Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.65
Bid: 2.50
Ask: 2.80
Change: 0.05 (1.92%)
Spread: 0.30 (12.00%)
Open: 2.65
High: 2.65
Low: 2.65
Prev. Close: 2.60
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2018 PRELIMINARY PRODUCTION RESULTS

16 Apr 2018 07:25

RNS Number : 9545K
Ariana Resources PLC
16 April 2018
 

 

 

 

 

 

 

16 April 2018

AIM: AAU

 

Q1 2018 PRELIMINARY PRODUCTION RESULTS

 

Ariana Resources plc ("Ariana" or "the Company"), the exploration and development company with gold mining operations in Turkey, is pleased to announce its preliminary production results for the quarter ended 31 March 2018 for the Kiziltepe Mine ("Kiziltepe" or "the Project"). Kiziltepe is part of the Red Rabbit Joint Venture ("JV") with Proccea Construction Co. and is 50% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S. ("Zenit").

 

First Quarter Preliminary Production Results*:

 

· Gold production for the quarter was 4,866 ounces, an 8% increase quarter on quarter ("QoQ").

 

· The Company maintains its full year production guidance of 20,000 ounces Au.

 

· Total ore processed for the quarter was 44,897t, consistent with expected performance.

 

· The average head grade to the plant was 3.85 g/t Au.

 

· Quarterly open pit ore mined was c. 68,600t, at an average mined grade of 4.5 g/t Au, a 37% increase in tonnes and a 32% increase in grade QoQ.

 

· Open pit total material movement for the quarter was c. 914,000t.

 

· Average metallurgical plant recovery of gold for the quarter was 95.1%.

 

* All figures are given gross with respect to the JV.

 

 

Dr. Kerim Sener, Managing Director, commented:

 

"The performance of Kiziltepe continues to exceed feasibility expectations and this quarter of production marks a solid start to 2018. First quarter gold production was 8% higher than the previous quarter, augmented by a 4% increase in gold recovery from the processing plant. During the current quarter, we are expecting output to increase further based on our 2018 mining schedule and particularly as we start to access higher grade areas of the Arzu South vein. Consequently, we are confident in delivering positively against our production guidance for 2018."

 

Q1 2018 Preliminary Production Results

 

Unit

Q1 2018 (preliminary)

Q4 2017

Q1 2017

Open Pit - material moved (wet)

Tonnes

913,666

1,284,795

n/a

Open Pit - ore mined (wet)

Tonnes

68,591

49,885

n/a

Open Pit - mined grade

g/t Au

4.50

3.41

n/a

Process plant throughput

Tonnes

44,897

45,381

n/a

Plant feed grade

g/t Au

3.85

3.79

n/a

Metallurgical recovery rate

%

95.1

91.6

n/a

Gold produced

Troy Ounces

4,866

4,501

n/a

Silver produced

Troy Ounces

30,864

35,095

n/a

 

 

The Company will publish full results for the quarter ending 31 March 2018 by early May 2018.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

Kerim Sener, Managing Director

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

Adam James / Tom Salvesen

Yellow Jersey PR Limited

Tel: +44 (0) 7544 275 882

Tim Thompson / Harriet Jackson

/ Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

 

Editors' Note

 

About Ariana Resources:

 

Ariana is an exploration and development company with mining operations focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey, the largest gold producing country in Europe. The Company is developing a portfolio of prospective licences originally selected on the basis of its in-house geological and remote-sensing database, which now contain a total of 1.6 million ounces of gold and other metals (as at end-2017). Ariana's objective is to cost-effectively add value to its projects through focused exploration and to develop its operations, primarily through well-financed joint ventures.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, form part of a 50:50 Joint Venture with Proccea Construction Co. The Kiziltepe Sector of the Red Rabbit Project is fully-permitted and is currently in production. The total resource inventory at the Red Rabbit Project and wider project area stands at c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

In north-eastern Turkey, Ariana owns 100% of the Salinbas Gold Project, comprising the Salinbas gold-silver deposit and the Ardala copper-gold-molybdenum porphyry among other prospects. The total resource inventory of the Salinbas project area is c. 1 million ounces of gold equivalent. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

