KIZILTEPE QUARTERLY OPERATIONAL UPDATE

22 Nov 2019 07:00

RNS Number : 2749U
Ariana Resources PLC
22 November 2019
ย 

ย 

ย 

ย 

ย 

ย 

ย 

22 November 2019

AIM: AAU

ย 

KIZILTEPE QUARTERLY OPERATIONAL UPDATE

ย 

Ariana Resources plc ("Ariana" or "the Company"), the exploration and development company operating in Turkey, is pleased to announce its operating results for the quarter ended 30 September 2019 for the Kiziltepe Mine ("Kiziltepe" or "the Project"). Kiziltepe is part of the Red Rabbit Joint Venture ("JV") with Proccea Construction Co. and is 50% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S. ("Zenit").

ย 

Operational Highlights*:

ย 

ยท; Record gross quarterly income of US$11.76 million at the average realised gold price of US$1,476 per ounce, against an average revenue per gold ounce of US$1,696 (due to silver credit).

ย 

ยท; Production of 6,933 ounces of gold during the quarter ending 30 September 2019.

ย 

ยท; 2019 gold production to the end of Q3 2019 totals 20,667 ounces of gold; on track to achieve annual production guidance of 25,000 ounces of gold.

ย 

ยท; Operating cash costs for the quarter are estimated at US$540 per ounce#.

ย 

ยท; Operational mill availability running at 99.6% and utilisation at 99.4% for the period.

ย 

ยท; 55,174 tonnes ore milled during the period ending 30 September 2019 at an average head grade of 4.47 g/t Au.

ย 

ยท; Process recoveries of gold remain high at 93.6% by the end of the quarter.

ย 

ยท; 78% of the US$33 million capital loan for Kiziltepe has been repaid as at quarter ending 30 September 2019; on track to fully repay loan by April 2020.

ย 

* All figures are given gross with respect to the JV.

ย 

Dr. Kerim Sener, Managing Director, commented:

ย 

"The third quarter results from the Kiziltepe Mine continue to build on a very successful year of operations. Operating cash costs per ounce for the period are estimated at US$540 per ounce, reflecting in part the pushback on the southern boundary of the Arzu South pit and the commencement of pre-stripping at Arzu North and Derya, in addition to a build-up of process plant consumables inventory and increased maintenance.

ย 

"The gold price continued to remain very favourable throughout the period, averaging US$1,474 per ounce - 13% above our feasibility base-case. This pricing environment is now reflected in our Q3 results, which demonstrates record quarterly revenue for the mine to date."

ย 

Current Developments:

ย 

ยท; Production of ore from the open-pit was 47,933 tonnes over the period, with a peak rate of over 17,444 tonnes achieved in August.

ย 

ยท; Gross capital loan repayments by Zenit to Turkiye Finans Katilim Bankasi A.S. have been made on their scheduled basis and have amounted to US$25.8 million in aggregate as at the end of September 2019 (c. US$7.2 million remaining); c. US$3.1 million was repaid in Q3 2019.

ย 

ยท; Mining operations have commenced in the Arzu North and Derya areas, supplementing production from the Arzu South pit, which is nearing the end of its operational life.

ย 

* All production figures are quoted gross with respect to the JV in this announcement.

ย 

# Operating cash costs are inclusive of on-site costs and off-site charges and royalties specific to the project. It also includes adjustments for stockpile balances at the end of each quarter, in addition to an adjustment for by-product silver. They exclude finance costs, taxes and development capital. The definition used to derive the cash costs is essentially the same as that used within the feasibility study. This cash cost was calculated based on unaudited figures obtained from Zenit.

ย 

Table 1: Production statistics for the Kiziltepe Mine in Q3 2019 and for the period mid-March 2017 to end-September 2019 (life of mine to date).

