Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

Share Price is delayed by 15 minutes
Get Live Data
1.675    0.00 (0.00%)
Bid:
1.60
Ask:
1.75
Spread: 0.15 (9.375%)
Market Cap: £45.07m
AAU Live PriceLast checked at - London Stock Exchange

Intraday Ariana Share Chart

SALINBAS GOLD PROJECT UPDATE

15 Oct 2019 07:00

RNS Number : 8423P
Ariana Resources PLC
15 October 2019
 

 

 

 

 

 

 

15 October 2019

AIM: AAU

 

SALINBAS GOLD PROJECT UPDATE

 

Ariana Resources plc ("Ariana" or "the Company"), the exploration and development company with gold mining operations in Turkey, is pleased to announce that it has been granted a renewal of an operational licence at the Salinbas Gold Project ("Salinbas" or "the Project"). Salinbas is located in the Hot Gold Corridor and is 100% owned by Ariana through its shareholding in Greater Pontides Exploration B.V. ("GPE").

 

Highlights:

 

·; Ardala operational licence renewed for 5 years (expiring 3rd June 2024) by the General Directorate of Mining and Petroleum Affairs ("MAPEG").

 

·; Ardala operating permit increased in area substantially, covering the known extents of the Salinbas, Salinbas North and Ardala mineralisation.

 

·; All three licences (Ardala, Salinbas and Hizarliyayla) comprising the Salinbas Project are now secured as operational licences, with further renewals permissible.

 

·; Resource drilling programmes on the licences are expected to recommence from Q2 2020.

 

·; Environmental baseline and scoping studies underway.

 

 

Dr. Kerim Sener, Managing Director, commented:

 

"The renewal of this key licence for the Salinbas Project is a major milestone for the Company. The Ardala licence contains a large part of the existing Salinbas gold-silver JORC Resource and the entirety of the Resource established for the Ardala copper-gold-molybdenum porphyry. We are also particularly pleased that MAPEG has accepted our application for a significant increase in area of our operating permit, which now provides us with the right to undertake mining activities across the entire mineralised area within the licence.

 

As a result of these recent positive project developments for the Project, the Company is committing to the immediate commencement of an environmental baseline study and associated scoping work required in advance of an Environmental Impact Assessment. We are also going to undertake further drill planning so that the Company will be in a position to undertake dedicated resource drilling of this Project from Q2 2020."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

Kerim Sener, Managing Director

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

Atholl Tweedie / James Stearns

Yellow Jersey PR Limited

Tel: +44 (0) 20 3004 9512

Dom Barretto / Harriet Jackson

/ Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

Editors' Note:

 

The information in this announcement that relates to exploration results is based on information compiled by Dr. Kerim Sener BSc (Hons), MSc, PhD, Managing Director of Ariana Resources plc. Dr. Sener is a Fellow of The Geological Society of London and a Member of The Institute of Materials, Minerals and Mining and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity that has been undertaken to qualify as a Competent Person as defined by the 2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and under the AIM Rules - Note for Mining and Oil & Gas Companies. Dr. Sener consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

About Ariana Resources:

 

Ariana is an exploration and development company with mining operations focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey, the largest gold producing country in Europe. The Company is developing a portfolio of prospective licences originally selected on the basis of its in-house geological and remote-sensing database, which now contain a total of 1.6 million ounces of gold and other metals (as at end-2017). Ariana's objective is to cost-effectively add value to its projects through focused exploration and to develop its operations, primarily through well-financed joint ventures.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, form part of a 50:50 Joint Venture with Proccea Construction Co. The Kiziltepe Sector of the Red Rabbit Project is fully-permitted and is currently in production. The total resource inventory at the Red Rabbit Project and wider project area stands at c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

In north-eastern Turkey, Ariana owns 100% of the Salinbas Gold Project, comprising the Salinbas gold-silver deposit and the Ardala copper-gold-molybdenum porphyry among other prospects. The total resource inventory of the Salinbas project area is c. 1 million ounces of gold equivalent. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

Glossary of Technical Terms:

 

"JORC" the Joint Ore Reserves Committee

 

