Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.775
Bid: 2.70
Ask: 2.85
Change: -0.05 (-1.77%)
Spread: 0.15 (5.556%)
Open: 2.85
High: 2.85
Low: 2.70
Prev. Close: 2.825
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

KIZILCUKUR PROJECT RECEIVES MINING PERMIT

18 Nov 2015 07:00

RNS Number : 0659G
Ariana Resources PLC
18 November 2015
 

 

18 November 2015

 

AIM: AAU

 

ARIANA RESOURCES PLC

 

 

KIZILCUKUR PROJECT RECEIVES MINING PERMIT

 

Ariana Resources plc ("Ariana" or "the Company"), is pleased to announce that it has received its mining permit for the Kizilcukur Project, which is located approximately 22km to the northeast of its Kiziltepe Mine. Kizilcukur is located outside of the Red Rabbit joint venture with Proccea Construction Co. and is 100% owned by Ariana.

 

Highlights:

 

· 51 hectare Mining Permit for gold and silver secured for the Kizilcukur Project.

 

· Mining licence granted expires on the 24th September 2022, with the possibility for extension.

 

· Land access and forestry permits already in place for exploration.

 

· Drilling on the project is now complete and sampling is ongoing.

 

 

Dr. Kerim Sener, Managing Director, commented:

 

"We are very pleased to have received our mining permit for the Kizilcukur Project, particularly while we have been in the process of completing our recent drilling and sampling programme. Receipt of this permit will enable the Company to complete trial mining on the Project, as we look towards defining a potentially mineable satellite resource for our Kiziltepe operation. The identification of satellite resources to the Kiziltepe Mine is an important part of our strategy to extend the life of mine and to provide options within our mining schedule."

 

 

Details of the Kizilcukur Project

 

The Kizilcukur Project consists of one licence located in the Balikesir Province in Western Turkey (coordinates: 626150 m E; 4360440 m N). The property lies 22km to the northeast (straight line) and 50km by road from the Kiziltepe Sector of the Company's Red Rabbit Project. A royalty will be payable to Dogu Akdeniz Mineralleri San. ve Tic. Ltd. of 2% Net Smelter Return on commercial production from the Project.

 

The Project covers an area containing a series of sub-parallel quartz veins hosted by ophiolitic units that trend northwest and extend for at least two kilometres. The main vein exhibits classic low-sulphidation epithermal features and attains a maximum true width of 8m. The western quartz vein extends over a strike length of 800m. Composite rock chip sampling of 80m strike along this quartz vein returned encouraging assay results of 6m at 3.3 g/t gold, 2m at 9.6g/t gold and 1m at 7.2 g/t gold. The peak rock-chip assay result in this area was 152 g/t gold and 1,320 g/t silver.

 

A JORC Inferred resource of 162,000 tonnes @ 2.39 g/t gold and 48.5 g/t silver has already been established at Kizilcukur based on 17 historic drill holes, as announced by the Company on 29 October 2013. The current drilling programme was designed to test the near-surface resource potential along strike of the areas previously tested by drilling. A total of 1,598m of new Reverse Circulation (RC) drilling have now been completed in this area and rock-saw channel sampling is in the process of being completed over the veins.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

 

Kerim Sener, Managing Director

 

 

 

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

 

 

 

Beaufort Securities Limited

Tel: +44 (0) 20 7382 8300

Jon Belliss

 

 

 

Loeb Aron & Company Ltd.

Tel: +44 (0) 20 7628 1128

John Beresford-Peirse

 

 

 

IFC Advisory Limited

Tel: +44 (0) 20 3053 8671

Tim Metcalfe

Graham Herring

Heather Armstrong

 

 

 

Dr Kerim Sener, BSc (Hons), MSc, PhD, is the Managing Director of Ariana Resources plc. A graduate of the University of Southampton in Geology, he also holds a Master's degree from the Royal School of Mines (Imperial College, London) in Mineral Exploration and a doctorate from the University of Western Australia. He is a Fellow of The Geological Society of London and has worked in geological research and mineral consultancy in Africa, Australia and Europe. He has read and approved the technical disclosure in this regulatory announcement.

 

About Ariana Resources:

 

Ariana is an exploration and development company focused on epithermal gold-silver and porphyry copper-gold deposits in Turkey. The Company is developing a portfolio of prospective licences selected on the basis of its in-house geological and remote-sensing database, on its own in western Turkey and in Joint Venture with Eldorado Gold Corporation in north-eastern Turkey. Eldorado owns 51% of this joint venture and are fully funding all exploration work on the JV properties, while Ariana owns 49%. The total resource inventory within this JV is 1.09 million ounces of gold.

