Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

Share Price is delayed by 15 minutes
Get Live Data
2.00    0.22 (11.70%)
Bid:
1.90
Ask:
2.10
Spread: 0.20 (10.526%)
Market Cap: £55.78m
AAU Live PriceLast checked at - London Stock Exchange

Intraday Ariana Share Chart

SALINBAS GOLD PROJECT UPDATE

15 Oct 2019 07:00

RNS Number : 8423P
Ariana Resources PLC
15 October 2019
 

 

 

 

 

 

 

15 October 2019

AIM: AAU

 

SALINBAS GOLD PROJECT UPDATE

 

Ariana Resources plc ("Ariana" or "the Company"), the exploration and development company with gold mining operations in Turkey, is pleased to announce that it has been granted a renewal of an operational licence at the Salinbas Gold Project ("Salinbas" or "the Project"). Salinbas is located in the Hot Gold Corridor and is 100% owned by Ariana through its shareholding in Greater Pontides Exploration B.V. ("GPE").

 

Highlights:

 

·; Ardala operational licence renewed for 5 years (expiring 3rd June 2024) by the General Directorate of Mining and Petroleum Affairs ("MAPEG").

 

·; Ardala operating permit increased in area substantially, covering the known extents of the Salinbas, Salinbas North and Ardala mineralisation.

 

·; All three licences (Ardala, Salinbas and Hizarliyayla) comprising the Salinbas Project are now secured as operational licences, with further renewals permissible.

 

·; Resource drilling programmes on the licences are expected to recommence from Q2 2020.

 

·; Environmental baseline and scoping studies underway.

 

 

Dr. Kerim Sener, Managing Director, commented:

 

"The renewal of this key licence for the Salinbas Project is a major milestone for the Company. The Ardala licence contains a large part of the existing Salinbas gold-silver JORC Resource and the entirety of the Resource established for the Ardala copper-gold-molybdenum porphyry. We are also particularly pleased that MAPEG has accepted our application for a significant increase in area of our operating permit, which now provides us with the right to undertake mining activities across the entire mineralised area within the licence.

 

As a result of these recent positive project developments for the Project, the Company is committing to the immediate commencement of an environmental baseline study and associated scoping work required in advance of an Environmental Impact Assessment. We are also going to undertake further drill planning so that the Company will be in a position to undertake dedicated resource drilling of this Project from Q2 2020."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

Kerim Sener, Managing Director

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

Atholl Tweedie / James Stearns

Yellow Jersey PR Limited

Tel: +44 (0) 20 3004 9512

Dom Barretto / Harriet Jackson

/ Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

Editors' Note:

 

The information in this announcement that relates to exploration results is based on information compiled by Dr. Kerim Sener BSc (Hons), MSc, PhD, Managing Director of Ariana Resources plc. Dr. Sener is a Fellow of The Geological Society of London and a Member of The Institute of Materials, Minerals and Mining and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity that has been undertaken to qualify as a Competent Person as defined by the 2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and under the AIM Rules - Note for Mining and Oil & Gas Companies. Dr. Sener consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

About Ariana Resources:

 

Ariana is an exploration and development company with mining operations focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey, the largest gold producing country in Europe. The Company is developing a portfolio of prospective licences originally selected on the basis of its in-house geological and remote-sensing database, which now contain a total of 1.6 million ounces of gold and other metals (as at end-2017). Ariana's objective is to cost-effectively add value to its projects through focused exploration and to develop its operations, primarily through well-financed joint ventures.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, form part of a 50:50 Joint Venture with Proccea Construction Co. The Kiziltepe Sector of the Red Rabbit Project is fully-permitted and is currently in production. The total resource inventory at the Red Rabbit Project and wider project area stands at c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

In north-eastern Turkey, Ariana owns 100% of the Salinbas Gold Project, comprising the Salinbas gold-silver deposit and the Ardala copper-gold-molybdenum porphyry among other prospects. The total resource inventory of the Salinbas project area is c. 1 million ounces of gold equivalent. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

