th Feb 20232:05 pmRNSSecond Price Monitoring Extn
8th Feb 20232:00 pmRNSPrice Monitoring Extension
8th Feb 20237:00 amRNSGROC Update
23rd Jan 20237:00 amRNSGROC:Near Three Times Increase in Amitsoq Resource
20th Jan 20231:54 pmRNSOperational Update
20th Jan 20237:00 amRNSGROC Update - Project Updates

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.