Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.20    0.00 (0.00%)
Bid:
1.15
Ask:
1.25
Spread: 0.10 (8.696%)
Market Cap: £15.97m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Operations Update

7 Apr 2020 07:00

RNS Number : 9813I
88 Energy Limited
07 April 2020
 

7th April 2020

 

This announcement contains inside information

 

88 Energy Limited

 

Charlie-1 Confirms Large Condensate Discovery in Torok Formation

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) provides the following update related to operations for the Charlie-1 appraisal well, on the North Slope of Alaska.

 

Highlights

· Condensate discovery confirmed in Torok Formation

· Economic review underway to assess commerciality

 

Detail

88 Energy confirms that the Charlie-1 appraisal well has proved the presence of mobile hydrocarbons, in the form of condensate gas, in the Torok Formation in both the Middle Stellar and Lower Stellar targets. Hydrocarbons were successfully recovered to surface from both targets using a state-of-the-art downhole sampling tool (Ora). Further analysis to confirm the composition and gas to liquid ratio will now be undertaken. Upper Stellar was not tested due to the sub optimal location that it was intersected by the well.

 

Sampling was also successfully completed in the Schrader Bluffs Formation from the Indigo target, which was found to be water bearing. The Charlie target was found to be poorly developed and was not sampled. Oil shows in this interval are deemed to be related to residual oil that is not trapped in the system.

 

In the Seabee Formation, an attempt was made to take a sample from the Lower Lima target, being the better of the two Lima targets. This attempt was unsuccessful due to insufficient reservoir quality; however, given that these targets were not intersected optimally, there still may be potential for higher quality reservoir at a different location. Excellent Vertical Seismic Profile ("VSP") data was obtained in the well, which will now be used in conjunction with other log data and the existing 3D seismic, to remap these targets. Sidewall core analysis will also assist with determining where improved reservoir is likely to exist. Mud gas, observed while drilling, in the Seabee indicated that the hydrocarbons at this horizon are heavier than those in the Torok and this is the horizon where "live oil" was observed across the shakers in the nearby Malguk-1 well.

 

Detailed logs and sidewall cores were also acquired in the HRZ formation, which will now be analysed over the coming months. The HRZ remains a viable target and options to commercialise this potentially large resource continue to be pursued.

 

Premier has informed the Joint Venture that it intends to withdraw from the project, as the well did not meet its pre-drill expectations.

 

The cost of the well remains within the expected budget and 88E does not expect to incur any costs in relation to the drilling.

 

The well will now be plugged and abandoned ("P&A") in line with standard industry practice. The decision to P&A the well instead of moving to suspension or testing was made for a number of reasons:

· Further analysis is required to determine whether a discovery of this nature can be commercialised on the North Slope, given the likely high gas content

· An optimum stimulation and test at this juncture is not possible in the timeframe required due to the different phase of the hydrocarbons encountered and the length of season remaining

· Uncertain access to various personnel that may be required in the event of unforeseen circumstances/emergency situations, in light of the COVID-19 pandemic

· The lateness of the season and exposure to potential early break-up, which could result in the rig being stranded on the wrong side of the Kuparuk River at significant cost

· Reluctance to create a potential future liability if analysis determines that the well should be P&A'd in a subsequent season, at substantially higher cost

 

 

Managing Director of 88 Energy, Dave Wall, stated: "Charlie-1 has delivered a mixed result. On the one hand, we have confirmed the presence of mobile hydrocarbons in the primary targets of the well but, at the same time, there are challenges that need to be more fully understood related to whether these can be commercialised on the North Slope. Samples of the hydrocarbons have been recovered to surface and will now be the subject of further analysis in the coming months.

 

The risks related to the shallower targets have unfortunately been borne out, with one found to be water bearing and the other to have no sand development.

 

The Lima targets both remain valid and, using the VSP, logs and cores from Charlie-1, we hope to be able to enhance the prospectivity of the Seabee Formation on our acreage.

 

We also hope to glean valuable information in regard to the HRZ potential in this area of Project Icewine and analysis will take place over the next few months.

