Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.50
Bid: 2.40
Ask: 2.60
Change: -0.10 (-3.85%)
Spread: 0.20 (8.333%)
Open: 2.65
High: 2.65
Low: 2.45
Prev. Close: 2.60
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2018 PRELIMINARY PRODUCTION RESULTS

16 Apr 2018 07:25

RNS Number : 9545K
Ariana Resources PLC
16 April 2018
 

 

 

 

 

 

 

16 April 2018

AIM: AAU

 

Q1 2018 PRELIMINARY PRODUCTION RESULTS

 

Ariana Resources plc ("Ariana" or "the Company"), the exploration and development company with gold mining operations in Turkey, is pleased to announce its preliminary production results for the quarter ended 31 March 2018 for the Kiziltepe Mine ("Kiziltepe" or "the Project"). Kiziltepe is part of the Red Rabbit Joint Venture ("JV") with Proccea Construction Co. and is 50% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S. ("Zenit").

 

First Quarter Preliminary Production Results*:

 

· Gold production for the quarter was 4,866 ounces, an 8% increase quarter on quarter ("QoQ").

 

· The Company maintains its full year production guidance of 20,000 ounces Au.

 

· Total ore processed for the quarter was 44,897t, consistent with expected performance.

 

· The average head grade to the plant was 3.85 g/t Au.

 

· Quarterly open pit ore mined was c. 68,600t, at an average mined grade of 4.5 g/t Au, a 37% increase in tonnes and a 32% increase in grade QoQ.

 

· Open pit total material movement for the quarter was c. 914,000t.

 

· Average metallurgical plant recovery of gold for the quarter was 95.1%.

 

* All figures are given gross with respect to the JV.

 

 

Dr. Kerim Sener, Managing Director, commented:

 

"The performance of Kiziltepe continues to exceed feasibility expectations and this quarter of production marks a solid start to 2018. First quarter gold production was 8% higher than the previous quarter, augmented by a 4% increase in gold recovery from the processing plant. During the current quarter, we are expecting output to increase further based on our 2018 mining schedule and particularly as we start to access higher grade areas of the Arzu South vein. Consequently, we are confident in delivering positively against our production guidance for 2018."

 

Q1 2018 Preliminary Production Results

 

Unit

Q1 2018 (preliminary)

Q4 2017

Q1 2017

Open Pit - material moved (wet)

Tonnes

913,666

1,284,795

n/a

Open Pit - ore mined (wet)

Tonnes

68,591

49,885

n/a

Open Pit - mined grade

g/t Au

4.50

3.41

n/a

Process plant throughput

Tonnes

44,897

45,381

n/a

Plant feed grade

g/t Au

3.85

3.79

n/a

Metallurgical recovery rate

%

95.1

91.6

n/a

Gold produced

Troy Ounces

4,866

4,501

n/a

Silver produced

Troy Ounces

30,864

35,095

n/a

 

 

The Company will publish full results for the quarter ending 31 March 2018 by early May 2018.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

Kerim Sener, Managing Director

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

Adam James / Tom Salvesen

Yellow Jersey PR Limited

Tel: +44 (0) 7544 275 882

Tim Thompson / Harriet Jackson

/ Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

 

Editors' Note

 

About Ariana Resources:

 

Ariana is an exploration and development company with mining operations focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey, the largest gold producing country in Europe. The Company is developing a portfolio of prospective licences originally selected on the basis of its in-house geological and remote-sensing database, which now contain a total of 1.6 million ounces of gold and other metals (as at end-2017). Ariana's objective is to cost-effectively add value to its projects through focused exploration and to develop its operations, primarily through well-financed joint ventures.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, form part of a 50:50 Joint Venture with Proccea Construction Co. The Kiziltepe Sector of the Red Rabbit Project is fully-permitted and is currently in production. The total resource inventory at the Red Rabbit Project and wider project area stands at c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

In north-eastern Turkey, Ariana owns 100% of the Salinbas Gold Project, comprising the Salinbas gold-silver deposit and the Ardala copper-gold-molybdenum porphyry among other prospects. The total resource inventory of the Salinbas project area is c. 1 million ounces of gold equivalent. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

 