Glossary of Technical Terms:

 

"JORC" the Joint Ore Reserves Committee

 

 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEAPELFEXNFFF
Date   Source Headline
29th May 202612:45 pmRNSResult of AGM and Updated Corporate Presentation
26th May 20268:30 amRNSRevised PFS for Optimised Dokwe Gold Project
26th May 20267:00 amRNSAgreement for Strategic Investment - Tranche 2 CDI
18th May 20267:00 amRNSSale of 13.6% Interest in Zenit for US$19.5m Cash
14th May 20267:00 amRNSResource Growth Potential Identified at Dokwe
7th May 20267:00 amRNSUpdate on Dokwe Project Feasibility Activities
30th Apr 20267:00 amRNSQuarterly Activities Report 31 March 2026
29th Apr 20267:00 amRNSNotice of AGM
14th Apr 20267:00 amRNSAppointment of New Non-Executive Chairman
31st Mar 202610:30 amRNSAppointment of Chief Financial Officer
31st Mar 20267:00 amRNSFinal Audited Results for the Year Ended 31 Dec 25
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
25th Feb 202612:00 pmRNSResult of GM
4th Feb 20267:00 amRNSSettlement of Outstanding Debt to RiverFort & TVR
2nd Feb 20267:00 amRNS-RAttendance at 121 Mining Investment, Cape Town
30th Jan 202611:00 amRNSQuarterly Activities Report 31 December 2025
23rd Jan 20261:32 pmRNSXinhai Strategic Investment and Notice of GM
21st Jan 20267:00 amRNSDrilling Results from Main & South Zones at Tavşan
8th Jan 20267:00 amRNSHolding(s) in Company
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
12th Dec 20257:00 amRNSDokwe Drilling Update
9th Dec 20257:00 amRNSTerm Sheet for Strategic Investment in Dokwe
3rd Dec 202511:00 amRNSTavsan First Pour
27th Nov 20257:00 amRNSKizilcukur Drilling Identifies Potential Extension
24th Nov 20259:15 amRNS-RMines and Money London Conference Attendance
13th Nov 20257:00 amRNSHigh-Grade Gold in Drilling Results at Tavsan Mine
4th Nov 20257:00 amRNSExploration Drilling Commences at >1Moz Dokwe
31st Oct 20257:00 amRNSQuarterly Activities Report
23rd Oct 20257:00 amRNSSignificant Dokwe Exploration Update
15th Oct 20257:00 amRNSRig Mobilisation for Drilling Programme at Dokwe
9th Oct 20257:00 amRNS-RPresentation at Marketopen's Investor Sundowner
8th Oct 20257:00 amRNSTavşan Mine is now Fully Operational
30th Sep 202512:00 pmRNS-RCorporate Presentation - September 2025
29th Sep 20257:00 amRNSInterim Results
16th Sep 20257:00 amRNSSummary of Projects with Drilling Planned at Dokwe
10th Sep 20257:00 amRNSCommence Trading on Australian Securities Exchange
8th Sep 202512:37 pmRNSDual Listing on ASX and Total Voting Rights
28th Aug 20257:00 amRNS-RAfrica Down Under Conference Attendance in Perth
22nd Aug 20258:45 amRNSResults of ASX Offer for Dual Listing
18th Aug 20259:30 amRNSDirector/PDMR Shareholding
15th Aug 20258:21 amRNSDual Listing – Close of ASX Offer
8th Aug 20257:00 amRNSASX Offer Open and Tavsan Update
29th Jul 202510:45 amRNSLodgement of ASX Dual Listing Prospectus
28th Jul 20258:36 amRNSDual Listing – Close of Institutional Bookbuild
14th Jul 20257:00 amRNSOperational Update: Tavsan
9th Jul 20251:35 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.