ย 

Measure

Unit

Q3 2019

Q2 2019

Q1 2019

Total Production

Life of Mine to Date

Plant feed grade

g/t Au

4.47

4.18

4.83

4.27

Process recovery of gold

%

93.6

95.2

93.7

93.0

Gold produced

Troy Ounces

6,933

6,438

7,296

57,931

Silver produced

Troy Ounces

89,478

82,988

84,109

563,823

Gross income (gold/silver sold)

US$'000

11,758

9,670

10,860

84,126

Operating cash cost of production

US$/oz

540

589

399

n/a(1)

Average realised gold price

US$/oz

1,476.17

1,307.34

1,310.71

1,300.14

Average revenue per gold ounce(2)

US$/oz

1,696.01

1,496.42

1,488.51

1,452.18

ย 

(1) Cash costs are not provided for the purposes of the life of mine due to the operation having been in ramp-up during part of the period. Costs incurred during the ramp-up period are not reflective of estimated operating costs over the longer term.

ย 

(2) Average revenue per gold ounce accounts for both the gold and silver sold during the period and is calculated by dividing the gross income by only the gold ounces sold in the period.

ย 

Summary of Project

ย 

The Kiziltepe operation is currently expected to deliver approximately an average of 20,000 oz gold equivalent per annum over eight years of initial mine life, for a total of up to 160,000 oz gold equivalent based on current resources. The operating company, Zenit Madencilik San. ve Tic. A.S. (50:50 JV between Ariana and Proccea) will continue to make repayments against its loan from Turkiye Finans Katilim Bankasi A.S. based on a contractual schedule. Construction capital loan repayments will have been completed by April 2020 and, during this time, excess cash-flow from the operation is being used to make proportional repayments of loans provided by Ariana and Proccea jointly to the JV for exploration and development respectively. After the repayment of all loans, profits from the operation will be shared on a 51:49 basis between Ariana and Proccea respectively.

ย 

Commercial production was initiated at Kiziltepe during July 2017 and formal quarterly production reporting commenced. The Company also completed a new resource estimate for the project based on recent drilling and geological interpretation. Detailed technical and economic assessments will be completed on several satellite vein systems which are not currently in the mining plan, in anticipation of these being developed in future years. The Company is currently targeting a minimum ten-year mine life, which will require the addition of a further 40,000 oz gold equivalent in reserves outside of the four main pits (Arzu South, Arzu North, Banu and Derya) that are currently scheduled to be mined. Management is confident that this can be achieved assuming the conversion of existing resources to reserves.

ย 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

ย 

ย 

Contacts:

ย 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

ย 

Kerim Sener, Managing Director

ย 

ย 

ย 

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

ย 

ย 

ย 

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

Atholl Tweedie / James Stearns

ย 

ย 

ย 

Yellow Jersey PR Limited

Tel: +44 (0) 20 3004 9512

Harriet Jackson / Dom Barretto / Henry Wilkinson

arianaresources@yellowjerseypr.com

ย 

ย 

Editors' Note

ย 

About Ariana Resources:

ย 

Ariana is an exploration and development company with mining operations focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey, the largest gold producing country in Europe. The Company is developing a portfolio of prospective licences originally selected on the basis of its in-house geological and remote-sensing database, which now contain a total of 1.6 million ounces of gold and other metals (as at end-2017). Ariana's objective is to cost-effectively add value to its projects through focused exploration and to develop its operations, primarily through well-financed joint ventures.

ย 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, form part of a 50:50 Joint Venture with Proccea Construction Co. The Kiziltepe Sector of the Red Rabbit Project is fully-permitted and is currently in production. The total resource inventory at the Red Rabbit Project and wider project area stands at c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

ย 

In north-eastern Turkey, Ariana owns 100% of the Salinbas Gold Project, comprising the Salinbas gold-silver deposit and the Ardala copper-gold-molybdenum porphyry among other prospects. The total resource inventory of the Salinbas project area is c. 1 million ounces of gold equivalent. An NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

ย 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

ย 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

ย 

Glossary of Technical Terms:

ย 

"Au" chemical symbol for gold;

ย 

"g/t" grams per tonne;

ย 

"oz" Troy ounces.