Ends.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGURWCUPRUAQ
Date   Source Headline
12th Jan 202112:15 pmRNSDirector/PDMR Shareholding
12th Jan 20217:00 amRNS2020 PRODUCTION RESULTS AND GENERAL UPDATE
11th Jan 20215:14 pmRNSHolding(s) in Company
30th Dec 202012:29 pmRNSRESULT OF GENERAL MEETING
14th Dec 20207:01 amRNSINVESTOR WEBINAR
14th Dec 20207:00 amRNSPUBLICATION OF CIRCULAR AND GENERAL UPDATE
9th Dec 202012:45 pmRNSDirector/PDMR Shareholding
7th Dec 20208:00 amRNSINCREASE IN JORC RESOURCES AT THE MAGELLAN PROJECT
7th Dec 20207:00 amRNSJOINT VENTURE CONDITIONAL AGREEMENTS COMPLETED
2nd Dec 20207:00 amRNSCONDITIONAL AGREEMENT TO SELL SATELLITE PROJECTS
23rd Nov 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
6th Nov 20207:00 amRNSDirector/PDMR Shareholding
5th Nov 202012:28 pmRNSHolding(s) in Company
30th Oct 202010:49 amRNSUPDATE ON PROPOSED JOINT VENTURE
27th Oct 20209:38 amRNSDirector/PDMR Shareholding
27th Oct 20207:00 amRNSDirector/PDMR Shareholding
20th Oct 20207:00 amRNSARIANA LAUNCHES NOT-FOR-PROFIT INITIATIVE
15th Oct 20207:00 amRNSMAIDEN JORC RESOURCE AT MAGELLAN PROJECT, CYPRUS
12th Oct 20207:00 amRNSQ3 2020 PRELIMINARY PRODUCTION RESULTS
30th Sep 20207:00 amRNSINTERIM RESULTS
29th Sep 20207:00 amRNSUPDATE ON PROPOSED JOINT VENTURE
2nd Sep 20207:00 amRNSNEW HIGH-GRADE VEIN DISCOVERED AT KIZILTEPE
28th Aug 202012:30 pmRNSResult of AGM
27th Aug 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
20th Aug 20207:00 amRNSIssue of Shares
10th Aug 20207:47 amRNSDirector/PDMR Shareholding
6th Aug 20207:00 amRNSDirector/PDMR Shareholding
4th Aug 20208:30 amRNSREVISED AGREEMENT WITH KEFI MINERALS PLC
30th Jul 20207:00 amRNSMAJOR RESOURCE UPDATE: SALINBAS PROJECT
28th Jul 20207:30 amRNSINVESTOR WEBINAR
28th Jul 20207:00 amRNSFINAL RESULTS FOR THE YEAR 31 DECEMBER 2019
9th Jul 20207:00 amRNSQ2 2020 PRELIMINARY PRODUCTION RESULTS
1st Jul 20207:00 amRNSCOMMITMENT BY ÖZALTIN HOLDING A.S.
29th Jun 202012:48 pmRNSFINAL RESULTS AND AUDIT UPDATE
15th Jun 20207:00 amRNSIVRINDI LICENCE AND METALLUGICAL UPDATE
11th Jun 20207:49 amRNS50% INCREASE IN TAVSAN RESOURCE
26th May 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
13th May 20207:00 amRNSCOMPLETION OF INITIAL EARN-IN ON VENUS MINERALS
11th May 20207:00 amRNSKIZILCUKUR JORC RESOURCE UPDATE
7th May 202012:34 pmRNSSHAREPROPHETS SHARES CONFERENCE 2020
1st May 202010:55 amRNS100% REPAYMENT OF CAPITAL LOAN
30th Apr 20201:30 pmRNSEXTENSION AGREEMENT
23rd Apr 20202:05 pmRNSSecond Price Monitoring Extn
23rd Apr 20202:00 pmRNSPrice Monitoring Extension
23rd Apr 20207:00 amRNSSIGNIFICANT RESOURCE UPDATE: KIZILTEPE
15th Apr 20207:00 amRNSQ1 2020 PRELIMINARY PRODUCTION RESULTS
2nd Apr 20207:00 amRNSKEPEZ RESOURCE DEVELOPMENT UPDATE
1st Apr 20207:00 amRNSDUE DILIGENCE UPDATE
26th Mar 20207:00 amRNSMAIDEN DIVIDENDS FROM SUBSIDIARY
24th Mar 20202:05 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.