 

The Company's flagship assets are its Kiziltepe and Tavsan gold projects which form the Red Rabbit Gold Project. Both contain a series of prospects, within two prolific mineralised districts in the Western Anatolian Volcanic and Extensional (WAVE) Province in western Turkey. This Province hosts the largest operating gold mines in Turkey and remains highly prospective for new porphyry and epithermal deposits. These core projects, which are separated by a distance of 75km, are presently being assessed as to their economic merits and now form part of a Joint Venture with Proccea Construction Co. The total resource inventory at the Red Rabbit Project stands at 475,000 ounces of gold equivalent.

 

Beaufort Securities Limited and Loeb Aron & Company Ltd. are joint brokers to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

 

Glossary of Technical Terms:

 

"g/t" grams per tonne

 

"JORC" the Joint Ore Reserves Committee

 

"m" Metres

 

"oz" Ounces

 

 

Ends

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUBOBRVAAAAAA
Date   Source Headline
24th Mar 202011:06 amRNSSecond Price Monitoring Extn
24th Mar 202011:00 amRNSPrice Monitoring Extension
24th Mar 20209:05 amRNSSecond Price Monitoring Extn
24th Mar 20209:00 amRNSPrice Monitoring Extension
19th Mar 20207:00 amRNS2020 PRODUCTION GUIDANCE
17th Mar 20201:32 pmRNSCHANGE OF AUDITOR
26th Feb 20204:33 pmRNSDirector/PDMR Shareholding
25th Feb 20202:08 pmRNSDirector/PDMR Shareholding
21st Feb 20206:27 pmRNSDirector/PDMR Shareholding
21st Feb 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
14th Feb 20207:00 amRNSDUE DILIGENCE UPDATE
22nd Jan 20207:00 amRNSHIGH-GRADE ZONES IDENTIFIED AT TAVSAN
16th Jan 20207:00 amRNSQ4 2019 PRELIMINARY PRODUCTION RESULTS
2nd Jan 20203:40 pmRNSDirector/PDMR Shareholding
31st Dec 20198:45 amRNSDirector/PDMR Shareholding
24th Dec 20197:00 amRNSDirector/PDMR Shareholding
17th Dec 20197:00 amRNSARZU SOUTH DRILLING RESULTS
9th Dec 20197:00 amRNSDUE DILIGENCE UPDATE
3rd Dec 20195:14 pmRNSHolding(s) in Company
2nd Dec 20197:00 amRNSCOPPER-GOLD PROJECTS EARN-IN
25th Nov 20192:05 pmRNSSecond Price Monitoring Extn
25th Nov 20192:00 pmRNSPrice Monitoring Extension
25th Nov 201912:27 pmRNSNON-BINDING MoU FOR SALINBAS JOINT VENTURE
22nd Nov 20197:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
18th Nov 20198:54 amRNSReplacement: ARZU NORTH DRILLING RESULTS
18th Nov 20197:00 amRNSARZU NORTH DRILLING RESULTS
14th Nov 20197:00 amRNSCORPORATE EVENTS
21st Oct 20197:00 amRNSQ3 2019 PRELIMINARY PRODUCTION RESULTS
17th Oct 20197:00 amRNSDERYA DRILLING RESULTS
16th Oct 20197:00 amRNSROYALTY AND DATABASE ACQUISITION
15th Oct 20197:00 amRNSSALINBAS GOLD PROJECT UPDATE
1st Oct 20197:00 amRNSSHAREHOLDER CALL
30th Sep 20197:00 amRNSINTERIM RESULTS
24th Sep 20197:00 amRNSNOTICE OF RESULTS AND SHAREHOLDER CALL
9th Sep 20197:00 amRNSTAVSAN PROJECT UPDATE
28th Aug 20197:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
22nd Aug 20197:00 amRNSSALINBAS GOLD PROJECT UPDATE
17th Jul 20197:00 amRNSQ2 2019 PRELIMINARY PRODUCTION RESULTS
11th Jul 20197:00 amRNSPOSITIVE DRILLING RESULTS AT SALINBAS GOLD PROJECT
28th Jun 20191:02 pmRNSResult of AGM
28th Jun 20197:00 amRNSAGM Statement
11th Jun 20191:00 pmRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION
6th Jun 20197:00 amRNSKIZILCUKUR DRILLING RESULTS
5th Jun 20194:41 pmRNSSecond Price Monitoring Extn
5th Jun 20194:35 pmRNSPrice Monitoring Extension
5th Jun 20197:00 amRNSFINAL RESULTS FOR THE YEAR 31 DECEMBER 2018
20th May 20197:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
14th May 20197:00 amRNSSALINBAS LICENCE, FORESTRY PERMITS AND DRILLING
7th May 20197:00 amRNSARZU NORTH DRILLING RESULTS
30th Apr 20197:00 amRNSSHAREHOLDER UPDATE MEETING AND PRESENTATION

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.