 

Ends.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGURWCUPRUAQ
Date   Source Headline
24th Mar 20202:00 pmRNSPrice Monitoring Extension
24th Mar 202011:06 amRNSSecond Price Monitoring Extn
24th Mar 202011:00 amRNSPrice Monitoring Extension
24th Mar 20209:05 amRNSSecond Price Monitoring Extn
24th Mar 20209:00 amRNSPrice Monitoring Extension
19th Mar 20207:00 amRNS2020 PRODUCTION GUIDANCE
17th Mar 20201:32 pmRNSCHANGE OF AUDITOR
26th Feb 20204:33 pmRNSDirector/PDMR Shareholding
25th Feb 20202:08 pmRNSDirector/PDMR Shareholding
21st Feb 20206:27 pmRNSDirector/PDMR Shareholding
21st Feb 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
14th Feb 20207:00 amRNSDUE DILIGENCE UPDATE
22nd Jan 20207:00 amRNSHIGH-GRADE ZONES IDENTIFIED AT TAVSAN
16th Jan 20207:00 amRNSQ4 2019 PRELIMINARY PRODUCTION RESULTS
2nd Jan 20203:40 pmRNSDirector/PDMR Shareholding
31st Dec 20198:45 amRNSDirector/PDMR Shareholding
24th Dec 20197:00 amRNSDirector/PDMR Shareholding
17th Dec 20197:00 amRNSARZU SOUTH DRILLING RESULTS
9th Dec 20197:00 amRNSDUE DILIGENCE UPDATE
3rd Dec 20195:14 pmRNSHolding(s) in Company
2nd Dec 20197:00 amRNSCOPPER-GOLD PROJECTS EARN-IN
25th Nov 20192:05 pmRNSSecond Price Monitoring Extn
25th Nov 20192:00 pmRNSPrice Monitoring Extension
25th Nov 201912:27 pmRNSNON-BINDING MoU FOR SALINBAS JOINT VENTURE
22nd Nov 20197:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
18th Nov 20198:54 amRNSReplacement: ARZU NORTH DRILLING RESULTS
18th Nov 20197:00 amRNSARZU NORTH DRILLING RESULTS
14th Nov 20197:00 amRNSCORPORATE EVENTS
21st Oct 20197:00 amRNSQ3 2019 PRELIMINARY PRODUCTION RESULTS
17th Oct 20197:00 amRNSDERYA DRILLING RESULTS
16th Oct 20197:00 amRNSROYALTY AND DATABASE ACQUISITION
15th Oct 20197:00 amRNSSALINBAS GOLD PROJECT UPDATE
1st Oct 20197:00 amRNSSHAREHOLDER CALL
30th Sep 20197:00 amRNSINTERIM RESULTS
24th Sep 20197:00 amRNSNOTICE OF RESULTS AND SHAREHOLDER CALL
9th Sep 20197:00 amRNSTAVSAN PROJECT UPDATE
28th Aug 20197:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
22nd Aug 20197:00 amRNSSALINBAS GOLD PROJECT UPDATE
17th Jul 20197:00 amRNSQ2 2019 PRELIMINARY PRODUCTION RESULTS
11th Jul 20197:00 amRNSPOSITIVE DRILLING RESULTS AT SALINBAS GOLD PROJECT
28th Jun 20191:02 pmRNSResult of AGM
28th Jun 20197:00 amRNSAGM Statement
11th Jun 20191:00 pmRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION
6th Jun 20197:00 amRNSKIZILCUKUR DRILLING RESULTS
5th Jun 20194:41 pmRNSSecond Price Monitoring Extn
5th Jun 20194:35 pmRNSPrice Monitoring Extension
5th Jun 20197:00 amRNSFINAL RESULTS FOR THE YEAR 31 DECEMBER 2018
20th May 20197:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
14th May 20197:00 amRNSSALINBAS LICENCE, FORESTRY PERMITS AND DRILLING
7th May 20197:00 amRNSARZU NORTH DRILLING RESULTS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.