 

Further details will be released as the required analyses from Charlie-1 are completed."

 

Reporting requirements under LR 5.30

The Charlie-1 well is located on the North Slope of Alaska, ADL 393380, where 88 Energy has a 30% working interest. The well penetrated sandstones in seven stacked targets and shale in one target. No flow tests were undertaken; however, gas condensate samples were retrieved to surface from the Torok formation at 10,506' and 10,656' using a downhole sampling tool (Ora) run during the wireline operation.

 

This announcement has been authorised by the Board.

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

 Email: admin@88energy.com 

 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

Hartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities Tel: + 44 131 220 6939

Neil McDonald/Derrick Lee

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDFFFSISVIRIII
Date   Source Headline
11th Sep 201511:46 amRNSLodgement of Interim Report
10th Sep 20157:56 amRNSRig Contract Executed for Imminent Spud of Icewine
1st Sep 20158:15 amRNSIssue of Options
28th Aug 20157:00 amPRNIssue of Equity
27th Aug 201510:21 amPRNPublication of Prospectus
26th Aug 20158:08 amPRNTransfer of Title Complete - Icewine
24th Aug 20159:11 amPRNClose of Bank of America Funding Facility
21st Aug 20157:00 amPRNResult of EGM
3rd Aug 201512:43 pmRNSEdison issues research update on 88 Energy
30th Jul 20159:50 amPRNIssue of Equity
29th Jul 201510:10 amPRNPublication of Prospectus
29th Jul 20159:44 amPRNQuarterly Activity Report
22nd Jul 20157:55 amPRNNotice of EGM
22nd Jul 20157:00 amRNSCompletion of A$12m Placement
20th Jul 20158:00 amRNSASX Trading Halt
9th Jul 20157:00 amRNSTitle Process Update
7th Jul 20154:40 pmRNSSecond Price Monitoring Extn
7th Jul 20154:35 pmRNSPrice Monitoring Extension
29th Jun 20157:00 amPRNInvestor Presentation
24th Jun 20157:00 amRNSConditional US$50m Debt Facility with BoA
15th Jun 20152:29 pmRNSChange of Adviser
4th Jun 20157:00 amPRNExcellent Drill Results Reported Nearby
29th May 20157:00 amPRNMorocco Exit Finalised
28th May 20157:00 amPRNAcreage Award Update
20th May 20157:40 amPRNGeneral Manager Alaskan Operations Appointed
14th May 20157:00 amPRNProject Icewine - Field Trip Highlights
1st May 20157:00 amPRNChange of Registered Office
24th Apr 20157:00 amPRNResult of AGM
24th Apr 20157:00 amPRNQuarterly Report - 31 March 2015
16th Apr 20157:00 amPRNOperations Update - Project Icewine
30th Mar 20158:18 amPRNAnnual Financial Report
26th Mar 20157:00 amPRNAGM Statement
24th Mar 20157:06 amPRNAdmission of Shares
24th Mar 20157:00 amPRNInvestor Presentation
23rd Mar 20157:00 amPRNClose of Cleansing Offer
17th Mar 20157:00 amPRNIssue of Equity
17th Mar 20157:00 amPRNSupplementary Prospectus
5th Mar 20151:27 pmPRNChange of AIM ticker and ISIN
5th Mar 20158:16 amPRNSignificant Shareholder Announcement
3rd Mar 20158:21 amPRNIssue of Equity
26th Feb 20157:00 amPRNChange of Company Name
18th Feb 20157:00 amPRNIssue of Equity
18th Feb 20157:00 amPRNSuccessful Placement
16th Feb 20157:00 amPRNProspectus
12th Feb 20157:00 amPRNResult of EGM
29th Jan 20157:00 amPRNProject Icewine Presentation - February 2015
27th Jan 20157:00 amPRNQuarterly Activities Report
23rd Jan 20154:40 pmRNSSecond Price Monitoring Extn
23rd Jan 20154:35 pmRNSPrice Monitoring Extension
20th Jan 20154:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.