ย 

ย 

Ends.

ย 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
ย 
END
ย 
ย 
UPDBBBFTMBBTBRL
Date   Source Headline
29th May 202612:45 pmRNSResult of AGM and Updated Corporate Presentation
26th May 20268:30 amRNSRevised PFS for Optimised Dokwe Gold Project
26th May 20267:00 amRNSAgreement for Strategic Investment - Tranche 2 CDI
18th May 20267:00 amRNSSale of 13.6% Interest in Zenit for US$19.5m Cash
14th May 20267:00 amRNSResource Growth Potential Identified at Dokwe
7th May 20267:00 amRNSUpdate on Dokwe Project Feasibility Activities
30th Apr 20267:00 amRNSQuarterly Activities Report 31 March 2026
29th Apr 20267:00 amRNSNotice of AGM
14th Apr 20267:00 amRNSAppointment of New Non-Executive Chairman
31st Mar 202610:30 amRNSAppointment of Chief Financial Officer
31st Mar 20267:00 amRNSFinal Audited Results for the Year Ended 31 Dec 25
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
25th Feb 202612:00 pmRNSResult of GM
4th Feb 20267:00 amRNSSettlement of Outstanding Debt to RiverFort & TVR
2nd Feb 20267:00 amRNS-RAttendance at 121 Mining Investment, Cape Town
30th Jan 202611:00 amRNSQuarterly Activities Report 31 December 2025
23rd Jan 20261:32 pmRNSXinhai Strategic Investment and Notice of GM
21st Jan 20267:00 amRNSDrilling Results from Main & South Zones at Tavşan
8th Jan 20267:00 amRNSHolding(s) in Company
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
12th Dec 20257:00 amRNSDokwe Drilling Update
9th Dec 20257:00 amRNSTerm Sheet for Strategic Investment in Dokwe
3rd Dec 202511:00 amRNSTavsan First Pour
27th Nov 20257:00 amRNSKizilcukur Drilling Identifies Potential Extension
24th Nov 20259:15 amRNS-RMines and Money London Conference Attendance
13th Nov 20257:00 amRNSHigh-Grade Gold in Drilling Results at Tavsan Mine
4th Nov 20257:00 amRNSExploration Drilling Commences at >1Moz Dokwe
31st Oct 20257:00 amRNSQuarterly Activities Report
23rd Oct 20257:00 amRNSSignificant Dokwe Exploration Update
15th Oct 20257:00 amRNSRig Mobilisation for Drilling Programme at Dokwe
9th Oct 20257:00 amRNS-RPresentation at Marketopen's Investor Sundowner
8th Oct 20257:00 amRNSTavşan Mine is now Fully Operational
30th Sep 202512:00 pmRNS-RCorporate Presentation - September 2025
29th Sep 20257:00 amRNSInterim Results
16th Sep 20257:00 amRNSSummary of Projects with Drilling Planned at Dokwe
10th Sep 20257:00 amRNSCommence Trading on Australian Securities Exchange
8th Sep 202512:37 pmRNSDual Listing on ASX and Total Voting Rights
28th Aug 20257:00 amRNS-RAfrica Down Under Conference Attendance in Perth
22nd Aug 20258:45 amRNSResults of ASX Offer for Dual Listing
18th Aug 20259:30 amRNSDirector/PDMR Shareholding
15th Aug 20258:21 amRNSDual Listing – Close of ASX Offer
8th Aug 20257:00 amRNSASX Offer Open and Tavsan Update
29th Jul 202510:45 amRNSLodgement of ASX Dual Listing Prospectus
28th Jul 20258:36 amRNSDual Listing – Close of Institutional Bookbuild
14th Jul 20257:00 amRNSOperational Update: Tavsan
9th Jul 20251:35 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.