 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEAPELFEXNFFF
Date   Source Headline
8th Apr 20197:00 amRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION
1st Apr 20197:00 amRNSNEW CORPORATE WEBSITE
29th Mar 20197:00 amRNSEXPLORATION AND DEVELOPMENT UPDATE
25th Mar 20197:00 amRNSUK INVESTOR SHOW 2019
26th Feb 20197:00 amRNSChange of Registered Office
22nd Feb 20197:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
12th Feb 20197:00 amRNSRETURN OF CAPITAL FROM SUBSIDIARY
25th Jan 20197:00 amRNSDirector/PDMR Shareholding
21st Jan 20194:29 pmRNSSHARE BUY-BACK: UPDATE
21st Jan 20197:00 amRNSKIZILCUKUR DEVELOPMENT UPDATE
16th Jan 20192:13 pmRNSReplacement: Purchase of Own Shares
16th Jan 20197:00 amRNSPurchase of Own Shares
14th Jan 20197:00 amRNSQ4 & FULL YEAR 2018 PRELIMINARY PRODUCTION RESULTS
12th Dec 20187:00 amRNSKIZILCUKUR GOLD PROJECT UPDATE
29th Nov 20188:12 amRNSEXCELLENT EXPLORATION RESULTS AT SALINBAS
29th Nov 20187:00 amRNSEXCELLENT EXPLORATION RESULTS AT SALINBAS
22nd Nov 201811:46 amRNSSHAREHOLDER UPDATE MEETING - DATE AND VENUE CHANGE
14th Nov 20187:00 amRNSCorporate Events
14th Nov 20187:00 amRNSDirector/PDMR Shareholding
12th Nov 20187:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
5th Nov 20187:00 amRNSDirector/PDMR Shareholding
29th Oct 20187:00 amRNSNEW CORPORATE VIDEO
17th Oct 20187:00 amRNSEXCELLENT RESULTS FROM SALINBAS
15th Oct 20187:00 amRNSQ3 2018 PRELIMINARY PRODUCTION RESULTS
3rd Oct 20187:00 amRNSKIZILTEPE MINE SITE VISIT
28th Sep 20187:00 amRNSINTERIM RESULTS
17th Sep 20187:00 amRNSPOTENTIAL TO EXPAND THE IVRINDI GOLD RESOURCE
16th Aug 20187:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
17th Jul 201811:54 amRNSDirector/PDMR Shareholding
16th Jul 20182:15 pmRNSDirector/PDMR Shareholding
11th Jul 20187:00 amRNSQ2 2018 PRELIMINARY PRODUCTION RESULTS
2nd Jul 20184:21 pmRNSDirector/PDMR Shareholding
29th Jun 20184:45 pmRNSDirector/PDMR Shareholding
29th Jun 201812:13 pmRNSResult of AGM
29th Jun 20187:00 amRNSAGM Statement
28th Jun 20187:00 amRNSSALINBAS JORC EXPLORATION TARGET
21st Jun 20181:50 pmRNSDirector/PDMR Shareholding
13th Jun 20187:00 amRNSKIZILCUKUR DEVELOPMENT UPDATE
8th Jun 20185:51 pmRNSDirector/PDMR Shareholding
5th Jun 20181:01 pmRNSDirector/PDMR Shareholding
4th Jun 20187:00 amRNSFINAL RESULTS FOR THE YEAR 31 DECEMBER 2017
31st May 20187:00 amRNSSIGNIFICANT RESOURCE INCREASE AT KEPEZ PROSPECT
9th May 20187:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
8th May 20188:30 amRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION
16th Apr 20187:25 amRNSQ1 2018 PRELIMINARY PRODUCTION RESULTS
10th Apr 20187:00 amRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION
9th Apr 20188:25 amRNSTAVSAN RESOURCE UPDATE
16th Mar 20187:00 amRNSDirector/PDMR Shareholdings
14th Mar 20182:17 pmRNSDirector/PDMR Shareholdings
12th Mar 20187:00 amRNS2018 PRODUCTION GUIDANCE

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.